Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Harvey, IL
Posted:
February 19, 2017

Contact this candidate

Resume:

OLAJIDE TAIWO

+1-773-***-****

acywjy@r.postjobfree.com

PROFESSIONAL SUMMARY AND TECHNICAL SKILLS

Possess years of vast electrical engineering experience in the oil and gas industrial settings.

Strong numerical and analytical ability.

Well versed in BP Site HSSE standards.

Highly knowledgeable and well versed in codes and standards of BP Site Technical Practices.

Provision of electrical discipline support for both greenfield and brownfield projects.

Review and approval of project drawings, standards and specifications.

Possess the ability to work with multi-discipline team to identify reliability improvement opportunities.

Good team player with capacity to work effectively with people of diverse personalities and cultures.

Possess high advanced computer knowledge in AutoCAD and Microsoft Office suites (Excel, Word, Outlook, PowerPoint).

Possess high advanced research skills (Internet, technical journals, code books, etc).

Electrical power system analysis and ability to use SKM power tools for short circuit and voltage drop calculations.

Possess working knowledge of industry codes (NFPA 70 NEC, NFPA 70E, API RP 500, and other various NFPA and IEEE codes and standards).

Extensive skills in verbal and written communication, ability to work independently and within a team.

Ability to direct critical activities requiring sound electrical knowledge and expertise.

Possess high adaptability.

Possess extensive engineering experience in Front End Engineering Design, (FEED) office procedures.

Ability to act decisively and possess problem solving skills.

Ability to develop electrical scope of work and estimates - cost, time and resources, (CTR).

Planning, coordination and extensive participation in peer design reviews (HAZOP, SAFOP)

CAREER EXPERIENCE

BP Whiting Refinery, Whiting, Indiana, USA.

I worked on the following (as a contractor to BP through Jacobs Engineering Group) projects as Electrical Engineer/Field Engineer from 2/2014 - 12/2015.

(a) Flare Gas Recovery, FGR Project

(b) Power Distribution Center, PDC 31 Project

(c) Fluid Catalytic Unit, FCU 500 Project

(d) Dissolved Nitrogen Flotation, DNF Project /API Project

Manage, support and upgrade of the existing electrical systems and also support the design, installation and startup of new systems.

Carry out feasibility studies and investigate best possible routing for cables and cable trays installation.

Investigate electrical power sources for electrical equipment such as motors, switchboards, panels etc.

Take ownership of electrical technical queries to ensure resolution to the satisfaction of the operation engineers/project managers.

Leverage and collaborate with other disciplines in the execution of each of the projects.

Consult with I&E and unit personnel to resolve problems and proffer appropriate solutions.

Work with field/construction engineers to carry out on-site assistance for both the design and construction teams.

Assist electrical designers and engineers in up-dating as-built drawings.

Coordination with and provide engineering support to the construction team.

Generate electrical deliverables such as single line diagrams, electrical load lists, layouts, equipment sizing, specifications, data sheets, etc.

CH2M HILL - Anchorage, Alaska, USA.

Conoco Philips Alaska Incorporated, (CPAI) Standby Generators Installation Project - Electrical Engineer. 9/2012 - 9/2013.

Prepared and reviewed single line diagrams, electrical specifications, data sheets and basis of design (BoD) document.

Prepared the load estimates, performed electrical load studies, and calculations for the sizing of the standby generators.

Participated actively in the review of project schedule and resource allocation.

Conoco Philips Alaska Incorporated, (CPAI) Drill Site Well Tie-in Laterals Project - Electrical Engineer. 9/2012 - 9/2013.

Carried out peer design reviews on the electrical scope of work, the project drawings and material requisitions.

BP MPU Sand Slurry Tank Replacement Project - Electrical Engineer. 4/2013 - 9/2013.

Carried out peer design reviews on the electrical scope of work, the project drawings and material requisitions.

ENI Temporary Load Banks Project - Electrical Engineer. 5/2013 - 7/2013.

