Inocencio Oliveira
Houston, TX *****
832-***-**** *********.*****.********@*****.***
HOLIDAY INN
Maintenance Engineer
General maintenance experience for the hotel
Troubleshoot boilers, painting, electrical, doors dry wall, installations.
Working with TOTAL EP
I worked in Norway - Horten on the stuck up for Total EP CLOV (Block 17) development, FMC’s scope of supply includes the manufacture of 36 subsea trees, wellheads and controls. We also supply eight manifolds, two workover systems and associated tooling and equipment. Deliveries was scheduled to commence in the first quarter of 2012. We continue to develop local execution capability in the region and will conduct the following activities in Angola:
Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
Manufacture of 7 complete manifold systems
Critical equipment testing, offshore installation support and equipment refurbishment
Additional recruiting and training of onshore and offshore personnel
Investment in local facilities
FMC Technologies Awarded $520 Million Order for Total's CLOV Development project consists of the Cravo, Lirio, Orquidea and Violeta discoveries, located in approximately 4,500 feet (1,370 meters) of water in Block 17 offshore Angola.
Training & Development
Subsea Introduction
Wellhead Systems
Subsea Structures
Completion Systems
Work over Control Systems
IWOCS Systems
Tie-In and Intervention Systems
Well control system
Large bore
Field Service Engineer – Drilling / Completion
Running with SFT, tube hanger,
Preparation and testing all X- stuck (XTRT)
Make up and run Tubing Hanger with Expro Landing String Assy. (ELSA)
Run vertical X-tree
Surface flow tree on ADS.
Make up conflex hoses.
Pressure test to start monitoring BHP during pressure test to ensure that if there is no leak on the valves
Tubing Hanger
Re-assembly Installation Actuator in SFT
SFT Test and Maintenance
Demobilization TH Mode Hang off Bushing
TH & TH Running Tool Hydraulic test
XT Equipment Tools
EDP - Strip down and Maintenance
LRP - Strip down and Maintenance
X-Tree Connector Strip down
Wellhead Equipment Tools
30’’ Conductor Housing Maintenance& inspection
Wellhead running tools Maintenance & Test
Conductor Housing running tool Maintenance & test
Single trip Tool Maintenance & Test
Annular tool kit Maintenance
Rigid lock –Running tool Maintenance
Spring Loaded Tool Inspection & Maintenance
Drill Ahead Tool Maintenance & Test
Wo Sheave Maintenance
Dart Sub Maintenance
Cement Clean Out Tool Maintenance
PGB Maintenance & Calibration with Bulls Eyes
Wellhead and Completion
Operation and Installation.
Make up and run PGB/ Conductor
Make up and run Wellhead housing
Make up and run RLSA
Make up and run all UWD15- Well head Tools
Adjustment of Tubing Hangers
Preparation and testing all X- stuck (XTRT)
Make up and run Tubing Hanger with Expro Landing String Assy. (ELSA)
Run vertical X-tree
BOP Pressure Test.
Surface flow tree on ADS.
Make up conflex hoses.
Work History
Field service Engineer - FMC Technologies – 2012 – 2015 (Luanda-Angola, Horten, Kongsberg, Bergen - Norway)
Night Company man - Plus Petrol – 2010 - 2012 (Cabinda-Angola)
Senior Fluid Engineer - MI Swaco – 2006 – 2012 (Luanda-Angola)
Derrick man - Global Santa Fe - 2004 - 2006 (Cabinda-Angola)
Other Experience
Cyber security advisor – Sistec Angola – 2002 – 2004 (Cabinda-Angola)
Education
Bachelor of Science, Chemical Engineering, College of Engineering, Cal poly Pomona, CA
High School, Pre – University Course Science – PUNIV Cabinda - Angola