Post Job Free
Sign in

Electrical Maintenance

Location:
George, WC, South Africa
Posted:
February 15, 2017

Contact this candidate

Resume:

CURRICULUM

VITAE

****

INTRODUCTION

I am a self-motivated, diligent, hardworking employee that utilises initiative and capitalise on my working hours in order to provide my employer with a well functioned division. I work well on an individual basis as well as in a team environment. My working history consists of a Mining background, Underground Blasting Operations and Electronic Maintenance including Fire detection systems. Thereafter I chose a change of career and focus on Electrical work. I completed an Electrical Certification while in the employ of EMTEC cc and have subsequently gained more than 20 years of experience in the Electrical Field. Due to the nature of the job and prior working history do I find myself conscious of the dangers of the job and therefore focused on Health and Safety. I have working experience in other electrical fields included Oil Rig, Cutter Suction and Hopper Suction Dredgers, and have a working knowledge of SCR systems, Ross Hill controls, Caterpillar Generator Sets, DC motors, Cutler Hammer and Siemens MCC. My current knowledge also includes PLC systems and the reading, understanding and implementation of electrical drawings. Part of my prior working history included the supervision of staff; general operations and ensuring staff conducted and adhered to Health and Safety regulations.

PERSONAL INFORMATION

Surname : GIBBENS

First Names : EDWARD RONALD

Residential Address : 15 SEARLE STREET

BLANCO.

GEORGE.

SOUTH AFRICA

6529

Postal Address : PO BOX 1337,

GEORGE.

WESTERN CAPE.

6530

Cellular Number : +277*-***-**** OR +278*-***-****

Home Number : +274*-***-****

E-mail : ************@*******.***

Date of Birth : 18 DECEMBER 1952

Place of Birth : VEREENIGING

Nationality : SOUTH AFRICAN

Identity No. : 521-***-**** 084

Passport No. : M00040887

Marital Status : MARRIED

No. of Dependents : ONE

Home Language : ENGLISH, AFRIKAANS – FULLY BILINGUAL

Driver’s License : CODE A & EB, OWN TRANSPORT

International Driver’s License : CODE A . B & E

Medical Certificate : FOR THE SOUTH AFRICAN MARINE AND SAFETY AUTHORITY

Seaman’s Record Book No. : 39018

Availability : NEGOTIABLE

Required Salary : NEGOTIABLE

QUALIFICATIONS

Standard 8 – Willem Pretorius High School – 1969

OTHER COURSES COMPLETED

BLASTING CERTIFICATE ( For scheduled Mines): 19 September 1975

CERTIFICATE OF ACHIEVEMENT – ELECTRICAL EVALUATION: January 1991

ATRAMI CERTIFICATE – ELECTRICIAN: 19 May 1993

CERTIFICATE OF COMPETENCE – PRACTICAL ASPECTS OF PROGRAMMABLE LOGIC CONTROLLERS LEVEL 1: 30 August 1994

CERTIFICATE OF COMPETENCE – PRACTICAL ASPECTS OF PROGRAMMABLE LOGIC CONTROLLERS LEVEL 2: 2 September 1994

PROGRESS THROUGH TRAINING IN SIMATIC S5 PROGRAMMABLE LOGIC CONTROLLERS: 21 July 1995

CERTIFICATE FOR THE ISO 9002 AWARENESS COURSE: 31 March 1995

MECHANICAL COURSE AT SAPPI TRAINING CENTRE IN ERNSTRA, SPRICS FROM 18 April 1995 to 2 June 1995 WHICH CONSISTS OF: ALL TYPES OF BEARINGS, SEALS ANDGASKETS. LIGNMENT OF V-BELT PULLEYS AND TENSION OF BELSTS. ALIGNMENT OF VARIOUS TYPES OF GEARBOXES AND PUMPS. OIL HYDRAULICS AND PNEUMATIC SYSTMES AIR AND ELECTGRO OPERATING.

