Post Job Free

Resume

Sign in

Petroleum - Production and operation Engineering in drilling Rigs

Location:
Muscat, Muscat Governorate, Oman
Salary:
Nego
Posted:
February 07, 2017

Contact this candidate

Resume:

Résumé

Hesham Sayed Ahmed

Nationality : Egyptian

Home Address : ** **** ****** – Nase City – Cairo - Egypt

Cell Phone : 002 010-***-**** in Egypt or +968-******** in Oman

Last Post : Chief PE in PDO Oman & Artififical Lift advisor

Special / contact mails : acypk5@r.postjobfree.com

Qualifications

Highest qualification : Bachelor degree

Subject : Petroleum engineering

Establishment / Country: Cairo University, faculty of engineering

Computer Skills and software used

MS office, Excel, Win word, ….etc

Oil / gas industry Software : GAP, Emeraude ( PLT, PSP, FSI ), Prosper, GAP, SAM system analysis model, Flosys, Schlumberger Pipesim GOAL, Pipesim Net, Hosim, Land mark tubcad, Stimcad, Perform, Wellcat, Stimcad, OFM, Frac cad, Pie well test, Saphire well test, data management (Pies, Finder, DSS,….etc

Experience classification

* Have 24 extensive experience of up / down stream operations with significant experience in a supervisory and management capacity in oil, gas ( dry, wet and condensate wells ) and water industry in major oil company in international oil and gas joint ventures ( SUCO – Furat – ADCO – Petro china and finally BP Egypt ). Currently I am working in PDO Oman

* Have a managerial level, in depth exposure to diverse aspects of the operations, such as production, drilling, completions, logistics, loss control, environment and safety with practical supervision or management of wells Stimulations, Fracturing, Sand control Slick – E line operations, work over operations, Production facilities, wells integrity, operation activities, plant process in an onshore \ offshore production environment, in harsh climate conditions.

*Have ability to solve problems, multi task skills and identify enhancement opportunities that including proficiency in field development planning, risk, well performance prediction and uncertainty analysis .

*Have a track record of working in a multicultural, multinational environment with full commitment to core value principles ( petroleum engineering, HSE, leadership) .

*Strong experience and background in field practical operations process including separation equipment, water-handling facilities, flow lines, well testing, and data gathering.

*Good working knowledge of personal computer applications and software for engineering purposes. Excellent communication and interpersonal skills.

*Have HES conscious, and experience in working with safety management system like permit to work, etc.

* Have ability to work with a multinational work force .

* Participate in Tenders and Interacting with Government officials. Knowledge of budgeting cost estimating, and fiscal management principles and procedures.

* Have Skill in examining and re-engineering operations and procedures, assist in formulating policy, and developing and implementing new strategies and procedures.

* Daily operational management of the onshore and Offshore district PE Leaders, Personnel

coordinators to ensure production is maintained at the safest and highest possible levels

at all times

* Excellent Knowledge of business and management principles involved in strategic planning, resource allocation, leadership, production methods, and coordination of people and resources .

* Developing and implementing standard operating procedures for production and maintenance, consistent with regulations in addition to ensuring that all necessary preventive and corrective maintenance is carried out and an adequate inventory of spare parts is carried

*Have wide mentoring skills to create an environment that helps to develop Egyptian

And BP employees.

*support and guidance to all teams with the aim of achieving operational excellence

And enhancing operational effectiveness by follow up and Identify the field operational solutions that will improve productivity and implementation of best practices in the field

Key competencies

Wells/Field/Asset Modeling reserve estimation, production forecasting, well modeling, field modeling, integrating asset modeling IAM, optimize the field production/injection using the SAM, PIPESIM, Prosper, GAP, MBAL, Finder, PIES, Pansys, pipe phase, perform, stimcade, Wellcat,…etc

Artificial lift: (gas lift, electrical submersible pumps ESP, jet pump, beam pump “Sucker Rod )

(design, installation, operational)

Mentoring and Coaching Set the training program for the new employee

Field development plan(FDP) Lead multi-disciplinary teams to expand the condensate production from condensate reservoir

Wells integrity and water management system ( Water and gas injection ) ( WAG )

Advanced understanding of continuous improvement

Wells, reservoir and Facilities management

Availability

Earliest start date : Given 2 or 3 Weeks notice

Work Locations

Are you willing to move or relocate?