Prepared the electrical scope of work and the estimate, construction scope of work and reviewed single line diagrams, ground plan drawings, switchgear single line, MCC single lines area classification drawings.

ENI Permanent Load Bank Project - Electrical Engineer. 5/2013 - 7/2013.

Prepared the electrical scope of work and the estimates for submission to the client.

Shell Nigeria Exploration and Production Company, (SNEPCO) - Lagos, Nigeria

Bonga North Project - Senior Electrical Engineer. 2/2010 - 3/2012.

Reviewed and modified the key single line diagram and the others single line diagrams showing details of tie-in to the existing 27MVA deep offshore power generation for the 225kbopd Bonga FPSO.

Performed the calculation for cable sizing, fault level, voltage drop for the HV generator incomers, the HV transformer feeders and motor feeders.

Reviewed and modified the existing electrical load schedule detailing both the HV and LV motor loads.

Reviewed the existing area classification drawings to show areas impacted by the addition of all Bonga North project loads.

Reviewed existing power generation capacity and confirmed adequacy of existing power generation to meet Bonga North project loads.

Prepared switchroom layout drawings detailing both the grounding system and electrical equipment location.

Reviewed electrical specifications and datasheets and participated actively in HAZOP/SAFOP studies and constructability review workshops.

Shell Petroleum Development Company, (SPDC) FEED Office - Port Harcourt, Nigeria

Assa North - Ohaji South Project - Senior Electrical Engineer. 3/2006 - 7/2008.

Prepared and had a timely delivery of all the electrical deliverables such as, key single line diagrams, electrical load schedule, equipment layout detailing the grounding system, Field Auxiliary Rooms, (FAR) layout, major cable sizing calculation and report.

Carried out electrical short circuit calculations for the sizing of generators, transformers and main switchgears.

Prepared the electrical power generation and distribution philosophy.

H-Block Project - Electrical Engineer. 3/2006 - 7/2006.

Prepared and had a timely delivery of both the key single line and other single line diagrams for the 36MVA shallow offshore based power generation.

Performed the calculation of fault level, voltage drop cable sizing equipment sizing.

Prepared switchroom layout detailing both the grounding system and equipment position.

Reviewed electrical specifications and datasheets and participated actively in HAZOP/SAFOP studies and constructability review workshops.

FAO Philips & Associates

MTN Switch Center Project, Owerri, Nigeria – Senior Electrical Engineer. 11/2004 - 10/2005

Designed cable trench and selected the cable routes for the whole site.

Performed electrical calculations for the sizing of the 500KVA generators, transformers and main switchgears.

Prepared the grounding layouts and supervised the installation of the grounding system.

CA Consultants Ltd

MTN Network Group Office, Victoria Island, Lagos, Nigeria - Senior Electrical Engineer. 4/2003 - 3/2004.

Prepared both the key single line and other single line diagrams for the 500KVA power generation and distribution.

Prepared the grounding drawings detailing all the grounding connections from the roof level down to the ground floor.

Carried out complete renovation/upgrade of the electrical lighting and power distribution of the five -story office complex.

Performed site supervision and attended site technical meetings.

Interplan Engineers

Central bank of Nigeria New Head Office Building Project, Abuja, Nigeria - Electrical Engineer. 6/2000 - 3/2003.

Specified and selected the three number 630Amps rated ring-main units, (RMUs) in order to provide interconnection between the four towers, the car park and auditorium buildings thereby ensuring flexibility of power transfer between the different buildings.

EDUCATION & PROFESSIONAL CERTIFICATION

Bachelor of Science Degree, Electronic/Electrical Engineering, Obafemi Awolowo University

Fundamentals of Engineering/Engineer-In Training, (FE/EIT), Anchorage, Alaska, 2013

Member of the Institute of Electrical and Electronics Engineers, (IEEE), No. 92894683

Certified Member of the Council for the Regulation of Engineering in Nigeria, (COREN), 2011

Certified Member of the Nigeria Society of Engineers, (NSE), 2002



Contact this candidate