Ronito Gilua

QA/QC Engineer/Manager

acyzcz@r.postjobfree.com

MP +63-045*******

Summary of Experience

I have had over 25 years’ experience in Maintenance, Quality Construction & Commissioning roles across Minerals & Mining, Offshores Platforms, Oil & Gas refineries, LNG Tankages, Infrastructure and Power Station Projects. This includes Inspections, development of Project Quality plans & Control procedures, Audits & Audit Programmes based on ISO 9001, Project management plans and Client requirements. Management of site Quality plans & procedures, Engineering documents, ITP’s, ITR’s, NCR’s, CAR’s, KPI’s and QA applications with focus on safe with a zero harm expectation. Ensuring installation is compliant to Industry Standards and Project specifications. Other responsibilities are to setup & manage the completions handover from EPCM to client as well as compiling MDR handover from Contractor to EPCM/Client. I have had experience in both green and brown field projects with client interface being a major part of the projects. Personal Qualities

• Honest, reliable & hard working

• High level of motivation and enthusiasm

• Work well as part of a team or individually

• Punctual & dependable

• Safety conscious

• Dedicated and results driven

• Good communication skills

• Ability to utilise initiative

• Excellent Multi discipline and problem solving skills

• Extensive SMP Project knowledge from Both an EPCM and/or Contractor role Qualifications and Skills

• QA Auditing Diploma

• Machine Shop Practice Engineering Diploma

• Bachelor of Science in Mechanical Engineering Diploma

• CSWIP 3.1 Welding Inspection Certificate

• SAI G Internal Auditing Certificate

• SAI G Management System Auditing Certificate

• ISO 9001:2007/2008 & various other standards

• Western Australian Construction White Card

• Working on Height & Confine Space Certificates

• Competent in reading & understanding contracts, specs, drawings and schedules

• Good communication – ability to build rapport and strong working relationships with people from diverse background.

Employment History

Date: October 2015 - June 2016

Project: International Turnkey Projects Company. (ITP), TAN Burrup Ammonia Nitrate plant W.A Role: Quality Manager.

Duties & Responsibilities

• Development, implementation and management of the organization Quality Management.

• Ensure that the organization Quality Management System conforms to customer internal ISO 9001 and regulatory legal requirement.

• Monitoring measurement and reviews of internal process especially affect the quality of the organization product.

• Manage all SMP & electrical site Inspection and coordinate to all supervisors for signed off all ITR’s & ITP’s.

• Inspect and monitor all issuance consumables at storeroom, welding rod oven’s temperature and update toque wrench calibration cert.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report, Corrected action request & follow up all the issue to close out.

• Revised all ITP’s & ITR’s return from the client with comments.

• Prepare test packages documents for site join inspection.

• Attend daily progress meeting with client QA/QC and construction supervisors.

• Monitor flanges management, inspect and audit all signed off flanges management.

• Final walk down with the client for practical completion handover.

• Review documentation for final dossiers & handover. Employment History

Date: March 2014 - October 2015

Project: Downer EDI Engineering Power Pty. Ltd., TAN Burrup Ammonia Nitrate Plant W.A Role: Senior SMP QA/QC Supervisor.

Duties & Responsibilities:

• Travel outside Australia (Overseas) to attend international coordination meeting for modules and lost ship material inspection and final sign off of modules acceptance.

• Overseas punch listing before modules ready for shipment.

• Check all the Dosser of contractor compilation as a requirement before shipment to Western Australia.

• Manage all SMP site Inspection and coordinate to all supervisors for signed off all ITR’s & ITP’s.

• Review welder qualification and welding procedures, weld traceability, material traceability, third party testing, NDT reports, Hydro testing packages, Leak testing, Post Weld Heat Treatment.

• Inspect and monitor all issuance consumables at storeroom, welding rod oven’s temperature and update toque wrench calibration cert.

• Monitor NCR’s, Surveillance report, Field Discrepancy Report, Corrected action request & follow up all the issue to close out.

• Revised all ITP’s return from the client with review & comments and resubmit to client for final approval.

• Check survey report & Inspect all concrete foundation for acceptance sign off before the structural modules installation.

• Witness all alignments of pipe nozzle to equipment nozzles tanks, vessel, pumps etc. to ensure all alignment are complies as per client spec.

• Inspect and witness all tanks and vessels internal inspection for final sign off.

• Review all painting reports and conduct site inspection.

