CURRICULUM VITAE
Career Summary:
Mining Supervising & managing Electrical Works in Cement, Gold Mining, Coal Mining & Power Plant
On site design, management and installation of Electrical works for Substation, Rotating Machine, Conveying System and Instruments installation.
Provide guidance and leadership to the superintendents/supervisors during construction phases to ensure safe, economic and efficient methods of installation
Establish accurate recording of progress, sub contract activities, expenditure and abilities to enable detailed reviews of safe working practices, conformity with client philosophy and accountability
Water Industry Supervise the installation of Electric Motors & Instruments; Design, Calculation the size of
Wires, Conduit Pipes and designed the desired instrument needed like level sensors and
Pressure Transmitter and Pressure switch.
Power Plant Supervisor, Engineer, Agent, Sub-contract Manager, QA Representative for the Installation of Combined Cycle Power Plant and Heat Recovery Steam generator G.E. Brand
Transmission & Distribution Supervision & management of the construction of 138KV, 69KV, 33KV &5KV Transmission and Distribution Lines
Structures Supervision & setting out the Construction of Electrical Line Structure and Pole Line Installation
Electrical Substation Engineering reviews, logistic reviews & management for the completion of the project
Skills:
Excellent interpersonal skills. I have successfully completed tasks and projects in a Guam, Fiji Island, Malaysia and in the Philippines where cultures, traditions and methods need to be considered and combined with high standards of management, accurate interpretations, good recording methods and safe working practices.
Education:
BSc Degree in Electrical Engineering
Master of Science in Electrical Engineering
Employment Summary:
DATE: March 11, 2014-Present
Company: MPH global
Assigned: Lhoist Malaysia
Tapah Perak, Malaysia
Position: Electrical & Instrumentation Engineer
DUTIES AND RESPONSIBILITIES
Supervised the Installation of 33KV line Substation until Commissioning, cold testing & Sequential test of controls & Instrment, Electric Motor installation until testing and commissioning, Installation of Medium Voltage Switchgear and Commissioning& testing of Protection Relay. Supervised the Installation of 3 Units Combined Cycle Power Plant.
Supervised the electrical testing of Panel Board and Motor Control System
Designed the FAT for Allen Bradly PLC
Designed the Sized of Electric Motors of the Pumping Station
Designed the Instrument needed of the Pump equipment
Performed the design of all Instruments of their waste water treatment.
DATE: Feb.10, 2012-Feb. 20, 2014
Company: PERNIX GROUP Inc.
Lombard, Illinois United States of America
Kenoya Project, Fiji Island
Coal Power Plant Project
Position: Electrical & Instrumentation Engineer
DUTIES AND RESPONSIBILITIES
Prepare Commissioning Plan for their coal Power Plant and execute to lead the team in a Pre-commissioning and commissioning stage starts from the Boiler, Steam Turbine, & 13.8KV Switchgear and their Substation Transformer. Operate at the control room and start up the Boiler and Power Generator steam turbine G.E. Brnd.
Date : Feb. 05, 2009-January 2, 2012
Company : GREENSTONE RESOURCES INC., Tubod, Surigao Del Norte Philippines
Position : POWER PLANT AND ELECTRICAL/INSTRUMENTATION HEAD
DUTIES AND RESPONSIBILITIES
1.Demonstrate leadership & personnel supervisory skills.
2.Performing FEA electrical field analysis studies and interpreting results to allow detailed engineering of bushings, electrical contacts, and cable terminations. Conduct commissioning and maintenance of Electrical Equipment in Mining Industry
Date : 27 Aug 2007-January 30, 2009
Company : SEMIRARA MINING CORPORATION, Semirara Island, Caluya, Philippines
Position : Electrical and Instrumentation Engineer
DUTIES AND RESPONSIBILITIES
1.Responsible for the development of plant and equipment maintenance schedules, materials required and manpower needs on an economically justified basis; ensure consistency of practice and application of programs and policy across the company.
Date : Feb. 14, 2004 - 31 July 2007
Company : TERESA CREW GOLD CORPORATION (APEX MINE CO.) Masara, Maco, Comval Province,
Philippines
Position : Electrical & Instrumentation Manager
DUTIES AND RESPONSIBILITIES
1.Assists the Resident Manager in terms of planning and organizing functions.
