Senior Drilling Supervisor
EQUIPMENT ON NEW PLATFORM CONSTRUCTION - Belfast, ME - January 2014 to Present WORKING AS SENIOR DRILLING AND PROJECTS SUPERVISOR IN THE HARLAND WOLFF SHIP YARD BELFAST IRELAND. SUPERVISING THE EQUIPMENT UPGRADING ON THE BLACFORD DOLPHIN SEMI- SUBMERSIBLE DRILLING RIG.
MOVE RIG OUT OF SHIPYARD INTO THE NORTH SEA OFFSHORE WEST THE OF SHETLAND ISLANDS. DRILLED AND COMPLETED 20K ft. HORIZONTAL WELL FOR MPX LTD. PROJECT WAS COMPLETED, I WAS LAID OFF DUE TO THE 2014 OIL PRICE CASH AND DOWN TURN IN EXPLORATION AND FIELD MANAGEMENT DRILLING PROGRAMES WORLD WIDE.
SENIOR DRILLING SUPERVISOR (Consultant)
HORIZON OIL & GAS (HOG) LTD. - Morro Bay, CA - January 1965 to Present Responsibilities
50+ PLUS YEARS DRILLING EXPERIENCE WITH FULL LAND AND OFFSHORE DRILLING CERTIFICATIONS REQUIRED PLUS MANY PERSONAL WORK REFERENCES. OUT OF WORK DUE TO THE OIL PRICE CRASH AND DRILLING DOWN TURN WORLD WIDE. OVER 60 YEARS OLD AND LOOKING FOR WORK ANYWHERE IN THE USA OR INTERNATIONALY, WORLD WIDE. CAN AND WILL RELOCATE IF NECASSARY.
THANK YOU..
GARY FREEMAN
SENIOR DRILLING SUPERVISOR (Consultant)
SENERGY LTD. - Aberdeen, SD - October 2013 to January 2014 Responsibilities
Accepted rig from Chevron Canada, sailed ship over from St Johns New Foundland Canada to the West of Shetlands UK. Drilling exploration subsea well "Handcross 204/18b-B2 in 3,330 ft. water depth for reservoir field appraisal only. 36"/30" conductor set at 250 ft BSB, 13-3/8" csg set at 5830' BRT and 12-1/4" straight hole drilled to +/- 10250 ft. Full LWD logs run in the 12-1/4" hole section with final Schlumberger Wire Line logging program to include FIT and Side Wall Coring samples. The well was then fully P and A'd. The BOP & Riser's pulled, the HP & LP well heads cut off and recoverd. End of project January 2014. SENIOR DRILLING SUPERVISOR (Consultant)
SENERGY NORTH SEA - Aberdeen - October 2013 to January 2014 Accepted rig from Chevron Canada, sailed ship over from St Johns New Foundland Canada to the West of Shetlands UK. Drilling exploration subsea well "Handcross 204/18b-B2 in 3,330 ft. water depth for reservoir field appraisal only. 36"/30" conductor set at 250 ft BSB, 13-3/8" csg set at 5830' BRT and 12-1/4" straight hole drilled to +/- 10250 ft. Full LWD logs run in the 12-1/4" hole section with final Schlumberger Wire Line logging program to include FIT and Side Wall Coring samples. The well was then fully P and A'd. The BOP & Riser's pulled, the HP & LP well heads cut off and recoverd. End of project January 2014. SEPTEMBER 2013 to NOVEMBER
POSITION: SENIOR DRILLING SUPERVISOR (Consultant). OIL COMPANY: AGR ENGINEERING & COOPER ENERGY AUSTRALIA. AREA: OFFSHORE TUNISIA
RIG: GSP JACK UP DRILLING RIG "JUPITER" OFFSHORE TUNISIA. WORK SCOPE: Drilling exploration subsea well HAMMANENT 3ST-1 IN 33m water depth. Pilot hole was drilled to 3437m, then performed a 6" horizontal hole side from 2900m to 3450m. Run DST, flow, clean up & well test at surface for reservoir appraisal.
GENERAL WORK HISTORY .d)
SENIOR DRILLING SUPERVISOR (Consultant)
GALOC OIL COMPANY - AUSTRAILA - July 2013 to September 2013 GALOC PRODUCTION COMPANY AUSTRALIA.
