Post Job Free

Resume

Sign in

Engineer Project

Location:
Canada
Posted:
February 22, 2017

Contact this candidate

Resume:

DATA MONEHIN (P.ENG)

Calgary, Alberta

403-***-**** • acyyhs@r.postjobfree.com

OPERATIONS ENGINEER

Highly skilled engineer with project co-ordination / management experience, a proven record of reducing costs, enhancing efficiency and increasing well production for operations. Experienced in providing technical, design, surveillance, troubleshooting and debottlenecking services to onshore, offshore production and gas gathering facilities. Well-versed in ensuring contractor compliance with company procedures as well as health and safety regulations. Adept at communicating and working effectively with operations superintendents, wellsite foremen and other field personnel, as well as internal and external stakeholders. Demonstrated ability to work in a fast-paced team environment, both onsite and in office settings. Proficient in all Microsoft applications, AFE naviagtor.

Project Management / Co-ordination ● Conflict Resolution ● Customer Service ● Team Leadership and Motivation

Production Optimization ● New wells Tie-In Coordination ● PVR Maintenance ● Regulatory Compliance

Well Analysis and Performance Evaluation ● Well Gathering and Facility Optimization ● Logistics

Process Improvement ● Budget Management ● Construction Management ● Cost Reduction

Plant and System Surveillance ● Troubleshooting ● De-bottlnecking ● Problem Solving

Contractor Negotiation and Supervision ● Written and Oral Communication

PROFESSIONAL EXPERIENCE

Genesis Technical Consulting, Airdrie - 2017

Genesis Technical Consulting Inc. (GTC) Engineering firm providing services in Alberta area.

Project Coordinator / Engineer:

Project coordinator/engineer, providing project management and operations expertise to Clients projects.

Achievement:

Participating in cold eyes review of projects and reviewing project deliverables (scope of work, DBM, cost estimate etc.) to ensure adequacy prior to gate reviews.

Developing proposals to Clients on project management process evaluation

SemCAMS, Calgary, Alberta • 2012-2016

One of the largest licensed sour gas processors in Alberta, Canada. Based in Calgary, Alberta.

Project Coordinator (PC)

Managed and co-ordinated new tie-in projects, upstream gas gathering system operations projects & all field related projects – brown and green field. Directed EPCM companies to successfully execute projects (greenfield & brownfield) in various stages of progression leveraging Company’s project management system from concept to execution phase.

Selected Highlights:

Managed and coordinated multiple projects ranging from $500K to about $10 million without safety incidents. Conducted multiple presentations on safety and environments to drive safe bahavious.

Provided technical & engineering support to Business Development Group and also during the concept phase and feasibility study to aid cost effective option selection exercise.

Provided technical and project co-ordination support to other projects as requested (including growth projects, base projects (no AFE), maintenance repairs projects. Provide facilities project support including developing project scope of work for Business development

DATA MONEHIN • Page 2 • acyyhs@r.postjobfree.com

Conducted multiple design reviews for multiple tie-in projects which helped improved quality of project delivered to customer their increasing customer satisfaction.

Obtained cost savings by applying best practices such as standadizing tie-in processes and materials, effective construction management reviews, executing projects based on gate based processes

Prepared project plans and managed execution to ensure schedule, cost and quality are met

Succesffully ensured disciplined execution through milestone identification, followign up and escaliting issues appropriately

Developed effective stakeholders communication plan which provided visibility within company to stakeholders. Communication plan included project team meetings, stakeholder calls, and regular updates to communicate status of projects to key stakeholders and leadership team

Developed with the project team projects risks and effectievly communicated and mitigated such risks

Ensured completion of project documentation including project plans, engineering documentation etc

Supervised Engineering consultant and managed vendors as required to ensure successful projects

Worked with other functions of the company to provide projects information required for book keeping and reporting such as projects accurals on a monthly basis, forecasted spend etc

SUMMIT OSMOSIS SYSTEMS, INC., Mississauga, Ontario • 2008-2012

Supplier of water purification equipment to homes and businesses.

Quality Assurance Specialist: Conducted quality assurance compliance audits of products and processes. Collaborated in redesigning products to improve quality and safety. Tracked key performance indicators (KPIs) and implemented procedures to improve employee performance, customer satisfaction and inventory control. Trained and mentored employees. Developed and delivered targeted sales presentations to prospective customers.

Selected Highlights:

Initiated procedures that improved communication and collaboration among cross-functional work groups.

Created a data entry tracking system to monitor invoices and payments.

Developed and implemented process-improvement seminars that enhanced efficiency in order fulfillment.

Devised new advertising strategies that broadened customer base and increased clientele.

