Post Job Free
Sign in

Project State

Location:
Nigeria
Salary:
500,000.00
Posted:
February 12, 2017

Contact this candidate

Resume:

Surv.Adeboye Abel Ayodele

A**,Gbagba Oke-kudu,Opp.Ilorin International Airport,Ilorin,Kwara state.

Mobile:080********,080********,070********,************@*****.***

Name: Adeboye Abel Ayodele

Mobile Phone: 080*-***-****;081*-***-****

E-mail: ************@*****.***

Date of Birth: 11th Sept

Place of Birth: Odeomu,Osun-State

Marital Status: Married with Children

Profession: Surveying/Geoinformatics

Years of experience 19 years

Nationality: Nigerian

Current Position Chief Surveyor

Tribe: Yoruba

State of Origin Osun

State of Residence Kwara

Summary

Ability to meet up with the given deadline under favorable conditions and otherwise with the best output. This has being my watchword for over Twenty (20) years of continuous and consistent practicing of Surveying profession.

These has covered the Feasibility Studies, Designs and Engineering/Topographical Surveying of Roads, Dams, Irrigation, Drainages, Setting-out, e.t.c at almost all states of the federation with the use of the state-of-the earth surveying GIS hardwares like a Dual Frequency Differential Global Positioning System(DGPS),Total Stations, Digital Level and Softwares like,CivilCAD,Civil3D,AutoCAD,Surfer and host of others that help to have a good and accurate results, like Topographic map, Longitudinal Profiles and Cross-sections, Digital Terrain Model and Earthwork Quantities Calculations. All these have been effectively applied to ensure the best accuracy and professional integrity.

Surveying, my passion.

Highlight

•Team leader/Manager

•Route Surveying/Design

•Topographic Surveying for Dam/Map presentation at any desired scale.

•Topographic Surveying for Irrigation

•Civil Engineering Projects Monitoring

•Data Analysis, processing and calculations with the use of MS-Excel

•Map productions by using CivilCAD,Civil3D,Surfer,AutoCAD,e.t.c

•Master plan\Detail surveys

•Land-in-Dispute Surveys

•Use of Computer in plotting, design and quantity calculations.

•Honesty, Hardworking and dedicated with excellent psychology and physical fitness.

•Quick understanding of new hardware, software,and excellent ability to adapt to a new environs.

•Excellent ability to face and overcome any challenges.

Accomplishments

(a)

As Chief Surveyor\Team Leader:

Feasibility Study, Full Engineering Design and Construction Supervision of 2,200ha Dadin-Kowa Irrigation Scheme, Gombe State. World Bank Project.

Feasibility Study and Full Engineering Design of 15,500ha Guyuk Irrigation Scheme, Adamawa State. World Bank Project.

•Longitudinal profile and Cross-section Survey(at every 25m interval) of 235km Ilorin-Kabba Road. Including, Plotting of the profile and cross-sections-FMW Project

•Topographical\Detailed Survey of 3200ha Irrigation land of ongoing Tada-Shonga Irrigation Project. This include plotting and map production; Supervision of construction works(Canals, Drains, Structures, Access \Servicing roads).-FMWR Project.

•Topographical\Detailed Survey of 20km Zungeru HydroElectric Power Project Access Road.This include, production of Topographic map along the route for easy determination of the final alignment and Setting-Out.-FMP Project.

•Topographical\Detailed Survey of 2.7km Zungeru Hydro Electric Power Project(700MW) Dam Seat, including plotting of longitudinal profile for easy determination of the Dam Crest.-FMP Project

•Primary Controls resolutions/ Densification for Zungeru Hydroelectric Power Project with the aid of Dual Frequency Differential Global Positioning System.-FMP Project

•Topographical \ Master plan production of Thomas Adewumi International College, Oko, Kwara State. This include, supervision and monitoring of civil engineering projects within like Drainages, Culverts and Internal Roads Network.

•Land-in-Dispute Survey of Thomas Adewumi International College, Oko, Kwara State.

•Topographical\Detailed Survey of the 211ha of land belonging to the Proposed Thomas Adewumi University, Oko, kwara State. This include, setting-out, Plotting and map production.

•Land-in-Dispute Survey of the Proposed Thomas Adewumi University, Oko, Kwara State.

(b) As Senior Surveyor:

•Gurara Hydro Electric Power project, Kaduna State._Re-alignment of access road plus Plotting of the general layout plan, Longitudinal Profile and cross-sections.