AREA: OFFSHORE CENTRAL PHILIPPENES OFFSHORE THE PALAWAN ISLAND CHAIN RIG: DIAMOND OFFSHORE SEMI-SUBMERSABLE DRILLING RIG "OCEAN PATRIOT" WORK SCOPE: Simultaneously Drilling 2 x long reach horizontal subsea wells G-5 and G-6 in 330m water depth, wells are 30m apart in the GALOC-2 Production field. Plan drilled 2500m horizontal sections, set 5.5" liner, run & set, 4.5" completions with subsea Dril-Quip trees, flow & clean up wells at surface, well testing each reservoir.
SENIOR DRILLING SUPERVISOR (Consultant)
OIL COMPANY - December 2012 to June 2013
OIL COMPANY: PERENCO OIL & GAS Ltd. And EOG UK Ltd. AREA: CENTRAL SOUTHERN NORTH SEA
RIG: ENSCO-80 JACK-UP RIG
WORK SCOPE: TYNE field well T-5/6 side track & re-drill to 22,000 ft. Re-run gas completion. Rig then moved to the INDE Field and repeated same type of work over operations, re-drill and re-completion. Inde Well Completed April the 30th.. Moved rig over to Liverpool Bay in EIS & drilled 1 well with 3 x side track appraisal legs for EOG.
SENIOR DRILLING SUPERVISOR (Consultant)
OIL COMPANY - 2012 to January 2012
AREA: NORTH SEA
RIG: JOHN SHAW SEMI-SUBMERSIBLE RIG
WORK SCOPE: Work in TAQA's Aberdeen office in preparation for extended March drilling campaign. Total 4 well Drilling and Work Over programme in the Corm-A Field. Received John Shaw Rig in West Coast of Scotland, Invergordon Habour. Prepare Rig for drilling campaign. Towed rig out to Pelican field. March, Re-drilled Well W-12. And completed same. Work over Well W-11 and re-complete same with straddle Pkr.
SENIOR DRILLING SUPERVISOR (Consultant)
OIL COMPANY - March 2011 to December 2011
AREA: NORTH SEA
RIG: BORGSTEN DOLPHIN SEMI-SUBMERSIBLE RIG
WORK SCOPE: 3 well Work Over programme in the North Falcon and Pelican Corm-A Fields. Plus 1 x New Drill in the Pelican field (10 mo project completed & rig released) SENIOR DRILL SITE MANAGER (Consultant)
OIL COMPANY - January 2011 to March 2011
AREA: BAKERSFIELD
WORK SCOPE: Drillng shallow lateral oil wells 2500' TVD up to 4000' MD with Rig-579 in the Tejon & Wheeler Ridge Shale Gas Fields.
)
GENERAL WORK HISTORY .d)
SENIOR DRILLING SITE MANAGER (Consultant)
OCTOBERBER - WEST, PENNSYLVANIA, US - 2010 to December 2010 OIL COMPANY: EQUITY PETROLEUM
AREA: PENNSYLVANIA & WEST VIRGINIA
WORK SCOPE: Drilling lateral gas wells in the Marselles Shales using both air with hammer and air rotary fluid fluid rotary drilling in the lateral sections. HP Flex Rig-259. Drilling to 2800 TVD depths and then 2000' lateral sections.
Consultant
OCTOBERBER - London - September 2010 to October 2010 POSITION: Senior Client Rep on Marine Subsea Intervention Vessel "MV SARAH" OIL COMPANY: Representing Enchore & Tullow Oil Companies of London. AREA: NORTH & SOUTH SEA AREAS
WORK SCOPE: Mobilize vessel, Perform top kill P & A work, cut off & recover old well heads to 3m below sea bed, perform clean seabed area surveys. De-mob & De-brief Complete end of operations reports for four well abandonments. Project completed.
DRILLING SUPERVISOR (CONSULTANT)
E-ON RUJRGAS UK Ltd - June 2010 to June 2010
OIL COMPANY: E-ON RUJRGAS UK Ltd.
