PERSONAL DATA
Name : Mukhamad Maskun
Place/Date of Birth : Nganjuk, 07-10-1972
Religion : Moslem
Marital Status : Married, 1 Children
Present Address : Jl. Imam Bonjol, RT18 RW 4
Ds. Kincang Wetan, Kec. Jiwan
Kab. Madiun, East Java, Indonesia 63161
Phone : +623********
HP : +62-821******** /+628**********
E- Mail : *********@*****.**.**/**************@*****.***
Sr. High School (SMA) : MAN Nglawak Kertosono (1988-1991)
Jr. High School (SMP) : MTsN Termas Baron (1985-1988)
Primary School (SD) : SDN Waung Baron (1979-1985)
Applied Position : Shift Supervisor/DCS Panel Operator.
WORKING EXPERIENCES :
1.PT. BADAK NGL BONTANG KALTIM,1996-2005
A.Field Operator – Storage & Loading 1996-1998
Responsible to operate LNG Tank, BOG Compressor, Condensate Stabilizer Plant, Nitrogen Plant, LNG Loading Dock
B.Liaison Field Operator – LPG Plant and Loading Dock LNG/LPG No.2 Commissioning 1999-2001
Responsible to operate Propane, Butane Refrigeration Plant, Propane Reliquefaction Plant and LNG/LPG Loading Dock
C.Senior Field Operator Storage & Loading 2002-2003
Responsible to operate, control the operating condition LNG,LPG Tanks, LNG, LPG BOG Compressor, LNG/LPG Loading Dock, Feed Gas Knock Out Drums, LNG/LPG Blowdown Drums and Flare System, LPG Refrigerant Plant.
D.Senior Officer /DCS Panel Operator 2004-Until August 2005
Responsible to operate DCS Panel to control all LNG/LPG Plants, Feed gas Knock Out Drums, material balance calculation for feed gas consumption and LNG/LPG Production Every day, and as Loading Master at LNG/LPG Shipment.
2.RAS GAS COMPANY LTD, QATAR 2006-2007
Senior Operator Ras Gas Company Ltd,
Support all pre-commissioning and commissioning activities as:
A. Monitoring work progress for train main machine consists of lube oil flushing for compressors.
B. Pipe spool inspections.
C. Line blowing of pipe lines.
D. Witness any hydro/pneumatic test done by contractors/vendors for Plant Management Team (PMT) in conjunction to Mechanical Acceptance Package (MAP).
E. Equipments Accessibility checks mainly on control valves at site.
F. Internal columns and vessels inspections.
G. Equipments Readiness Punch listing.
H. Plant Safety Tour.
I. Liaise with the contractor work supervisor / work leader in task to be executed in regular basis.
J. Conducted safety toolbox talks.
K. Working as onshore 28/28 rotation basis.
Duties and Responsibilities
Operates and handles:
a)Gas Mercury Removal System.
b)Gas Dehydration System.
c)Gas Chilling and Liquefaction System.
d)Refrigeration System ( Mixed, Propane and Nitrogen ).
e)Nitrogen Rejection System.
f)Power Generation and Distribution System.
3. BP. TANGGUH LNG, NOV 2007-2011
Position:
a.DCS Technician, Gas Production Facility and Storage & Loading, 2007 – 2009
b.Lead Technician, 2010-2011
Job Description:
a.Plan & monitor the production process, coordination Start Up / Shut Down: Gas Wells, Pipe line, On Shore receiving facility, Condensate Stabilizer, BOG Compressor, LNG /, Condensate Tanks, Shipping LNG/Condensate.
b.Identify maintenance requirements and organize employee to run the maintenance process.
c.Verify and approve the daily work permits, and ensure that all ongoing works are conforming to the prescribed precautions.
d.Controls the operation of the plant from the control room by supervision of the Control Room Panel Operator and directs actions of the outside operators to ensure continuous safe and efficient operation of the plants
4. SAIPEM CONTRACTING ALGERIA,2012-2014
Position :
Commissioning Supervisor LNG/LPG Plant,2012-2014
Job Description:
a. Coordination all section for Commissioning and Start UP LNG/LPG Plant
a. THE RESPONSIBILITIES INCLUDE:
DCS Technician of Gas production facility & Storage Loading section, all Aspects of Gas Wells, Gas Pipe Lines, On shore receiving facility, Condensate Stabilizer, Boil off Gas Compressor, LNG/Condensate Loading Dock,. Unit LNG and Condensate storage tanks, 1 meter Proving Plant, Refrigerant Storage, Blow Down system (dry & wet flare unit)
b.PRINCIPLE ACCOUNTABILITIES:
Plans, supervises the production and Coordinate Start Up / Shut Down: Gas Wells, Pipe line, On Shore receiving facility, Condensate Stabilizer, BOG Compressor, LNG /, Condensate Tanks, Shipping LNG/Condensate
1.Identifies maintenance requirements and where immediate action is required organizes the necessary personnel to carry out preparation work.
2.Verifies and approves the daily work permits, and ensures that all on-going works are conforming to the prescribed precautions.
3.Controls the operation of the plant from the control room by supervision of the Control Room Panel Operator and directs actions of the outside operators to ensure continuous safe and efficient operation of the plants
5..EXXON MOBILE BOJONEGORO ( AUGUST 2015-JANUARY 2016 )
Process Commissioning
CPF : Central Processing Facilities
-Commissioning and Start up R/O Unit
-Commissioning and Start up Clarifier and water treatment unit
-Degreassing and Chemical cleaning AGRU Unit
6. OPERATION SHUTDOWN SPECIALIST AL HOSN GAS ABU DABI
-Install and remove LOTO system
-Mark up and check list PID
I had experienced pre-commissioning, commissioning, start up new LNG, LPG plant, LNG/LPG tanks, LNG / LPG loading dock, Gas Wells, Pipe lines
Trainings & Courses
1.Dasar Teknik Pengolahan Gas, LAPI ITB – PT. Badak NGL, Bontang, 2002
2.Crash Program Training Operation II, PT. Badak NGL, 1996
3.Centum CS3000 Operation, Yokogawa Electric Corp, BP Tangguh LNG, Papua
4.Operator Certification on Storage & Loading : LPG Tank/Dock-2 Operator, PT. Badak NGL, Bontang
5.Spot Recognition Award, BP Tangguh LNG 2009, Papua
6.Water Survival, Jakarta Offshore Training Center
7.Well Head Control Panel, Weatherford
I hereby confirm that all of the informations mentioned above are true based on my knowledge and experience.