SAURABH SHIDHORE, MS, MBA
Phone No: 682-***-****, Austin, TX Email id: ***************@*****.***
Objective: Seeking a challenging position in a reputed company where I can demonstrate excellent leadership, business and team work skills to produce effective results.
Education
Campbellsville University, Louisville, KY: Present Master of Business Administration (MBA)
University of Texas at Arlington, Arlington, TX: 2012-2015 Master of Science – Industrial Engineering
University of Mumbai, Mumbai, India: 2008-2012 Bachelor of Engineering – Production Engineering
Certifications: Six Sigma Green Belt, Strategic Business Analytics, Python Data Structure, Lean Management, Project Management, WMS, RFID Supply Chain Practitioner.
Core Competencies
Business Analysis
Procurement Process
Process Improvements
Documentation & Specification
Budgeting & Forecasting
Operational Planning
Project Scheduling
Supply Chain & Logistics
Cost Reduction
Data Analysis and Interpretation
Continuous Improvement
Object-Oriented Analysis
Technical Skills
Software: SAS, SAP, MS (Word, Excel, PowerPoint, ACCESS), MS Project, MS Visio, Tableau, MATLAB, MySQL
Techniques: Six Sigma, SDLC, Kaizen, R, ANOVA, Kanban, Test Cases, Test Plan, ERP, Python, Java, C, C++, Value Stream, Agile, SCRUM
Professional Experience
Supply Chain Business Analyst SCM DataòJersey City, NJ ò 2015 – 2016
Research, access and analyze various aspects of the organization and its processes.
Prepare briefing documents, reports, meeting agendas and presentations as directed.
Used Six Sigma and Supply Chain Management techniques to expand the business and fulfill the customer’s needs using relevant software tools and technologies.
Respond to and resolve any customer inquiries and requests in a timely and professional manner.
Information Technology management of client organizations for activities including strategic planning, capital planning, performance improvement, process improvement and standards development.
Prepare and maintain project plans and work breakdown structures using MS Project and MS Excel software.
Industrial Engineer- Continuous Improvement Engineer Industrial Engineering Corporation ò Mumbai, India ò 2012 – 2013
Implemented techniques such as Lean manufacturing and Six Sigma to manufacture high tensile fasteners such as nuts and bolts, which increased efficiency, profit and customer satisfaction.
Successfully implemented Route Card (Kanban) system and Daily Improvement Sheet to aid in traceability of manufacturing process and increase work floor space by 15%.
Trained, managed and lead around 100 employees in the company on several project..
Effectively applied lean manufacturing process to enhance process throughput by 5%.
Utilized extensive engineering skills to develop bill of materials, cost estimates, value stream maps and in-depth data analysis.
Efficiently reduced lead-time and excess inventory using JIT philosophy and report to the Inventory Manager.
Production Engineer - Manufacturing Engineer Refair Industries ò Mumbai, Indiaò 2011 – 2012
Designed and developed a company product utilizing pressure die-casting to eliminate drawbacks from gravity die-casting.
Applied best practice based manufacturing and logistics management techniques to the production process to increase production efficiency.
Identified and eliminated non-value added activities such as time loss and excess production using Lean Production.
Reduced labor cost by 10% through effective process streamlining.
Projects
Fair Traders Facility Redesign: 2015
Implemented continuous improvement techniques such as Lean Six Sigma to maximize efficiency and throughput by removing the bottleneck, decreasing movement of labor, reducing process time, and minimizing direct and indirect costs.
Utilized WMS to improve the efficiency of company’s warehouse operations by 25%.
Quality Analysis of an Electric Toothbrush: 2015
Analyzed various problems such as battery performance, sensitivity and clogging using product development techniques including PDCA cycle, Six Sigma, FMEA and SWOT Analysis.
Utilized control charts for process improvement analysis considering the given data for the dimensions & weight of the product.
Developed process documentation worksheet.