Post Job Free
Sign in

Construction Project Management

Location:
Almaty, Almaty Province, Kazakhstan
Posted:
February 19, 2017

Contact this candidate

Resume:

SAMAT M.

TASSUBAYEV

E: *********@****.**

M: +770********

Almaty, Kazakhstan

kz.linkedin.com/in/samat-tassubayev

CONSTRUCTION & PROJECT MANAGEMENT SPECIALIST

Supervising and implementing construction projects, maintenance, project completion on schedule within budget, monitoring construction schedule, cost control, HSE, work permits, QC&QA. Core competences include:

Progress Reporting Project Management Planning and Tracking Designing Forecasting

Cost Control QC aspects Warehouse procedures Material Specifications Engineering

Construction Maintenance Architecture Electricity Translating

PROFESSIONAL EXPERIENCE

TENGYZSTROYSERVICE GROUP LLP Tengyz oil field, Kazakhstan December 2016 – January 2017

TengyzChevroil Future Growth Project – Warehouse Construction

Planning Engineer

Prepared work breakdown structures, activities and logic

Forecasted manpower

Estimated material and equipment

Worked on daily and weekly progress reports and histograms

Implemented planned and earned values analysis

Managed cost control

Monitored construction projects on site

GATE INSHAAT LLP Tengyz oil field, Kazakhstan May 2015 - July 2016

TengyzChevroil Future Growth Project

FGP Management Offices, Medical Point, Ambulance Shelter and Warehouse Construction Projects

Construction Site Supervisor – Maintenance Manager

HSE aspects: TCO procedures on HSE, trainings, work permits, certificates and IIF

Poured concrete (formworks, insulation, elevations, rebar bending, leveling, curing, estimating)

Assembled steel and panel structures

Performed excavation work (septic tank and sewage pipeline installations, cables)

Supervised on electrical and automation projects (generator and diesel boiler installation and maintenance, electrical construction, load calculation, testing and inspection)

Installed and maintained AC and Samsung firefighting systems

Performed interior work

Translated kick off, progress meetings and project documentation for Management into Russian and Kazakh languages

Prepared different contractor reports (manpower, material, equipment)

Prepared method statements

Planned and tracked projects, progress reports and analysis, diagrams, and histograms

Designed 2D and 3D drawings in AutoCAD

Supervised and controlled warehouses (inventory, receipt procedures and registration, accounting, providing, material specifications)

Tracked QC issues, checklists, NFIs, testing, inspection, ITP, and TCO specification

Maintained offices (architecture, electricity, sewage and heating system)

TENGIZCHEVROIL LLP via Kis/Orion Tengyz Oil field, Kazakhstan September 2014 - February 2015

Second Generation Enhancement Project of SGP

Interpreter

Translated and interpreted construction projects on E&I, HSE, production, civil construction and commissioning procedures

Interpreted kick off and progress meetings held conjointly with Contractors and prepared presentations

NEFTESTROYSERVICE LLP Tengyz Oil field, Kazakhstan September 2014 - February 2015

Tengyzchevroil Projects, Batch Plant Construction, Water Treatment Facility, Railway Construction

Assistant – Translator to Lead Superintendent

Performed translation of different kinds of construction, HSE projects and documentation

Reviewed contracts for essential information on construction projects clarifications

Assisted with department management, transportation issues, and coordinated waste services

Participated with cost issues, price proposal preparation, planning work, and progress reports.

TENGIZCHEVROIL LLP Tengyz Oil field, Kazakhstan July - August 2012

SGI/SGP Turnaround 2012

Interpreter

Translated construction, QA&QC, HSE, RA and IR documentation

Interpreted mechanical, electrical and civil construction procedures on site

Translated meetings and presentations

‘Jing Tian’ Group Almaty, Kazakhstan December 2011 - June 2012

Representative in Kazakhstan

Imported Chinese fruits and vegetables to Kazakhstan (trade and negotiation)

Participated in customer clearance, warehouse procedures, and price proposals

Conducted cash flow, trial balance, material and resources planning, and transportation

“NUR OTAN” Democratic People’s Party Almaty, Kazakhstan September 2010 - December 2012

Deputy Chairman of Party Control Commission

Controlled governmental construction orders, procedures and projects

Revised potable water pipeline installation construction projects for residential compounds

Tracked electrical projects for residential compounds

Hydro-technical melioration projects for rivers

Gas pipeline and branch pipeline installation projects

School and preschool education building construction projects

EDUCATION

Taraz State University named after Kh. Dulati Taraz, Kazakhstan

Construction materials and steel structure manufacture production 2017

Al-Farabi Kazakh National University Almaty, Kazakhstan

International Relations 2008

PC SOFTWARE SKILLS

Proficient in Microsoft Office, Oracle Primavera P6 Project Management, AutoCAD 2017

LANGUAGE SKILLS

English – Professional Russian & Kazakh – Native Chinese & Turkish – intermediate

CERTIFICATES

Permit to work & job hazardous analysis, safe excavation practices, working at heights, confined space entry, respiratory protective equipment, isolation of hazardous energy, English proficiency, and political party school



Contact this candidate