HEALTH AND SAFETY REPRESENTATIVE TRAINING COURSE: 16 October 1997

PRE SEA FAMILIARISATION CERTIFICATE: 13 June 2008

ACHIEVEMENT CERTIFICATES

Nabors Drilling International Limited : Improvement of Rig 779’s Atmosphere & Appearance: 29 April 2006

EAA Excellence in Achievement Award : Bronze Award; 1 December 2007

COMPUTER SKILLS

Windows 95 / 98 / 2000 / 2010 / XP / PRO. Windows Vista / 7

MS Office 2010 : Word / Excel / Power Point / Outlook

Internet

EMPLOYMENT HISTORY

Company : IPS GROUP

Rivium Boulevard 46

2909 LK Capelle aan den IJssel

The Netherlands.

Tel: +31 (0-10-447-**-**

Period of Employment : 09 Mei 2009 – 02 December 2016.

Position Held : SHIP ELECTRICIAN

Senior Ship’s Electrician (tutor) on board Vessel: Macuti at Beira, Mozambique.

Ship’s Electrician on board Vessel: Cap Martin at Bige, Papua New Guinea.

Ship’s Electrician on board Vessel: Sliedrecht 34 at Bige Papua New Guinea.

Ship’s Electrician on board Vessel: Hercules at Saupe, Brazil.

Ship’s Electrician on board Vessel: Huta 4 at Dammam, Saudi Arabia.

Ship’s Electrician on board Vessel: Huta 10 at Jeddah, Saudi Arabia.

Responsibilities

Do all relevant fault finding and repairs on all Electrical, Electronic and Instrumentation on board.

Do calibration on various instruments and electronic units.

Ensure that lock-out and tag-out procedures are fully complied with on the Dredger.

Did the site course on Confined space and obtain the Authorized Issuing Officer ticket.

Do maintenance and inspections on AC/DC motors and AC/DC generators.

Check and repair all lighting on board the Dredger.

Fault finding and repair of electrical equipment

Fault finding on switchgear, motors and starters. Panel wiring and modification in MCC and remote starters.

Design and build new control circuits for motor starters.

Install and maintain all UPS installations and CCTV cameras on board.

Do maintenance on Air conditioner units on board.

Utilized Programmable Logic Controller ( ABB, Siemens S5,S7, Telemecanique)

Supervising of the complete electrical revamping of Huta 10

At Macuti a new Trailer Suction Hopper Dredger I hold the job title of Ship’s Electrical (tutor). The role objective is to train and tutoring the local Electricians on board in the field of electronics coupled with regards to the new technology utilized on board of the Macuti.

Reason for leaving - End of contract.

Company : Cape Sawmills (PTY) LTD.

Polkadraai Rd.

Stellenbosch

Tel. +272********

Period of Employment : 09 March 2009 – 24 April 2009

Position Held : ELECTRICIAN

Responsibilities

Help installing the new machines.

Install new main cables from the substation to new distribution boards.

Install all new cables from distribution boards to the panels.

Install new cable racks for the cables.

Connect up all motors, sensors, limits and panels

Commissioning of the new plant

Reason for leaving - End of Contract.

Company : O.C.S.

Offshore Crew Supply

PO Box 41588

SHARJAH

UNITED ARAB EMIRATES

Tel. + (971*-*******

E-mail: *****@********.***.**

Period of Employment : 03 October 2008 – 05 January 2009

Position Held : SHIP ELECTRICIAN

Ship’s Electrician on board Vessel: Hercules at Saupe, Brazil.

Ship’s Electrician on board Vessel: Red Sea Fos. Offshore Rig standby in the

Congo

Responsibilities

Do maintenance and disconnect / connect AC/DC motors and AC/DC generators.

Check and repair all lighting on board the Dredger.

Fault finding and repair of electrical equipment, Cable joints and Installation of cables.

Utilized Programmable Logic Controller ( Siemens S5,S7, )

Fault finding on switchgear, motors and starters. Panel wiring in MCC and remote starters.