• Attend daily progress meeting with client QA/QC and construction supervisors.

• Prepare all the packages for inspection and Issue notification of inspection to client.

• Walk down with the client for practical completion handover. Employment History

Date: Sept. 2013 - Feb. 2014

Project: Forge Group Construction Ltd., TAN Burrup Ammonia Nitrate plant W.A Role: Senior QA/QC Coordinator / Manager.

Duties & Responsibilities:

• Travel overseas for coordination meeting, inspection and acceptance before the modules shipment to Western Australia and ensure all compliance to Australian standard.

• Provide governance and oversight of quality management on the Project

• Implement and maintain project Quality Assurance Plans and Procedures

• Review and comment on quality plans of contractors and sub-contractors ITP's ITR’s.

• Conduct audit and surveillances to ensure procedures are followed and updated

• Attendance of contractor and sub-contractor audits

• Verify the effectiveness of contractors Quality Management Systems for fabrication & construction

• Ensure quality requirement deliverables are met as per Project Execution Plans

• Prepare audit and surveillances reports

• Identify report, control and resolve findings detected during audits and other verification activities

• Liaison with Contractor and Subcontractors to ensure Quality requirements are met.

• Check all the MDR of subcontractor compilation as per client requirements.

• Manage all Site Inspector and coordinate to all supervisors for signed off documents.

• Prepare Quality plans, Inspection and Test Plans, Welder qualification and procedures, Welding traceability, material Traceability, Third party testing ( NDT, Hydro testing, Leak testing, Post Weld Heat Treatment.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report, CAR &close out.

• Prepare all FIC’s, ITR’s and check sheet for sign off and surveillance report

• Final punch list close out for Practical handover.

• Responsible for the management of handover documents to obtain practical completion and compilation of MDR for final mechanical completion. Employment History

Date: April 2013 - Sept 2013

Project: Forge Group Power Construction Ltd. Yarmina Power Station Generation Plant BHP Project Newman, W.A Role: Site QA/QC Inspector/Coordinator.

Duties & Responsibilities:

• Ensure correct implementation of QA/QC systems and procedures.

• Implement and maintain quality management compliance.

• QA/QC documentation preparation and coordination.

• Prepare all FIC’s ITR’s and check sheet for sign off, surveillance report daily & site inspection.

• Check welding preparation piping gap and hi & low alignment before commence for welding.

• Coordinate to engineering department during final inspection FIC and ITP sign off onsite.

• Witness all rotating equipment alignments, pressure testing such as hydro testing and vacuum testing water flushing, air blowing, air drying, nitrogen inerting, denso pipe tensioning wrapping and holiday testing.

• Inspect all internal stationary equipment tanks, vessels, gas turbine chimney etc.

• MDR compilation as per client requirements.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report & Correction Action Request.

• Review &revised all ITP’s return back from the client with comments and resubmit to client for review & approval.

• Final punch list close out for final handover.

Employment History

Date: March 2012 - April 2013

Project: Construction Industries Australia Ltd. Sino Iron Project Cape Preston Karratha, Pilbara W.A Role: Head Engineering & SMP QA/QC Manager

Duties & Responsibilities:

• Control all engineering drawings and review technical queries before sending to client for approval.

• Implement and maintain project Quality Assurance Plans and Procedures

• Review and comment on quality plans of contractors and sub-contractors ITP's.

• Conduct audit and surveillances to ensure procedures are followed and updated

• Attendance of contractor and sub-contractor audits.

• Tracking all punch listing progress and welding traceability, scheduling NDT onsite.

• Meeting with client for weekly progress report bases.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report from subcontractor and client.

• Revised all ITP’s return from the client with comments/reviewed and resubmit to client for review & approval.

• Prepare all FIC’s, ITR & ITP for sign off, surveillance report daily & site inspection and update the percentages progress.

• Check all welding procedures specification for client approval.

• Coordinate to engineering for final inspection sign off onsite.

• Walk down & monitor hydro testing and sign off documents.

• Witness water flushing, air blowing, air drying and re-instatement.

• Prepare sign off documents for practical handover to client.

• Compiling MDR documents review all signed document for final handover. Employment History

Date: Jan 2012 – March 2012

Project: Port Hedland Nelson Point / Funicane Pilbara Monadelphous Engineering Associate Pty. Ltd. W.A Role: QA/QC Inspection Engineer

Duties & Responsibilities:

• Prepare welding test coupons for welder onsite qualification and examined test coupon to complied AS2980/AS1554

• Revise all ITP’s return from client with comments and resubmit to client for review and approval.