RIG: TRANSOCEAN LABRADOR JACK-UP
AREA: SOUTHERN NORTH SEA
WORK SCOPE: Drilling TOLMOUNT Field Exploration well # 42/28d-11 (Tight Hole) SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - December 2008 to March 2010
RIG: THISTLE PLATFORM
AREA: NORTH SEA
WORK SCOPE: INSTALLATION and COMMISSIONING OF DRILLING EQUIPMENT ON EXISTING PLATFORM FOR NEW DRILLING CAMPAIGN. SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - April 2006 to December 2008
RIG: PILTUN-B PLATFORM
AREA: SAMSUNG SHIP YARD S.KOREA and SAKHALIN ISLAND RUSSIA. WORK SCOPE: PROJECT DRILLING ENGINEER INSTALLING DRILLING SENIOR DRILLING SUPERVISOR (CONSULTANT)
ANADARKO QATAR ENERGY COMPANY LLC - February 2006 to April 2006 OIL COMPANY: ANADARKO QATAR ENERGY COMPANY LLC
RIG: NOBLE DICK FAVOR (JACK-UP)
AREA: FASHT AL-DIBAL #1 (FAD-1 WELL) BLOCK 13 QATAR WORK SCOPE: Drilling Exploration Oil Well to 10,000 ft. depth (30 deg Inc) to evaluate Arab A, B, C, D, Hanifa zones and Uwainat limestone reservoir
objectives. Perform any well testing as required and P & A as per program.
)
GENERAL WORK HISTORY .d)
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - Shaw - November 2005 to January 2006 RIG: JOHN SHAW (SEMI)
AREA: BENNACHIE WELL 21/15a-H
WORK SCOPE: Drilling Exploration Well in block #21/15a +/- 12,000 ft. depth into the Fulmar SST Reservoir. Perform well test and P & A as per UKOOA Guidelines. SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - Shaw - September 2005 to September 2005 RIG: JOHN SHAW (SEMI).
AREA: COURAGEOUS WELL 30/2a-5z-y
WORK SCOPE: Drilled first Exploraqtion Well #30/2a- 5. Ran DST and tested same. Cut and retrieved 9-5/8"
& 7" Csg. Plugged back and sidetracked at 3000 ft. Drilled two additional side track wells #5z and 5y from original well bore. P & A well for rig move.
SENIOR DRILLING SUPERVISOR (CONSULTANT)
BRITISH GAS - April 2005 to April 2005
OIL COMPANY: BRITISH GAS
RIG: ENSCO JACK UP RIG-70.
AREA: OFFSHORE HUMBERSIDE U.K.
WORK SCOPE: Sub Sea Work Over in Apollo Field - Kill well, pull Tbg & SS Tree. Re-drill new 4000' Horizontal Well gas sand section from 7" liner window whipstock. Re-complete with 4.5" Weatherford Expandable liner screens. Re-run SS Tree & Production Tbg string then perform well clean up and production testing.
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - January 2005 to February 2005
RIG: ENSCO JACK UP RIG-95.
AREA: OFFSHORE BALOCHISTAN PROVINCE PAKISTAN.
WORK SCOPE: Perform Rig Audit & Inspection in Sharjha Ship Yard. Tow Ensco-95 Rig from Dubai to Pakistani waters for drilling one 13,000 ft. Exploration Well for the National Pakistani Company P.P.L. SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - December 2004 to 2005
RIG: GWDC LAND RIG RIG-110.
AREA: ALI BAYRAMLI AZERBIAJAN, EAST MISHOVDAG FIELD WELL EM-1002. WORK SCOPE: Renovating the GWDC Chinese Land Rig-110 for H.P. work. Drilling H.P. Exploration Well in the East Mishovdag field of Ali Bayramli.
)
GENERAL WORK HISTORY .d)
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - September 2004 to October 2004
RIG: DALMA MR-1 LAND RIG.
AREA: RAJASTHAN INDIA. WORK SCOPE: Drilling, logging, DST testing shallow exploration wells in the North Western Rajasthan region. Wells were either suspended with 7" or 5-1/2" Casing or a Tubing Completion String and Packer were run for later production.
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - August 2004 to August 2004
PLATFORM: THISTLE ALPHA PLATFORM.
AREA: NORTH SEA.
WORK SCOPE: Two Well Workover program using Halliburton Hydraulic Work Over unit. Pull 5" & 7" Tbg Strings, cut & replace bad 9-5/8" csg string. Clean up well and run new completion as a water injection well. SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - October 2003 to July 2004
RIGS: M.B.P.S OIL and GAS DRILLING SERVICES DESERT LAND RIG-23 AND Rig-1. AREA: DALELL FIELD, DESERT INTERIOR, SULTANATE OF OMAN. WORK SCOPE RIG-23: ULTRA SHORT RADIUS WELL (U.S.R.) with 92deg turn out in a 10mtr curve radius using 2.6"OD carbon fiber drill pipe. Section 7" liner at 1600m TVD then drilling 200m to 250m horizontal legs with bare foot reservoir completions.