Make new inventory of all stock in electrical store and record it on computer files.

Reason for leaving - Contract put on hold.

Company : Monier Roofing SA (Pty) Ltd (Previous Lafarge Roofing SA (Pty) Ltd )

Moorsom ave.

Epping 2

Cape Town.

Tel. +27-21-534-****

Period of Employment : 30 July 2007 – 26 August 2008

Position Held : ELECTRICIAN

Responsibilities

Electrical maintenance in factory. Building of electrical panels and install them

Fault finding and repair of electrical equipment, Cable joints and Installation of cables.

Install and maintain variable speed motor drives.

Install new electrical panels and upgrading of old panels up to 400v ac.

Utilized Programmable Logic Controller ( Siemens S5,S7, LG and Telemecanique )

Fault finding on switchgear, motors and starters.

Panel wiring in MCC and remote starters.

Maintain and install CCTV cameras.

Reason for leaving - Company closing some operations. Job insecurity

Company : Terayne Electrical

97 Cradock Street

George

Tel. +27-44-874-****

Period of Employment : 01 August 2006 – 27 July 2007

Position Held : ELECTRICIAN

Responsibilities

Electrical maintenance, Wiring of houses and Flats.

Install the conduit according to the building plans for concrete floors and decks.

Install and wire Distribution Boards according to Electrical drawings in multi-story buildings.

Fault finding and repair of electrical equipment, Cable joints and Installation of cables.

Install step up, step down transformers up to 1000 volt 5 Kva.

Install and maintain variable speed motor drives.

Reason for leaving - Relocating to Cape Town

Company : Nabors International Inc

515 W. Greens Rd Suite 900

Houston Texas 77067

Tel. 281-***-****

FAX: 281-***-****

Period of Employment : 23 February 2006 – 4 June 2006

Position Held : SENIOR ELECTRICIAN on oil drilling rig Algeria

Responsibilities :

Electrical maintenance on SCR’s, Ross Hill controls, Cutler Hammer MCC and Canric Top drive

Installation of cables and power supply to drilling rig.

Cable joints, maintenance on caterpillar generator sets up to 1200 KVA.

Fault finding and repair of electrical equipment

Comply with health and safety regulation of local authority in Algeria.

Do faultfinding and maintenance on variable speed motor drives.

Reason for leaving - Temporary assignment

Company : Triple M Mining

P O Box 1868

Hartbeespoort

0216

Tel. +271*-***-****

Period of Employment : 03 January 2005 – 30 November 2005

Position Held : ELECTRICIAN

Responsibilities

Electrical maintenance up to 500V AC, Ross Hill controls

Install cables and electrical switchgear, connect electrical motors up to 500V AC

Cable joints LT and HT up to 11Kva

Fault finding on electrical equipment, SCR’s

Reason for leaving - Completion of contract

Company : EMPIRE AMUSEMENT PARK

19 Bundo Road, Sebenza, Edenglen,

Johannesburg. 1613

South Africa.

Tel. +271*-*******

Period of Employment : 15 October 2001 – 31 December 2004

Position Held : ELECTRICIAN: 15 October 2001 – 31 December 2004 and

HEALTH AND SAFETY REPRESENTATIVE: 02 May 2002 – 31 Dec ‘04 and

OPERATION MANAGER: 18 April 2003 – 31December 2004.

Responsibilities :

Operation Manager of Pleasure land: a) Ensure requirements of the OHS Act are observed. b) Enforce discipline. c) General supervision of machines. d) All employees instructed regarding the scope of their authority – Section 37 (1) (b) of the Act. e) Establish what danger is attached to any work and to take preventative measures. f) Remove any threat which may be of danger to persons. g) Inform employees of danger to his safety attached to his/her relative work. h) No employee to work unless danger has been established and precautionary measures have been implemented. I) ensure that provision of the OHS ACT and Regulations to Machinery are complied with for all Electrical & Mechanical aspects of all Pleasure Land machinery.