2.Performing FEA electrical field analysis studies and interpreting results to allow detailed engineering of bushings, electrical contacts, and cable terminations. Directs and coordinates with his section heads in the preparation of operational plans and budget of his department including procurement programs.
Date: 10 Nov 2001- Dec 2003
Company: NATIONAL TRANSMISSION CORPORATION –
Mindanao Area, General Santos City
Position: Senior Engineer
DUTIES AND RESPONSIBILITIES
Supervise the whole expansion personnel in Klinan Substation.
Prepare the as built drawing of schematic diagram of old Sub-station
Supervise the one unit feeder line installation of SF6, CT, DS and prepare its individual structure.
Supervise in wire tracing of all control wire from switch yard to Control Panel Board
Supervised all Electricians during Maintenance in Mt. Apo Sub-station & Klinan Sub-station General Santos City
Date: April 2, 1998- October 25, 2001
Company: LEGASPI OIL CORPORATION - Sasa Davao City, Philippines
Position: Electrical Consultant
DUTIES AND RESPONSIBILITIES
The Engineer as Electrical Consultant of the Company, will visit the plant and inspect, review and evaluate the Electrical System of the processing facilities and to conduct test for power feeders and circuits such as insulation, grounds, and short circuit fault test. The visit will be four times a month, every Friday, thereof, each month.
Date : 20 Sept 1996 – 31 March 1998
Company : DAVAO UNION CEMENT CORPORATION - Davao City, Philippines
Position : Electrical Maintenance Superintendent
DUTIES AND RESPONSIBILITIES
1.Responsible for maintenance of all electrical equipment like,Squirrel Cage Induction Motors, 1Hp-150Hp, 440V, 3phase, Siemens brand, Wound Rotor Induction Motor ranging from 600-6000Hp, 4.16KV, Helmke brand made in Germany, Direct Current Motor, 250-750Hp, 440V,Vacuum Circuit Breaker from medium voltage, which is 4.16KV, Siemens brand. SFG Gas outdoor type circuit breaker, dead tank type, and Siemens brand, transformer 69KV, AEG brand.
Date : 12 Feb 1989 – 19 Sept 1996
Company : DAVAO UNION CEMENT CORPORATION - Davao City, Philippines
Position : Electrical Project Engineer
DUTIES AND RESPONSIBILITIES
Scope of Work: During Expansion of Dry Process Cement Plant with a Budgeted of
PHP 800,000,000 for Electrical Equipment’s
•Responsible for the design of all electrical equipment’s.
Date : Aug 1987 - 17 Sept 1988
Company : DAVAO UNION CEMENT CORPORATION - Davao City, Philippines
Position : Preventive Maintenance Inspector
DUTIES AND RESPONSIBILITIES
•Daily inspection of all Electrical Equipment and perform Preventive measures if there are abnormalities.
Date : 13 May 1986 – 2 Aug 1987
Company : DAVAO UNION CEMENT CORPORATION - Davao City, Philippines
Position : Junior Electrical Engineer
DUTIES AND RESPONSIBILITIES
Assist the Electrical Maintenance Engineer in the preparation of Activities at plant wide in day to day activities.
Date : 2 July 1984 – 12 May 1986
Company : DAVAO UNION CEMENT CORPORATION - Davao City, Philippines
Position : Shift Electrician
DUTIES AND RESPONSIBILITIES
1.Responsible in maintaining of all electrical equipment in the Plant being assigned by immediate supervisor.
Character Reference:
Mike Palaric Site Manager
MPH Global
Lhoist Company
Tapah, Perak Malaysia
Contact No. +601********
Mr. Mounir Khaled Construction Manager
MPH Gobal
Lhoist Company
Tapah, Perak Malaysia
Contact No. +601********
Mr. Vicente Yambao Naval Architect
SRF, Santa Rita, Guam USA
Contact No. 5657434
I hereby certify that the above information is true and correct to the best of my knowledge and experience.
Fedilino Fornolles