WORK SCOPE RIG-1: Drilling 1800m vertical pilots, W/L logging then plug back & K/O at 1300m going Horizontal +/- 1700m in the Shuaiba limstone reservoir oil section. Complete wells with 3.5" Tbg inside 7" liner leaving 6-1/8" Reservoir Section barefoot.
DRILLING SUPERVISOR (CONSULTANT)
Well Project - August 2003 to October 2003
OIL COMPANY: TOTAL-FINA-ELF NIGERIA.
RIG: MG HULME JR. SEMISUBMERSIBLE.
AREA: WELL-4 USAN BLOCK OFFSHORE NIGERIA.
WORK SCOPE: DEEP WATER EXPLORATION PROJECT.
Exploration well with multiple testing zones using Halliburton D.S.T. well test. SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - Heather - March 2003 to April 2003
D.N.O.
RIG: KCA RIG - #56 WORKOVER ESP RE-COMPLETIONS.
AREA: (D.N.O.) PLATFORM HEATHER-A BLOCK 2/05 North Sea. WORK SCOPE: WELL H-55 WORKOVER PROGRAMME.
Kill Well, Pull TBG, Isolate Water Zones with straddle & Re-Complete.
)
GENERAL WORK HISTORY .d)
DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - February 2003 to February 2003
RIG: TRANSOCEAN DEEP WATER DISCOVERY DRILL SHIP.
AREA: COTONOU BENIN WEST AFRICA ( "TIGHT HOLE INFO" ). WORK SCOPE: 13,200ft EXPLORATION WELL IN 7258ft WATER DEPTH. ) SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - January 2002 to January 2003
RIGs: JACK-UP's SANTA FE GALAXY, MAERSK GALLANT, NOBLE LYNDA BOSSLER. AREA: PHILLIPS JADE, JUDY, CONOCO ISLAY AND VALKYRIE FIELDS. WORKSCOPE: DRILLED 4 HPHT WELLS ON THE JADE & JUDY PLATFORMS WITH +/- 15,000' TD's / 3,000' HORIZONTAL SECTIONS.
+SNUBING UNIT WORKOVER PERFORMED ON MAIN JUDY PLATFORM. DRILLED ONE EXPORATION WELL EACH IN THE ISLAY AND VALKYRIE SOUTHERN GAS FIELDS USING NOBLE LYNDA BOSSLER JACK-UP SENIOR DRILLING SUPERVISOR (CONSULTANT)
MONTH TOTAL PROJECT - June 2001 to December 2001
OIL COMPANY: HALLIBURTON ALLIANCE WITH MOSS GAS S.A. RIG: SOUTH SEAS DRILLER SOUTH AFRICA (S.S.D.).
AREA: MOSS GAS "EM" DEVELOPMENT FIELD SOUTH AFRICA. WORKSCOPE: COMPLETION & SUBSEA TREE WORK OVER PROJECT. KILL & ISOLATE 3500m EM02P WELL - RECOVER 5-1/2" COMPLETION STRING - RECOVER DAMAGED FMC HORIZANTAL PRODUCTION TREE. ABANDON WELL - DRILL NEW HORIZONTAL WELL 15m FROM EXISTING WELL WITH SATURATION BELL & DIVER ASSISTANCE AT 120 m. RUN PRODUCTION COMPLETION TBG. AND FMC HORIZONTAL TREE - TEST & CLEAN UP WELL - PERFORM SUBSEA PIPE LINE HOOK UP AND TIE IN BACK TO THE F.A. PRODUCTION PLATFORM. - TWO DAY RIG TOW TO CAPE TOWN FOR SATURATION DIVING DECOMPRESSION AND RIG DECOMMISSIONING. SENIOR DRILLING SUPERVISOR (CONSULTANT)
AMERADA HESS U.K. LTD - January 2001 to June 2001
OIL COMPANY: AMERADA HESS U.K. LTD.
RIG: GLOMAR MARINE ADRIATIC VI JACK UP.
AREA: YORK WELL 47/3a-11 (Using Baroids Silica Mud System) WORK SCOPE: YORK FIELD EXPLORATION GAS WELL ON THE BORDER WITH THE BP ROUGH FIELD.