Yes – I will travel domestically or internationally

Yes – I will relocate domestically or internationally

Countries NOT willing to work in ?

Iraq and Nigeria

Comments / Hobbies

Reading, playing football and listen Music

Detailed Work History

May 2013 – Currently

Chief Petroleum engineering in PDO Oman : Responsible for

-Leads across team task forces and initiates/ contributes to work plans

-Reviews application of new technology, including directing and participating in feasibility STUDIES. Recommends and plans special tests or test runs prior to recommending field wide implementation

-daily monitoring, evaluation, analysis of production/ injection performance against potential performance, maximize and optimize volumes

-Technical support to the company's projects during the studies, appraisal, development and operation stages.

-perform analysis, interpretation and problem solving at all levels of complexity with varying volumes of data is required

-well performance prediction, artificial lift selection, well completion design especially horizontal

-well intervention techniques, flow assurance issues, stimulation / Acidizing including hydraulic fracturing

-water management such as water treatment, disposal, water shut-off, during water injection, souring prediction and prevention, produced water injection and scaling prediction

-Participates in the training and development of assigned Omani national employees. Includes monitoring and reporting on progress

-Lead Well integrity

-generate weekly/monthly production rates & review injection targets and well test priorities

-Follow up the Company health, safety and environmental policy, procedures, regulations and objectives

-Complete post well intervention assessment, to ensure continual improvement

-Initiate team business plan

-Focal point of all artificial lift technology / Perforation strategy

july 2009 to April 2013 Sub surface PE Leader) ( BP ) & AL advisor

Reporting to : line management of Technical Centre (Development and Drilling managements )

Responsible for : most of the Production, drilling and Petroleum Engineering activities ( surface and sub surface ) in major 3 teams ( 4 fields only, around 280 wells, gas oil water ) in GOS ( Rig and Rigless operations ) ( Operations, facilities,…etc)

Manage, schedule and safely execute all Field production operations ( day by day ) to ensure the continued increase of oil production to assist in maintaining the company’s core business and future growth with adhering to best international oilfield practices

Ensure that the company’s production targets and forecasts are safely achieved within 4 fields that associated operations are within or close to operating budget by closing monitoring and reviewing day-to-day operations and ensuring effective communication with internal and external field personnel.

Recommend and supervise methods of safely increasing production within the budget and operational constraints with ensuring that all field planned operations are carried out to facilitate optimization of oil production

Develops completion, recompletion and work over plans for new and existing wells. Initiate the required new technology and obtain the management approval

Manages oil and gas production operations ( Rig / Rigless ) in the fields to maximize profits in each assigned area. Report a monthly production trend with the shortage and best practical solution for restoring the productivity.

Co-ordinate production monitoring and evaluation with suggesting and discussing any changes, which may be required for the improvement / enhancement of field operations to enhance production

Provides cost and timing estimates for current and future work overs. Reviews / Recommend the economic status of wells/fields with the objectives.

Selects best contractor through official tender process, high quality equipments and prepare / executes the proposed paper work for management approval

Provides technical support for oil and gas production operations

Identify wells for intervention and ensure that all reports are prepared and submitted to all relevant authorities with obtaining in time all necessary approvals from all relevant authorities (especially EGPC

Manage relation ship with contractors and maintain good working relationship with government Agencies, prepare the required contractor KPI key performance indicator

Establishes and maintains optimum flow assurance program for wells/fields

Work closely with Management Team to ensure business unit and organizational requirements are being met

Manage the repeated well problems while Rig on site and find out the best practical solution.

Assist in preparing and monitoring capital and expense operational budgets

Interfaces with team members concerning future development plans

Coordinate with partners on operated and non operated wells to determine optimal production flows

Ensure provision of high quality petroleum engineering support to the exploration, appraisal, development and reservoir management of the Company assets.