• Ensure correct implementation of QA/QC systems and procedures.

• QA/QC documentation preparation and coordination.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report & Correction Action Request.

• Review & revised all ITP’s return from the client with comments and resubmit to client for review & approval.

• Check & review all FIC’s ITR’s, check sheet for sign off surveillance report daily & site inspection.

• Inspect and witness all welding activities onsite.

• Review all painting report and site surveillance.

• Coordinate to engineering department during final inspection FIC ITR’s and ITP sign off onsite.

• MDR compilation as per client requirements.

Employment History

Date: June 2010 – Dec 2011

Project: Cape Preston Sino Iron Mining Project Pilbara Monadelphous Engineering Associate Pty. Ltd. WA Role: Senior QA/QC Inspector/ Coordinator

Duties & Responsibilities:

• Prepare welding procedures and welding test coupons for welder onsite qualification and examined test coupon to complied AS2980/AS1554

• Revise all ITP’s return from client with comments and resubmit to client for review and approval.

• Ensure correct implementation of QA/QC systems and procedures.

• QA/QC documentation preparation and coordination.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report & Correction Action Request.

• Review & revised all ITP’s return from the client with comments and resubmit to client for review & approval.

• Write up all the ITP’s before the construction begins onsite.

• Prepare Matrix for sign off ITP/FIC’s, surveillance report daily, site inspection and monitoring the percentages.

• Check all work packs sign off for completion handover.

• Supervise welding supervisor onsite and witness welding preparation before welding and witness after welding.

• Review all painting report and site surveillance

• Prepare all the MDR and compiling documents for final handover. Employment History

Date: Nov 2007 – Nov 2009

Project: (Boddington Gold Mine Project) Monadelphous Engineering Associate Pty. Ltd. WA Australia Role: Lead QA/QC Inspection

Duties & Responsibilities:

• Write up ITP’s before construction kick off and submit to client for review Approval.

• Ensure correct implementation of QA/QC systems and procedures.

• QA/QC documentation preparation and coordination.

• Resolve all issue NCR’s, Surveillance report, Field Discrepancy Report & Correction Action Request.

• Prepare surveillance report daily & dialog to construction.

• Review all work packs ready for sign off and completion handover.

• Supervise welding supervisors and welding inspectors.

• Mark-up all test packages, drawings for client approval.

• Punch list walk down with client and design modification issue.

• Joins Inspection with client for punch list signed off.

• Compiled MDR for final handover.

Employment History

Date: July 2007 - Sept 2007

Project: LNG Saipem Guangdong Contractor SNC- Guangdong China Role: Lead Commissioning Engineer.

Duties & Responsibilities:

• Prepare markup P&ID drawing and battery limit for pre-commissioning and commission plan execution.

• Conduct tool box meeting to all engineers, supervisor and technicians.

• Prepare all check lists for all pre-commissioning and commissioning activities.

• Carry out final walk down with the client for every subsystem signed off.

• Ensure that health and safety standard are maintain according to site standard and client requirement.

• Cool down interconnecting pipe and LNG tank cool down.

• Carry out functional test LNG sump pump for correct rotation.

• Compiled all sign off FIC’s for handover to client. Employment History

Date: March 2007 - June 2007

Project: Petroleum Development Oman (PDO) Sultanate of Oman Role: Lead Mechanical Commissioning (Client Representative) Duties & Responsibilities:

• Representative of client Petroleum Development Oman Kauther Gas Plant.

• Overall acceptance of all mechanical commissioning /static equipment, piping and rotating equipment.

• Coordinate to the construction engineering to plan schedule activities.

• Carry out final walk down with the contractors for every system punch list sign off.

• Ensure that health and safety standard are maintain according to site standard.

• Monitor all checklist completion to ensure sign off are completed.

• Preparation for commissioning and ready for start-up commissioning activities.

• Review markup P&ID drawing and battery limit for pre-commissioning and commission plan execution.

• Conducts tool box meeting to all engineers, supervisor and technicians.

• Review all check lists for all pre-commissioning and commissioning activities.

• Walk down with the Main Contractor for every subsystem signed off.

• Review that health and safety standard are maintain according to site standard and client requirement.