•Iludun\ Isan Ekiti Earth Dam Construction and Access road Ekiti State.The task include Topographical Survey of the Dam seat, Survey of the Road Networks, Plotting of the General layout of the Dam Area and the Roads Network, Generation of the Topographic Map, plotting of the Longitudinal profiles of the Dam Axis, the Road Alignments and the Cross-Sections.

•17km Oko-Idofin Igbanna-Idofin OdoAse-Idofin Ayekale road construction in Kwara State. These include, Plottings, Setting out and Supervision of Construction works.

•Construction of Isapa Concrete Dam, Kwara State.This include Survey works and Monitoring of the construction activities.

•General Survey of the Construction of Gimi Earth Dam and Irrigation Project, Makarfi Local Govt., Kaduna State.

•Topographic survey of 300ha Paki Irrigation Project, Kaduna State. This include, Plotting and Generation of Topographic Map using Surfer Software with CAD.

•Topographic Survey of 250ha Wurno Irrigation Project and the Access Road- Sokoto State.

•Topographic Survey of Wammakko Irrigation Project, Sokoto State.

•Topographic Survey of Igabi Irrigation Project, Kaduna State.

•Topographic Survey of Sulma Earth Dam and 7km access road, Katsina State.

•Topographic Survey of NAF Base Earth Dam, Kaduna State.

•Topographic Survey of Belel-Pungel small earth dam,Adamawa State.

•Topographic Survey of six(6) small earth dams in Adamawa State.

•Edati Water Pipeline Survey, Bida, Niger State.

•Topographic Survey of Sasa earth dam,Lawoka,Osun-state.

•Topographic Survey of Kware Irrigation project,sokoto state.

•Topographic Survey of Odugbo small earth dam project, Benue state.

•Environmental\Drainage control survey at Ekenobizi, Abia state.

(c ) As Surveyor and other personal projects:

•Topographical Survey of about 120 river crossings(Rural Access and Mobility Project),Kaduna State.

•Topographical Survey of some dam sites(Kaduna State project).

•Water pipeline Survey(Kaduna State project).

•Water pipeline Survey at Obubra LGA of Cross-River State(EU project).

•Topographic Survey of Matari Dam, Kaduna State.

•Survey of road networks of Federal Ministry of Industry, Zaria office.

•Survey of road networks of Federal Ministry of Industry. Bauchi office.

•Topographic Survey of some Weir locations in Kaduna State.

•Hadejia Drainage control survey at Hadejia, Jigawa State.

•Topographic Survey of Saba small earth dam including access road,zamfara state.

•Survey and Setting out of Gotawa Multi-purpose dam axis alignment., Zamfara state.

•Survey and Setting out of Bunsuru Multi-purpose dam axis alignment.,Zamfara state.

•6km Route Survey from U/mailafia to Atuku tozo –Kaduna State.

•11km Route Survey from Atuku Kaza to Tajak – Kaduna State.

•Topographic Survey of Gumel Irrigation project, Jigawa state.

•Birnin Kebbi township drainage,Kebbi state.

•Ambursa-Gulumbe-Aliero road,Kebbi sate.

•Detailed Survey for Plan and Topographic Map Production of the following Roads in Adamawa State for Yaroson Partnership in Kaduna State:

(i)Bazza-Betzo-Mangoro-Kalikasa-Zah Road(24.4km)

(ii) Shuwa-Pallam (8.5km)

(iii) Mildo-Muduvu-Yibango-Masawa-Kamboro-Madagali (15km)

(iv) Kaya-Kuda-Bitiku-Yinagu-Sabon Gari (17.5km)

(v) Main Road-Koe-Koppa (7.8km)

(vi) Kpasham-Kebali-Yanga (15km)

(vii) Bille-Gumari-W/Hamawa-W/Bobbo-Gadamayo-M/Belwa (15.5km)

PROFESSIONAL BODIES AFFLIATION:

Member,Surveyors Registration Council of Nigeria(SURCON).

Member, Nigerian Institution of Surveyors(NIS), Kwara State chapter.

REFREE:

ENGR.AGUDE VERSHIMIA

MD/CEO,N-T&T CONSULTING ENGINEERS.

080******** ; 081********

********@*****.***

NEXT OF KIN/SOLE BENEFICIARY:

My Wife and Children

080********.



Contact this candidate