Evaluated different projects at various stages of completion to ensure consistent application of quality standards

BROFLIFTER, INC., Lagos, Nigeria • 2005-2007

Civil engineering firm with clients in the residential and commercial construction sectors.

Project Engineer: Oversaw the design and construction of a 10,000-square-foot, 2-storey house from start to finish. Created the scope of work and prepared the initial bid. Collaborated with architect to develop design specifications. Procured all necessary building permits. Worked with the job site engineer to execute the project. Sourced, hired and managed construction workers. Ordered and ensured the timely delivery of all building materials.

Selected Highlight:

Overcame the challenge of supplying manpower to the remote location by increasing worker pay to cover travel costs, while still completing the project within budget and on time.

Delivered project within time frame by engaging client in a timely manner and obtaining approvals for various deviations from original designs due to local material availability issues

DATA MONEHIN • Page 3 • acyyhs@r.postjobfree.com

MOBIL PRODUCING NIGERIA, Lagos, Nigeria • 1997-2005

One of 3 Nigeria-based subsidiaries of ExxonMobil Corporation.

Project & Facilities Engineer (2002-2005): Provided multi-faceted technical engineering support for the Eket onshore oil and gas processing facility. Oversaw plant surveillance. Troubleshot and resolved bottlenecks. Reviewed and implemented processes to integrate new projects with those of existing facilities. Coordinated pilot tests of crude-oil treating chemicals, and selected those for use in full-scale plant tests.

Selected Highlights:

Managed the $5M revamping of a 500K-barrel floating roof storage tank, completing the project on time and within budget with no lost-time incidents.

Conducted FEED-phase technical research and analysis that contributed to a multi-million-dollar onshore plant expansion.

Contributed to the success of a project that dramatically reduced operating costs and improved efficiency by more than 100%.

Collaborated in the development of new operational processes and KPIs that reduced crude oil tanker demurrage costs by $5M per year.

Reviewed procedures and participated in the commissioning and startup of crude storage tanks in a US $100M, 500KB revamp program.

Well Completion and Operations Engineer (2000-2002): Supplied engineering support, trending all reservoir parameters, for the 45K bpd Oso condensate and natural gas production platform. Monitored and analyzed daily production and well bore status, and made recommendations to improve performance. Coordinated rigless workover operations conducted by Schlumberger to perforate new production zones in non-flowing wells. Performed design, surveillance, troubleshooting services involving equipment, systems and startup of numerous onshore and offshore facilities. Managed the development, implementation and maintenance of process methods for production of deliverables to minimize costs and maximize efficiency. Worked with management to formulate strategic plans and goals. Established budgets; monitored and maintained cost controls. Managed and aligned manpower and budget resources for each project.

Selected Highlights:

Collaborated with Schlumberger engineers to develop a completions plan that allowed well starts within 1 month of offshore installation, compared with the previous IOC that took more than 6 months from installation to startup.

Identified low-production wells and increased production volume by more than 10K bpd each.

Improved wellhead run time from 90% to 100% by resolving shutdowns caused by malfunctioning instrument gas systems.

MOBIL PRODUCING NIGERIA (continued)

Facilities and Project Engineer (1997-2000): Participated in the general upgrade of the Qua Iboe crude oil processing and storage facility. Monitored crude oil parameters to observe changes in its composition as well as the effect of pressure and temperature variations. Troubleshot and debottlenecked problems in processing facilities. Oversaw pipeline clearing from pig launching through receiving. Worked with the loss prevention unit to ensure contractor compliance with all company policies and procedures. Conducted daily surveillance of all critical systems to ensure proper functioning. Planned and directed logistics to ensure that all heavy equipment for the project was supplied to the contractor and used in compliance with all safety and environmental regulations. Continuously reviewed and updated all engineering process-design documents in conjunction with the Senior Engineer. Oversaw and coordinated onsite work.

Selected Highlights:

Prepared the scope of work for project execution that resulted in a seamless handover to the terminal operator. Managed logistics of heavy equipment and personnel without safety incidents

DATA MONEHIN • Page 4 • acyyhs@r.postjobfree.com

FORMAL EDUCATION

Bachelor of Science in Petroleum Engineering

University of Port Harcourt, Choba, Rivers State, Nigeria

PROFESSIONAL DEVELOPMENT

Certificate in Software Testing Verification and Validation

CSA Z662 Oil and Gas Pipeline system code

Design for gas gathering lines

PHA/HAZOP Facilitation

Certificate of Professional Leadership

John Maxwell: Maximum Impact Leadership

PROFESSIONAL AFFILIATIONS

Professional Engineer (P.Eng.)

Association of Professional Engineers and Geoscientist of Alberta (APEGA)



Contact this candidate