• Review and signing off and all handover from the main constructor. Employment History

Date: June 2006 - Feb 2007

Project: (KENTZ) Saudi Petrochemical Project Jubail, KSA- Saudi Arabia Role: Head Commissioning & Completion team (PMC)

Duties & Responsibilities:

• Coordinating to all incoming materials from outside the kingdom Saudi Arabia.

• Plan all schedule for completion activities.

• Coordinate to commissioning teams and discussed all markup P&ID drawing and highlighted battery limit for pre-commissioning and commission plan execution.

• Follow up all progress of ITR’S, FIC’S and ITP.

• Monitor all checklist completion to make sure sign off are complete.

• Carry out punch listing and completion check sheet of the system.

• Preparation of handover certificate to commissioning (Final Handover) Employment History

Date: Jan 2005 - Jan 2006

Project: (BSF) Becthel Sinofic Foster Wheeler ( Shell,CNOOC) – Nanhai Petrochemical Proj. Guangdong China Role: Commissioning Engineer (PMC)

Duties & Responsibilities:

• Responsible for preparing system commissioning manuals, manpower planning, system definitions commissioning procedures and commissioning check sheet.

• Supervision and close coordination to contractors, field engineer/supervisors to carry out Pre- commissioning and field commissioning activities.

• Walk down with the contractor for witnessing point to ensure the system turnover is conducted in consistent manner of all check lists.

• Prepare and markup P&ID drawing and highlighted battery limit for pre-commissioning and commission plan execution.

• Follow up to the sub constructor all progress of ITR’S, FIC’S and ITP.

• Monitor all checklist completion to insure sign off are complete.

• Carry out punch listing and completion check sheet of the system.

• Ensure that health and safety standard are maintain according to SHELL & CNOOC standards.

• Prepare documents for handover to start operation. Employment History

Date: Oct 2003 – July 2004

Project: CLOUGH Niugini Napa Napa PNG Oil Refinery- PNG Role: Hydro test/Pre-commissioning Supervisor

Duties & Responsibilities:

• Review Hydro test packages and verify all mark-up drawings P&ID, Isometric to confirmed all battery test limit.

• Prepare hydro test warning sign and barricade in the area.

• Conduct join pre-walk down punch listing identifying equipment to be removed and temporary support to be secured during hydro testing.

• Pre-start meeting (Tool box talk) to the supervisors, foreman and workers under my line supervision.

• Plan daily works and coordinate to every dept. for hydro testing and pre-commissioning activities.

• Coordinate to the QA / QC the lines system to be hydro testing.

• Sign off all documents after hydro testing and handover to QA/QC department.

• Report daily to the head of Hydro and commissioning Department. Employment History

Date: Jan 2003 – March 2003

Project: GLOBAL Offshore Int’l Ltd. (Malaysia Shipyard)-West Malaysia Role: Senior Mechanical Inspector

Duties & Responsibilities:

• Verify every work packs P&ID, Isometric and GA drawings for final inspections.

• Final check all loose ship materials going for Chad Africa.

• Check all lifting cables, Jacket and top platform for lifting positioning.

• Coordinate to all sub-contractors during construction activities.

• Witness final leak test all pipe and valves.

• Signed off all check lists, ITR’s, ITP after inspection and verification.

• Report Direct to Global International Representative USA for final comments. Employment History

Date: Sept 2002 - Nov 2002

Project: Benchamas Chevron Oil & Gas Company Offshore- Thailand Role: General Supervisor

Duties & Responsibilities:

• In charge to all activities in nightshift crews; Scaffolding, Rigging, Pipe Fitters, Welders all structural & piping.

• Plan schedule for nightshift activities, conduct toolbox talks before start the jobs.

• Verify every work packs P&ID, Isometrics and GA for installation.

• Check and inspect all Structural and Piping fabrication as per drawing specification.

• Report direct to Superintendent for job accomplishment day today activities for every department.

• Pre-start meeting (Tool box talk) to the supervisors, foreman and workers under my line supervision.

• Plan daily works and coordinate to every dept. for night activities.

• Sign off all installation documents and submit to construction engineering department.

• Report daily work to construction superintendent. Employment History

Date: April 2002 - Aug 2002

Project: Vietnam Soviet Petroleum Company- South Vietnam Role: Mechanical/Piping and Head Pre-commissioning Engineer Duties & Responsibilities:

• Responsible for preparing system pre-commissioning manuals, manpower planning, procedure and pre- commissioning check sheet.