Manage the Petroleum Engineering functional budget. This budget provides funding for training, conferences, business travel, consultancy services, technical software, and other minor costs within the scope of the Petroleum Engineering function that are not directly required by an approved project.

Participate in industry Seminars and work shops to ensure best in class knowledge exchange.

Assist in Preparing the Annual production forecasts based on the condition of producing wells, the capacity of new wells, planned production activities, the characteristics of each field, government/partners' requirements and eventual plant constraints; to present the forecasts to our management. Also Provide sound reservoir management to the fields to optimize oil and gas production and ultimate recovery.\

Controlling the inventory, Handling logistics and assist in interviewing candidates and supervising employees

Developing and implementing standard operating procedures for production and maintenance, consistent with regulations in addition to

Ensuring that all necessary preventive and corrective maintenance is carried out and an adequate inventory of spare parts is carried

Works with Production Operations to maintain required safety training and compliance, Company resource, consultant, mentor, and coach

Facilitates knowledge sharing of best practices to improve delivery and build technical know how of all the PE staff.

Sep. 2006 – July 2009 Senior petroleum engineer ( BP Egypt )

Reporting to : Western desert engineeering manager

Production Engineering/Production Technology input in existing / mature fields (well performance data e.g. production / injection trends, production logs etc.

Well management’s strategy including well planning / design / follow up and implementation with Drilling department.

Generate opportunities to protect and/or enhance production and activities to mitigate risk and record same in the appropriate hopper.

Overall production / system optimization (clear objectives ) of producing field(s) with sharing reservoir management within the IPC installed production capacities boundaries Production Capacity (IPC) boundaries

Responsible for Conducting a regular scheduled multi-disciplinary Well Reviews and implement the required agreed actions

Plan and execute high cost well work and all interventions in high value wells

Develop and execute the Short and long term ( Annual ) Surveillance plan with a cross disciplinary Team

Manage all wells integrity in accordance with the Integrity Management. Generate the best technical estimate of in-year performance

Generate and progress the production enhancement opportunities. Track / follow up and execute the new technology performance.

Beam pump “SR “contract, designing, commissioning, start up and trouble shooting. Measure the fluid level, interpret the down hole dynamometer, identify the root cause of failure, use new technology to reduce the failure down time and increase the run life, use the RPC rod pump controller like SAM well manager .

Measure the performance through tracking all well work outcome (cost, timing, rate and reserves) against plan

Set the operating procedures for managing the wells and surface facilities ( DD limit for Coning / Completion, Equipments)

Completion designs of new wells either in open / cased holes. Identification of production / water, gas flooding & optimization activities e.g. work over’s, re-completions, artificial lift upgrades etc.

Manage well services provider performance following the principles of the preparation, programs, execution and results.

Coordinated with other disciplinary approach to understanding the system, its components, constraints and levers. Measure the impact of change and share the results with them

Recommendations on perforation and stimulation strategy. Identification of testing and sampling requirements to support field development planning. Preparation and supervision of testing and sampling program

Generation of well performance curves (Producer & injectors) for input to simulation models.

Obtain asset management budget approval for Surveillance activities and track plan and spend attainment

Monthly updating of wells status and recommending the best operating philosophy if required .Responsible for routine well production surveillance and problem well diagnostics

Work over programs for remedial work including ESP change outs, re-completions, water / gas shut off techniques ….etc.

Ensure risk management plans are in place for the well stock. Ensure that wells of increased HSSE risk are documented.

Co-ordinate, monitor daily field work including pressure surveys, cased hole logging and production testing

Perform inflow-outflow calculations to determine well rates, tubing size and lift tables; Determine when and what type of artificial lift is needed; Perform sand management system that including sand failure prediction calculation; Select optimum sand control method;

Ensure databases (Data management) are comprehensive, accessible, accurate, and easy to view and output.

