Shyamal Patel
*** ****** *** *****: 551-***-****
Jersey City, NJ ********@*******.***
***** *****://www.linkedin.com/in/shyamal-patel
EDUCATION
Masters in Construction Engineering and Management, GPA: 3.77
Stevens Institute of Technology, Hoboken, NJ, USA 2017
Courses – Construction Management-1 & 2, Project Management for Construction, Construction Safety Management, Scheduling and Planning, Computer Applications in the Construction Process, Practicum in Construction Management, Sustainable Design, Strategic Responses to Cyclical Environments, Temporary Structures in Construction Management, Construction Engineering-2
PROFESSIONAL EXPERIENCE:
Shanta Developers, Tampa, FL- Breezy Meadows
Assistant Project Developer, April 2016 –August 2016
Study the Request for Information (RFI), Submittals and Transmittal's so as to make the necessary changes required.
Budgeting: Observe the project finances and the carry out the changes as per the project budget and client needs.
Manage the change order and control the work process so as to assist the manager with making updates and scheduling further activities on site
Client’s interaction: Communicating with the client regularly to make the necessary changes in the plan and to satisfy the client’s requirements.
Work Flow Management: Manage the flow of information among the manager and the team though meetings.
Work on the Punch List with Project Manager in order to keep track of materials and cost estimates.
Estimation: Prepare work to be estimated by gathering proposals, blueprints, specifications, and related documents
Safety and risk measurement: Responsible for the safety of the employees
Analysis: Analyze the drawings and assist manager with making updates and scheduling further activities on site
Site Inspection and Safety: Perform Site inspection to maintain company's Safety and Quality Standards and the City of Largo standards.
Pawan Infra homes Pvt. Ltd, Gujarat, India
Assistant Project Manager, June 2013 –July 2015
Assist Project Manager in estimating of the materials and cost to be provided to the contractor.
Direct construction operations at the project site, supervise all the civil works on site and report it to the manager.
Scheduling the daily site work to be completed.
Carry out inspections of rebar’s of slab before pouring of RCC and supervise RCC work for slab filling
Estimate the cost of labors, materials and equipment to determine the project feasibility.
Perform site inspections in order to maintain the safety of the employees entering Manholes, Confined Space, and operator
ACADEMIC EXPERIENCE:
Plan Development: Worked on scheduling and estimating the timeline of the project in Primavera P6, applying the change order in the project of Paint Locker.
Woody 2000: Scheduled the project by using Work Break Down Structure (WBS) in Excel and MS Project
Budgeting: Prepared project cost summary and project close-out report
Project Analysis: Performed project analysis on various timeframe allotted for a project and verified the status of the completed project.
Project Implementation: Implemented 3D modeling project plan for an office which includes wall designing, MEP designing and outlook of an office using Revit Architecture 2016 and Navisworks Manage 2016.
Cost cutting: Improving the strength of concrete by adding palm tree natural fiber and gradually saving the cost
Leadership: Trained 10 freshly graduate on constructional workflow and worked with little or no supervision of Project Manager and deliver the project on time.
SKILLS:
Applications: Microsoft Project, Primavera P6, AutoCAD Microsoft Word, Microsoft Excel, Microsoft PowerPoint
Modeling Tools: Revit Architecture 2016, Navisworks Manage 2016
Operating System: Windows, Mac
CERTIFICATIONS:
OSHA 10-hour, Construction Manager-in-Training (CMIT)
ACTIVITIES:
Attended ‘Construction Supervisor’ and ‘Concrete Mix Design’ workshop at Ambuja Knowledge Center, ‘Total-Station Surveying’ Workshop