"TIGHT HOLE INFORMATION".
)
GENERAL WORK HISTORY .d)
CONSULTANT
ABERDEEN OFFICE STAFF - November 2000 to December 2000 OIL COMPANY: AMERADA HESS U.K. LTD.
PROJECT: YORK FIELD EXPLORATION GAS WELL 47/3a-K.
WORK SCOPE: HELP WRITE THE DRILLING & TESTING PROGRAMME. PERFORMED OFFSHORE AUDIT & INSPECTION OF NEW RIG.
MADE UP PRE-SPUD LOAD OUT LIST AND ALL EQUIPMENT REQUIREMENTS FOR WELL TO INCLUDE FISHING EQUIPMENT. HELD PRE OPERATIONS AND CO-ORDINATION MEETINGS WITH ALL THE CONTRACTORS & SERVICE COMPANIES. ORDERED, INSPECTED & CHECKED ALL EQUIPMENT FROM SUPPLIERS. HELD MEETINGS WITH VARIOUS BIT SUPPLIERS TO DECIDE THE BEST BIT PROGRAMME & DESIGN OPTIONS BASED ON PREVIOUS FIELD INFORMATION. RIG CONTRACT: GLOMAR MARINE ADRIATIC IV JACK UP. ) SENIOR DRILLING SUPERVISOR (CONSULTANT)
ONE WELL PROJECT ONLY - October 2000 to November 2000 OIL COMPANY: KERR McGEE U.K. Ltd.
RIG: SEDCO 714 SEMISUBMERSIBLE.
AREA: NORTH SEA BIRSE FIELD.
WORK SCOPE: 1 WELL EXPLORATION PROGRAMME WITH MULTIPLE PLANNED SIDE TRACKS FOR OUT REACH DEVELOPMENT OF EXISTING LEADEN BASE FIELD DEVELOPMENT. SENIOR DRILLING AND COMPLETIONS SUPERVISOR
OIL COMPANY - October 1998 to September 2000
AREA: SOUTH AFRICA.
OIL COMPANY: MOSS GAS / HALLIBURTON ALLIANCE SOUTH AFRICA. OPERATOR: DRESSER INDUSTRIES / HALLIBURTON SERVICES. RIGS: "SOUTH SEAS DRILLER" AND OMEGA SEMISUBMERSIBLES. WORK SCOPE: DRILL HORIZONTAL EXPLORATION GAS & EXISTING FIELD DEVELOPMENTS WELLS, DRILLING 3000 - 4000 ft. HORIZONTAL SECTIONS TO +/- 15,000 ft. T.D. RUN COMPLETIONS USING FMC HORIZONTAL TREES AND SUB SEA COMPLETIONS.
DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - Aberdeen - June 1998 to October 1998 RIG: ROWAN DRILLING CO. "GORILLA - 4" (RG-4) JACK UP RIG WORK SCOPE: 6000 ft. HORIZONTAL SECTION WELLS (21,000 ft. T.D.) AREA: JUDY FIELD / NORTH SEA SOUTHERN GAS SECTOR.
DRILLING SUPERVISOR (CONSULTANT)
WELL PROJECT ONLY - February 1998 to June 1998
OIL COMPANY: CONOCO LTD. NIGERIA (LAGOS / PORT HARCOURT). RIG: READING AND BATES "JOHN CUNNINGHAM" SEMISUBMERSIBLE. WORK SCOPE: 5000 ft. WATER DEPTH EXPLORATION OIL/GAS WELL. 15,000 FT. Total Depth. (Suspended for later re-entry). AREA: NIGERIA
)
GENERAL WORK HISTORY .d)
SENIOR DRILLING SUPERVISOR (CONSULTANT)
WELL PROJECT ONLY - January 1998 to February 1998
OIL COMPANY: FOR BRITISH GAS (Operated by G.M.I.S.) RIG: GLOBAL MARINE ADRIATIC (Xl) JACK-UP.
WORK SCOPE: DIRECTIONAL GAS WELL THROUGH MASSIVE SALTS. AREA: SOUTHERN GAS FIELD HUMBERSIDE AREA.
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - June 1997 to December 1997
RIG: SAIPEN DRILLING LAND RIG #118.
WORK SCOPE: 28,000 ft. H.P.H.T. EXPLORATION LAND WELL.
(SUSPENDED @ 22,000 ft. Due to hole Difficulties and earthquake instability) AREA: POTENZA SOUTHERN ITALY / ROME OFFICE.