• Plan schedule for flushing, blowing, hydro testing and pre/post punch listing.

• Prepare and markup P&ID drawing and highlighted battery limit for pre-commissioning plan execution.

• Verify every test packages P&ID and Isometric as build drawing procedures for pre-com activities.

• Check and inspect all Structural and Piping fabrication as per drawing specification.

• Prepare and follow up all progress of ITR’S, FIC’S and ITP.

• Coordinate to every department during execution of pre-commissioning activities and inform every worker in area.

• Compile test data and results with all other document into final documentation.

• Responsible for the supervision and close coordination to contractors, field engineer/supervisors during pre- commissioning activities.

• Walk down with the contractor for witnessing point to ensure the system turnover is conducted in consistent manner of all check lists.

• Monitor all checklist completion to make sure sign off are complete.

• Carry out punch listing and completion check sheet of the system.

• Ensure that health and safety standard are maintain according to the standards.

• Prepare documents for handover to commissioning department. Employment History

Date: Dec 1990 - March 2002

Project: Brunei Shell LNG Onshore & Offshore- Brunei Darussalam Role: Maintenance Supervisor equipment (offshore)

Duties & Responsibilities:

• Ensure to follow all maintenance plan schedule to avoid equipment breakdown.

• Initially seconded to BLNG, and working on the maintenance and execute trouble shooting to different types of equipment.

• Perform preventive maintenance to entire plant such as; pumps, air compressors, gearbox, fin fans, steam turbine etc.

• Overhaul and fabricate spare parts for steam turbine, gas compressors, pumps etc. Supervise in all machining work in the machine shop.

• Report direct to engineering department for job accomplishment day today activities for every department.

• Prepare Job Hazard Analyses and participate (Tool box talk) conduct by site engineer.

• Plan daily works and coordinate to plant operation and apply work permit for daily activities.

• Sign off all installation documents and submit to maintenance engineering department. Employment History

Date: Jan 1990 – Nov 1990

Project: MGE ASAHI East General Enterprises-Mubarras Island offshore Abu Dhabi U.A.E Role: Commissioning Mechanical/Piping foreman (offshore) Duties & Responsibilities:

• Get the permit and supervised the preventive maintenance of MGE-Asahi clients plant stationary.

• Ensure that all spare parts and materials are available during, and prepare reports for the work done.

• Servicing and repair different types of rotating/stationary equipment.

• Perform overhauling of all rotating equipment such as; pumps, air compressors, gearbox, fin fans, steam turbine etc.

• Report direct to supervisor for job accomplishment day today activities for every department.

• Assisting the commissioning team after the completion of the overhauled the equipment.

• Plan daily works and coordinate to plant operation and apply work permit for daily activities.

• Sign off all documents report and submit to immediate supervisor. Employment History

Date: Oct1985 - Nov1989

Project: Al-Yusr Townsend & Bottom (Saudi Arabia Petrochemical) Jubail, KSA Role: Millwright/Piping foreman

Duties & Responsibilities:

• Plan daily works and coordinate to plant operation and apply work permit for daily activities.

• Performed maintenance work of all processing equipment rotary & stationary equipment in the plant

• Overhauling, servicing and repair different types of rotating equipment such as; centrifugal and reciprocating pumps, steam turbines, compressors, cooling fin fans, gear box, valves etc.

• Ensure that all spare parts and materials are available, during plant schedule shutdown.

• Perform alignment to all rotating equipment.

• Report direct to supervisor for job accomplishment day today activities for every work completed.

• Sign off all documents report and submit to immediate supervisor. Employment History

Date: Sept1984 - Sept1985

Project: Arms Corporation of the Philippines, Parang, Marikina Metro Manila Philippines Role: Millwright/Machinist

Duties & Responsibilities:

• Operate different types of machineries lathe machines, milling machine, radial drill, surface, shaper machine, band saw and cylindrical grinder.

• Fabricate different types of spare parts machine gears, machine spindle screws, guns firing pins, etc.

• Overhauling, servicing and repair different types of machineries such as; lathe machines, milling machines and all plant equipment.

• Ensure that all fabricated equipment parts are correct tolerances.

• Perform setting up & alignment work piece on machinery going to operate as per require drawings and tolerances.

• Report direct to QA/QC for job completed for final inspection of all part tolerances and dimension.

• Sign off all documents report and submit to machine shop leading team.