Conceptual and detailed surface facilities design; Build and update well and production system models; Ensure all work is properly Quality Controlled by the appropriate technical authorities, the findings are documented and action items formally closed-out;

Technical coaching to less experienced Production Technologists in the team.

June 2005 – Sep 2006 (Schlumberger ( Petro china " China" )

Senior petroleum ENGINEER (consultant)

Responsible to do all petroleum engineering activites especially Sand control technology, Fracture and stimulation etc

July 2001 – June 2005 (( ADCO COMPANY (ABU DHABI) UAE

Design; execute oil / water / gas wells testing either producer or injector (flow-after flow FAF, Isochronal/modified isochronal test, PBU, fall off test with interpret all these testing using computer software (i.e Pan System, Saphir, Schlumberger well test 2000).

Design the artificial lift wells. Determine water cut at which well die /ceased flow, Perform a feasibility study on Gas lift or ESP to select the best suitable lift for wells.

Work in close co-ordination with other discipline such drilling, reservoir management and laboratory organizations. Design and implement the oil/water/gas wells stimulations (acid zing) procedures either with using the coil tubing or bull heading techniques in carbonate formations (using computer software Stim cade) and select the optimum stimulation technique together with the suitable treatment fluids.

Review wells / field performance and identify any troubles with introducing a recommendation

Conduct special studies for the purpose of optimizing stimulation campaigns together with field operations and engineering units as required.

Design and qualitative interpretation of corrosion logs in tubing and casing.

Select the best specification of perforator gun to get more production/injection using the nodal analysis mode.

Close monitoring of the cement operation job and evaluate the cement behind pipe using CBL-VDL-GR-CCL or USIT,..etc,Share/assist in selecting the best suitable type of corrosion inhibitor either inside the tubing string or in the flow line with chemical division. Onsite technical support to all field rig/rig less operations.

Setting a well work over or prognosis program with designing and optimizing the completion size either in oil/ water / wet – dry and condensate sour or sweet reservoir.

Supervise critical rig/rig less operations and electrical wire line logging such perforating, production logging PLT, flag ship TDT, RST and repeat formation test or MDT with collecting down hole sampling.

Provide technical advice and guidance for young/junior national graduate engineer.

Assist in initiating innovative proposals and papers for internal publications.

Calculate the minimum gas rate and pressure to avoid the liquid loading and corrosion rates inside the tubing string.

Perform the Wells choke performance using computer software’s

Model the well performance or group of wells using computer software ( GAP)(Global analytical performance) ( PROSPER+ MBAL+ Surface

Jan 1997 – July 2001 Petroleum engineering consultant ( Al Furat Company, Syria )

Prepare and execute a Rig / Rig less Work over programs using "Coil tubing, etc" for gas/water shut off and setting mechanical bridge plugs and Cement retainer. Wittiness on open hole logging operations and provide quick look interpretations.

Review regularly all production data to assure that all normal operating parameters are being maintained, that the throughput is stable.

Prepare Well stimulation and acid wash programming, execute same and work over evaluation.

Prepare, perform and analysis the following jobs (RFT, MDT, DST) and collect a down hole sampling for PVT analysis. Follow up Casing-Cement operations, Run and evaluate the cement evaluation tools (CBL-VDL, CET, USIT). Select, prepare programme for Perforation/Re-perforation jobs Cased/through tubing (Enerjet gun, Pivot gun, TCP).

Prepare and perform the down hole survey (PLT, PSP, FSI, TDT, Flagship, BHP, Pressure transient test PBU, fall off test, interference test ).

Wells and field performance monitoring /evaluation /optimisation and problems identification and solving.

Ensure that all well testing, production monitoring and data acquisition is carried out effectively and efficiently through good written programs and communications with production department field personnel.

Conduct planned inspection for most of surface facilities on timely manner and identifies improvement opportunities.

Make recommendations and assist Facilities Engineering department during project conceptualization and engineering design stages of new facility, equipment installations (include plant facilities) and artificial lift installations. Participate in "what ifs" and "HAZOP" reviews. Participate in the MOC process Review and approve new and updated operating procedures for safe shutdown, startup and operation of plants and equipment. Optimize well and surface production facilities equipment.