SENIOR DRILLING SUPERVISOR (CONSULTANT)
OIL COMPANY - Shaw - June 1994 to June 1997
NORTH SEA).
RIGS: SONAT DRILLING "JOHN SHAW", STENA DRILLING "STENA SPEY"AND THE "KANTAN - 4" SEMISUBMERSIBLES,
WORK SCOPE: VARIOUS EXPLORATION WELLS NORTH SEA TO INCLUDE 2 x H.P.H.T. 15,000 - 18,000 ft. WELLS. 8 DIRECTIONAL SUBSEA CLUSTER WELLS FOR THE TELFORD / SCOT FIELD. AREA: CENTRAL / NORTH SEA (Project came in 4 million under budget). Owner of Pig Pen Motorcycle shop
H.O.G - Costa Mesa, CA - June 1993 to June 1994
U.S.A.
SHOP OPERATED DURING THE TIME OF THE OIL INDUSTRIES DOWN TURN. SUBSEA PROJECT ENGINEER / DRILLING SUPERVISOR
TRIDENT LTD. / RANGER OIL - June 1992 to January 1993 COMPANY OPERATOR: TRIDENT LTD. / RANGER OIL (ANGOLA). WORK SCOPE: TIED IN TWO SUBSEA WELLS TO F.P.S.O VESSEL. REFURBISHMENT OF THE OCEANEERING DIVISON OWNED TANKER "OCEAN PROSPECTOR" AS A FLOATING PRODUCTION VESSEL, THEN LEASED TO THE NATIONAL ANGOLAN OIL COMPANY. SUPERVISE PRODUCTION DESIGN, Q.A. AND INSTALLATION OF SUBSEA WELLHEADS, HYDRAULIC CONTROL UNITS AND EMBELICALS.
AREA: INITIAL DESIGN WORK WAS OUT OF OCEANEERING HOUSTON OFFICE WITH FLOW LINE EQUIPMENT FROM MULTIFLEX SHIPPED OUT OF FLORIDA. REFURBISHMENT AND HYDRAULIC CONTORL UNIT INSTALLATION WAS DONE IN CAPE TOWN SOUTH AFRICA. THE MAIN EQUIPMENT SUPPORT BASE WAS RUN FROM POINT NOIR CONGO. FINAL INSTALLATIONTI WAS COMPLETED OFFSHORE ANGOLA.
GENERAL WORK HISTORY Cont.d)
SENIOR DRILLING SUPERVISOR (CONSULTANT)
DAY WELL PROJECT ONLY - October 1991 to January 1992 COMPANY: ULTRAMAR U.K. LTD.
WORK SCOPE: 15,000 FT. GAS EXPLORATION WELL WITH 3 SIDE TRACKS, USING ONLY ONE DRILLING SUPERVISOR FOR THE ENTIRE 90 DAY WELL PROGRAMME WITHOUT RELIEF.
RIG: ROWAN DRILLING COMPANY ROWAN GORILLA ll JACK-UP. AREA: SOUTHERN NORTH SEA GAS SECTOR
SENIOR DRILLING SUPERVISOR (SHELL CONSULTANT)
SHELL U.K. LTD - Halifax - 1985 to 1991
RIGS: JACK UP RIGS AS FOLLOWS
CHARLES ROWAN (ROWAN DRILLING COMPANY)
ROWAN CALIFORNIA (ROWAN DRILLING COMPANY)
GILBERT ROW (ROWAN DRILLING COMPANY)
ROWAN HALIFAX (ROWAN DRILLING COMPANY)
THE GORILLA - 2 (ROWAN DRILLING COMPANY)
THE GORILLA - 4 (ROWAN DRILLING COMPANY)
SHELF DRILLER JACK UP (HOULDER MARINE DRILLING COMPANY) TRIDENT Xl JACK-UP (TRIDENT MARINE DRILLING COMPANY). WORK SCOPE: OIL & GAS EXPLORATION WELLS, FIRST HORIZONTAL WELLS DRILLED FOR SHELL IN THE U.K. SOUTHERN GAS SECTOR, PLATFORM CANTILEVER DRILLING, VARIOUS PLATFORM WORK OVERS AND COMPLETIONS.