Electrical aspects of Occupational Health and Safety Act No 85 of 1993. Must ensure that all electrical aspects of the Occupational Health and Safety Act No 85 of 1993 are adhered to.

Health and Safety Representative: Carry out regular inspections of the Park. Report any deviation found to my direct supervisor. Ensure that all provisions of the OHS ACT are complying with Section 18 of the abovementioned Act.

Electrical maintenance, CUMMINS Generator sets

Fault finding on PLC (Siemens} and Frequency drives

Installation of new switchgear up to 400v ac, connection of mini substations 6Kva

Panel wiring and upgrading of electrical panels

Do faultfinding and maintenance on variable speed motor drives

Reason for leaving - Company in entertainment closing some operations. Job insecurity

Company : EDLECT

Period of Employment : 05 January 1999 –30 September 2001

Position Held : ELECTRICIAN

Responsibilities :

Electrical maintenance and fault finding on PLC ( Siemens and Telemecanique)

Installation of new switchgear up to 400V AC

House wiring, Panel wiring and upgrading of electrical panels

General mechanical maintenance

Install changeover switchgear panels for generators relating to industrial equipment

Reason for leaving - Job Offer

Company : SAPPI NOVOBOARD (PTY) LTD

Period of Employment : August 1994 – December 1998

Position Held : ELECTROMECH

Responsibilities :

Electrical and mechanical maintenance

Fault finding on switchgear, motors and starters

Installation of new switchgear up to 400v ac

Panel wiring in MCC and remote starters

General maintenance and replacement of mechanical gearboxes

Utilized Programmable Logic Controller ( Siemens S5 and Telemecanique )

Rewiring and upgrading of electrical panels

Install and do maintenance on variable speed drive motors

Reason for leaving - Retrenchment

Company : RUC MINING

Period of Employment : June 1993 – June 1994

Position Held : ELECTRICIAN AND MINER

Responsibilities :

Installing underground electrical equipment up to 500v ac

Underground blasting operations

Reason for leaving - Staff Retrenchment

Company : EMTEC CC

Period of Employment : February 1991 – July 1993

Position Held : ELECTRICIAN

Responsibilities :

Installing and repairing of electrical equipment up to 400v ac

Installing step up, step down transformers up to 1000v ac

Installing and repairing of elevators

Wiring of houses and electrical panels in factories.

Industrial electrical contracting and maintenance work

Crane and hoist maintenance

Crane and hoist load testing

Domestic electrical work

Install and maintain variable speed motor drives

Reason for leaving - Relocating to Carltonville

Company : C. GROENEWALD’S CONSTRUCTION

Period of Employment : September 1990 – February 1991

Position Held : ELECTRICAL OPERATOR

Responsibilities :

Installing of cable shelves and electrical equipment in a substation

Reason for leaving - Completion of contract

Company : INTERBOARD SA (PTY) LTD

Period of Employment : 25 January 1989 – 30 August 1990

Position Held : TRAINEE ELECTRICIAN

Responsibilities :

Electrical maintenance in factory ( During Shifts)

The process was PLC controlled with manuals overrides on all auxiliary equipment

I was responsible for the maintenance of the following equipment:

1. 2x 1100KVA transformers and auxiliary equipment

2. 12ton/hour chipping and milling facility

3. A 5m watt oil/timber dust fueled burner

4. 2.5ton/hour board presser

5. 5m/min sanding facility

Reason for leaving - Company closed down

Company : PRESIDENT BRAND GOLDFIELDS

Period of Employment : August 1971 – January 1989

Position Held : GENERAL MINER, SHAFT TIMBERMAN and FIRE

DETECTION TECHNICIAN

Responsibilities :

Underground blasting operations

Installing and maintenance of electrical fire detection telemetry equipment underground 32v dc.

Installation and maintenance of telecommunications facilities on the shaft.

Telecommunications cable joints up to 104 Pairs cable.

I was a member of EPU ( Emergency Protection Unit)

Reason for leaving - Relocating to George



Contact this candidate