Post Job Free
Sign in

Manager Design

Location:
Bellville, TX, 77418
Salary:
120,000
Posted:
February 18, 2017

Contact this candidate

Resume:

Mark Steven Hunter

*** *. **** **. *********, Texas

979-***-****

SUMMARY: Over 38 Years Experience as Piping Designer/ Manager/ Checker over projects that range from large Midstream gas plant design, Compressor Backhaul projects; Offshore Platform Oil & Gas facility design, Petrochemical design. 22 years AutoCAD thru 2016 experience, Proficient in CadWorx Plant 3D modeling and Isogen generation.

Also utilized CadWorx 3D software and Leica Point cloud Lidar Scanning for Solid Modeling.

EXPERIENCE:

June 2015 to October 2016

SKW Enterprise Solutions

Facility Designer

Responsible for design coordination and oversight for Energy Transfer 4 Compressor Sites backhaul conversions in Illinois and Indiana. Utilized CadWorx 3D software and Leica Point cloud Lidar Scanning for Solid Modeling.

November 2014 to June 2015

TEC Engineering, Inc.

Mechanical Designer

Department Lead and Checker for numerous Apache Corp. Gas Production Facilities in the Texas area.

November 2013 to August 2014

Optimized Process Designs, (OPD)

CadWorx Piping Designer, Rebel Gas Plant, 200MMSCFD for Energy Transfer; 3D Modeling and Isogen using CadWorx 2013

November 2011 to November 2013

AZOTA, LTD.

Design Manager for facilities on 200 MCFD Cryogenic Gas Plant for DCP Midstream; Onsite Construction Management

April 2005 to November 2011

NOVA CONSULTING SERVICES

Project Manager, Coordination, Oil & Gas Facilities Refirb and Offshore Construction management,

Complete offshore production faculties refirb; Compressor additions, equipment additions, etc.

Mariner Energy

F-W Oil Exploration

Tarpon Operating & Dev.

Sterling Energy

May 2001 to April 2005

OFFSHORE SPECIALTY FABRICATORS, INC.

Designer of new and existing offshore production platforms

Remington Oil and Gas - Gas facilities for various locations.

Tarpon Oil & Gas - Facilities design of 1500 BOPD, 30mm gas 4-pile platform for Mustang Island 726.

Hunt Petroleum (AEC) - Gas facilities for various locations.

August 1995 to May 2001

PINNACLE ENGINEERING, INC.

Facilities Design Manager

Westport Oil & Gas - Gas facilities for various locations.

Remington Oil & Gas - Gas facilities for various locations.

Norcen Explorer, Inc. – Facilities design of 5000 BOPD, 30mm gas 4-pile platform for E.I. 254 “A”.

Seagull Energy E & P, Inc. – Facilities design of MOPU, 5000 BOPD, 40mm gas facility for Ship Shoal 129.

UMC Petroleum Corporation – Facilities design of 50mm gas w/dehy. Facility, 4-pile platform for West Cameron 524 “A”.

Seneca Resources Corporation – Facilities design of 5000 BOPD, 4-pile platform for Vermilion Block 252 “A”.

March 1993 to August 1995

CBS ENGINEERING, INC.

Sr. Piping Designer

Enserch Exploration – Facilities squad leader of six pile production facility for Garden Banks 388, Gulf of Mexico

Seagull Energy E&P, Inc. – Compressor addition to existing 4-pile platform for Brazos Block 552.

Mesa – CIG/PEPL compressor additions to existing Williams/Satanta compressor station, Grant Co., Kansas.

Shell Western E&P, Inc. – Upgrade of existing three phase separation facilities and water injection system in Midland, Texas.

March 1992 to March 1993

S & B ENGINEERS AND CONSTRUCTORS, LTD.

Sr. Piping Designer

Shell Oil Company Project – Responsible for layout and piping design of wet gas compressor addition to existing Catalyst Cracking unit.

September 1989 to March 1992

OMEGA MARINE, INC.

Sr. Piping Designer

Weeks Exploration Company Project – High pressure piping design of gas and oil separator skids and interconnect piping of main, cellar and sub-cellar decks.

June 1987 to September 1989

JOHN BROWN E & C

Sr. Piping Designer

Mobil Chemical Polyethylene Modernization Project – Design of dry ends compounding building, surge and chemical additive silos.

September 1982 to June 1987

HYUNDAI E & C

Piping Designer

Aramco – Marjan and Zuluf offshore production platform complexes, Dubai, Saudi Arabia – Coordination of production and compressor platform; Liaison for piping coordination for Hyundai Construction and Fluor Offshore Services through construction phase; design utilized high-pressure piping and valving.

October 1981 to September 1982

M.W. KELLOGG COMPANY

Piping Designer

Koch Refining Company Project – Responsible for equipment layout, tower and pump piping design for new gasoline distillate addition.

June 1981 to October 1981

EARL & WRIGHT ENGINEERS

Piping Designer

Chevron Oil Company Project, San Diego, California – Responsible for piping design of offshore gas production and drilling platform. Design involved high-pressure piping and submerged sea routing.

March 1981 to June 1981

TRANSCO GAS PIPELINE COMPANY

Piping Designer

Various offshore gas gathering platforms and onshore gas metering skids; piping included pig launchers/receivers and tie-ins.

January 1980 to March 1981

S & B ENGINEERS, INC.

Piping Designer

AMOCO Refining Projects – On-site piping design and redesign of existing decoking and catalyst cracking areas in preparation for and during turn-around construction.

January 1977 to January 1980

MONARCH SEPARATORS, INC.

Draftsman

Atmospheric plate and vessel and piping design of oil-water separators for petrochemical and offshore installations.



Contact this candidate