HOME TEL./RECORDER
RESIDENCE ADDRESS - Morro Bay, CA - 1985 to 1985
BUSINESS International e-mail Address => ******@*****.**.** Total 48yrs (33yrs Consultant including 14 with Shell) TYPE OPERATIONS: DEEP WATER, SEMI EXPLORATION DRILLING, FIELD DEVELOPMENTS, HORIZONTAL WELLS,
HPHT, SUB SEA COMPLETIONS & WORK OVERS.
TYPE RIGS: SEMI'S, DRILLSHIPS, JACK UP's, ASSORTED LAND RIGS, HELICOPTER JUNGLE RIGS, DESERT RIGS, VARIOUS TYPE
PLATFORMS, NORTH SEA, U.S.A. S.E. ASIA/RUSSIA AREAS. AREAS WORKED: U.S.A., S. EAST ASIA, DUBAI, OMAN, QATAR, INDIA, TUNISIA, PAKISTAN, AZERBIAJAN, AFRICA, ITALY, NORTH SEA OIL/GAS SECTORS. TAIWAN, SOUTH KOREA SAMSUNG SHIP YARD PROJECTS & RUSSIA. OIL INDUSTRY CERTIFICATION (CURRENT TO DATE):
IWCF WELL CONTROL Supervisors Sub Sea (Aberdeen Drilling School), Offshore Survival and Fire Fighting (RGT Aberdeen, Scotland), Yearly Medical (Offshore Medical Doctors - Aberdeen, Scotland) IWCF WELL CONTROL Supervisors Sub Sea (Aberdeen Drilling School), OFFSHORE SURVIVAL / FIRE FIGHTING (RGIT Aberdeen, Scotland), FIRST AID & CPR COURSES (RGIT Aberdeen and Ventura California), H.P.H.T. DRILLING COURSE (Aberdeen Drilling School, Scotland), HORIZONTAL DRILLING SCHOOL (Aberdeen Drilling School), STUCK PIPE COURSE (RANDY SMITH Houston Texas),
HALLIBURTON / LANDMARK DIMS REPORTING SYSTEM (Aberdeen), TEAM BUILDING SAFETY COURSE (RANDY SMITH South Africa), FOCUS SAFETY TRAINING COURSE (Aberdeen, Scotland), STOP SAFETY TRAINING COURSE (LOWESTOFT U.K.),
ENVIROMENTAL AWARNES SAFETY COURSE (Aberdeen, Scotland), SHELL TARGET ZERO SAFETY TRAINING COURSE (Aberdeen), SHELL EPIDORIS U.K. REPORTING SYSTEMS (Aberdeen, Scotland), SHELL OIM's COURSE U.K. (Aberdeen, Scotland),
SHELL RADIO ACTIVE SOURCE HANDLING (Aberdeen, Scotland), SHELL SLINGING & LIFTING AWARNESS (Shell U.K.),
STANDARD OIL CO. CRANE OPERATORS SCHOOL (Ventura California). SUB SEA BOP SYSTEMS (ABB Vetco Gray Ventura, California U.S.A.).
)
GENERAL WORK HISTORY .d)
OIL INDUSTRY CERTIFICATION (CURRENT TO DATE-..d):
PHILLIPS PLATFORM PERMIT TO WORK SYSTEM (Aberdeen, Scotland), BRITISH PHILLIPS DIMS/LANDMARK REPORTING SYSTEM (Aberdeen, Scotland). GAS ENVIROMENTAL CONTAINMENT COURSE.
NEXEN SAFETY BEHAVIOUR COACHING.
TRANSOCEAN THINK SAFETY and COLORS COURSE.
ANADARKO H2S COURSE CERTIFICATION (Doha, Qatar). Assorted Required RUSSIAN FEDERATION Labor Law-Safety Courses. Fire Fighting-BOSET Survival Cert ISSOW PERMIT TO WORK AA and PA LEVEL SEIC RUSSIA and THISTLE NORTH SEA. E-ON Ruhrgas PELETON data base reporting system.
OIL SPILL DECC Level-1 training course completed Sept 7 2010 MIST TRAINING COURSE (Aberdeen Scotland May 2011)
OPEN WELLS REPORTING.
WORK HISTORY, AREAS AND WORK SCOPES:
SENIOR DRILLING SUPERVISOR (SHELL CONSULTANT)
SHELL U.K. LTD - Wells - 1980 to 1985
RIG: DEUTAG DRILLING ON DUNLIN "A" PLATFORM (BRENT FIELD). WORK SCOPE: 30 WELL PLATFORM - DIRECTIONAL DRILLED WELLS BETWEEN 12,000 TO 16,000 FT. WITH 30" CONDUCTOR DRIVING. AREA: NORTH SEA U.K.