Monthly tracing, analysis well/field production and water injection profiles to identify anomalies and calculate the replacement ratio.

Prepare, implement and evaluate the Scale removal /Scale inhibition program using chemical and mechanical means.

Participate in Production Technology input into the short and long term production forecast.

Implement a pro-active culture to transfer and maintain technological knowledge to operations staff as part of project delivery.

Preparation and verification of the field production allocation.

Dec 1988 – Jan 1997 ( Suez oil Company )) (PRODUCTION TECHNOLOGIST)

Gas lifts designing /operations/ optimization. This includes theoretical gas lift design either manual or using Computer Soft wares (such as SAM, Pipe Sim, Flow system) for wells /Networks. Analyzing parameters, valves Depths’, spacing, gas quantity, monitoring the annulus pressure, etc…) and recommending the necessary actions to overcome wells problems’. In addition, implementing design programs in the field and trouble shooting malfunction in gas lift string. This includes valves, set and retrieve in hole using wire line setting pressure in workshop changing or adjusting the gas chokes, etc…

Design new installation for pilot and full field artificial lift projects for selecting all required down hole and surface facilities. Down hole sand prediction / monitoring "identify the trend" for the existing and new wells.

Supervise installation work by vendor or personnel and work over rigs in the field including down hole monitoring equipment.

Selecting appropriate pump series, adequate motor and accessories including separators, advanced gas handlers, number of stages, etc… suitable for well conditions with selecting pump depth for optimum operations regarding well inclination and static/dynamic fluid levels.

Monitor existing installations, analysis performance, and direct adjustment of operation parameters, optimize designs to fit changing well conditions, trouble shoot problems and do failure analysis. Adjusting the pump operation using surface variable speed drive (VSD).

Ensuring full integration with drilling/completion team during the planning and execution stage of the field development. Evaluation and optimization of wellbore and completion design for development wells . Coordination of the strategic multidisciplinary work effort required to determine the most suitable, technically viable and cost-effective field optimization alternatives. Collaboration with reservoir development and drilling teams on identifying well and reservoir management strategy for the field, generating related procedures as well as cost estimates and schedule developing design standards as required to best suit the field development

Set artificial lift equipment for standardization and requisition while training a less experience engineers to assure this function. Trouble shooting using ESP sensor pressure/temperature/events.

Using special alloys for sour environments.

Optimizing the ESP performance from previous experience, hence exceeding a world wide record of three years of continuous operations in sour environments. Using a Snubbing unit (Work over Rig) for significant Cost reduction.

Little experience with Jet pumps applying it for a short time within SUCO Company and sharing lately in running new technique for jet pump safety valve in one of the sister companies.

Achievement

Upgrading the existing installed ESP in WD area (Egypt ) ( Razzak field ) .

Setting a global procedure of the well integrity policy in GOS ( Egypt ) ( July / Ramadan fields )

Modelling surface/subsurface network for Thammama C (Wet / condensate gas reservoir) (Bab Field) using the software GAP-MBAL-PROSPER. ( Dec.2004)

Perform a feasibility study of utilising the artificial lift system (gas lift / ESP) in BAB field, oil wells using the software Pipe Sim.

Expand OGD 3 project ( Field development plan ) for enhancing the condensate from the condensate reservoir

Assist in Ras Budran gas lifts requirement study, resulting in the justification of a 4th gas lift compressor ( Nov. 1997 ) . Completion of several successful works over/re completion campaigns resulting in an increase in oil production ( Ras Budran/ Ras Fanar fields ).

Shell Work shop (June, 2001) in Egypt concerning best practices in oil industry. Presenting a paper reflecting outstanding life time for ESP’s in Sour environments ( Ras Fanar Field).

SPE - Papers ( Some of them )

SPE 77934 Successful application of ESP in a very corrosive environment in Gulf

SPE 128320 New acid diversion technology helps stimulation of production and injection

SPE 119361 Real time production monitoring uncovers potential for recovery optimisation



Contact this candidate