CONTRACT SENIOR TOOL PUSHER (STAFF)
SANTA FE DRILLING U.K - 1978 to 1980
RIGS: SHELL AUK PLATFORM AND THISTLE PLATFORM (RIG 111). WORK SCOPE: DRILLING PLATFORM WELLS FOR SHELL AND B.N.O.C. (BRITISH NATIONAL OIL CO.) USING SANTA FE RIGS 111 and 112.
AREA: NORTH SEA U.K.
CONTRACT TOOL PUSHER and RIG MANAGER (STAFF)
POOL OFFSHORE - 1976 to 1978
CALIFORNIA)
WORK SCOPE: PLATFORM DRILLING FOR STANDARD OIL CO. ON THE SANTA BARBARA PLATFORM "HILDA"
AREA: SANTA BARBARA CHANNEL CALIFORNIA U.S.A.
)
GENERAL WORK HISTORY .d)
STAFF
DRILLER and RELIEF TOOL PUSHER - 1975 to 1976
COMPANY: SEDCO DRILLING WITH HOLCAR PETROLEUM COMPANY. RIG: "GUSTO 75" JACK - UP (DUBIA / MIDDLE EAST).
WORK SCOPE: SUB SEA TIE BACKS AND RE-DRILLS FROM EXISTING WELLS IN A 1940's JAPANESE OIL FIELD LEASE, FRAC WORK WITH BIG ORANGE & TESTING WITH HIGH H2s GAS CONCENTRATIONS USING CASCADE BREATHING APPARATUS SYSTEMS. AREA: ( UNITED ARAB EMERATES (U.A.E.) MIDDLE EAST. STAFF
DRILLER - 1974 to 1975
COMPANY: ROB RAY DRILLING COMPANY (DUBIA).
WORK SCOPE: PLATFORM DRILLING WITH TENDER ASSISTED RIG FOR THE DUBIA PETROLIUM & CONOCO OIL COMPANY.
AREA: DUBIA (MIDDLE EAST).
CRANE OPERATOR, ROUSTABOUT, ROUGHNECK, DRILLER
ROB RAY DRILLING COMPANY - SINGAPORE - 1965 to 1975 DERRICKMAN, ASSISTANT DRILLER, WITH THE FOLLOWING COMPANIES.
(SOUTH EAST ASIA OFFSHORE DRILLING COMPANIES):
ZAPATA, GLOBAL MARINE, READING & BATES, WESTERN OFFSHORE, SUN MARINE DRILLING, BASED OUT OF THE SINGAPORE AREA.
(THE FOLLOWING U.S.A. CALIFORNIA BASED LAND RIG DRILLING COMPANIES): BIG "O", MONTGOMERY, CAMAY, KELLOGG, MILLER & YORK, ELMO KNIGHT, GARY DRILLING CO, HAGERSTAD and CLYDE HALL DRILLING, BAKERSFIELD CA. AREAS WORKED: WALNUT CREEK, RIO VISTA, FRESNO, VENTURA, BAKERSFIELD, SANTA BARBARA, LONG BEACH & HUNGTINTON BEACH CALIFORNIA AREAS.
PRE - 1965 NON OIL INDUSTRY POSITIONS HELD:
JULY 1964 - JANUARY 1965:
LINEMAN AND PHONE INSTALLER FOR BELL TELEPHONE CO. HOLLYWOOD DIVISION, CALIFORNIA U.S.A.
MILITARY SERVICE,
STAFF
DRILLER - Singapore - 1972 to 1974
COMPANY: ROB RAY DRILLING (SINGAPORE)
RIG: HOUSTON SYSTEMS HELICOPTER TYPE RIGS
WORK SCOPE: DRILLING DEEP JUNGLE EXPLORATION WELLS FOR GULF OIL AND UNION OIL COMPANIES OUT OF CALIFORNIA. AREA: BORNEO, IRIAN JAYA, SUMATRA SOUTH EAST ASIA. EDUCATION
Business College - Austin, TX
ADDITIONAL INFORMATION
SERVED IN THE US ARMY INFANTRY FROM 1961 TO 1964 WITH HONORABLE DISCHARGE.