A.S. EL IMAM
Born March **th, **** in Port Said (Egypt)
French - Egyptian National
Married / 2 children
Registered with the Dubai Association of Engineers & Dubai Municipality
French Architectural Society (ordre des architectes) - AIA
e-mail : ******.*****@*****.***
Skype: Sammy.el.imam
Beirut Mobile: +961-*-***-***
https://www.dropbox.com/s/lrk7o4r7c6lttyg/PORTFOLIO%20SAMMY.pptx?dl=0
Objectives
Looking for a managerial and development position in relation with my competence and knowhow, such as taking over a project from the negotiations phases until completion.
EXPERIENCE
27/05/2013 TO 30/04/2015 Dubai/ U.A.E.
LACECO Architecture & Engineering Consultant
Manager of the Dubai Branch
Administrative work
I set up the company following up all the appications process with the Dubai Municipality and the DED until obtaining the qualification of the company to obtain the Unlimited scope of work, enabling us to participate in any project
I selected and interviewed applcants for the positions of electrical / mechanical/structural and architectural positions
Business Development – Contacting potential clients
In charge of the pre-qualification files and contacts with potential developers (EMAAR – FALCON CITY – DAMAC – Majid AL FUTTAIM – AL WASL…)
I was in contact with the Authorities, in order to register our staff and get the approval for several engineers sent from Beirut office
Architectural work
I was in charge of the design and development of the 2 Elementary schools: 1for boys and 1 girls for an area on 3,621m for each school
I was in charge of the conceptual and detailed design of the Grand Mosque with an area of 1,100 m
Preliminary and final design of the administration building
Liaising with the client ( ARAMCO SAPMT team in the completion of the Thuwal project -500 housing compound for a value of Mio $500), I was reviewing the designs with the client and implementing the various building codes either those of Aramco or the IBC whichever was more demanding
Following the program of the project and the different milestones imposed by the client
Ensure all local authorities submissions were monitored to obtain approval
Ensure all designs were in accordance with the relevant standards (Aramco or local standards)
Ensure agreed packages of documentation were completed within agreed deadlines
1/07/2011 To 27/05/2013 Beirut / Lebanon
FRANSABANK SAL
Head Of Engineering Department
Assessment of new locations for the bank presence
Feasibility study of new branches – site visit
Report to the branch management and Presidency
Designing new branches for the bank
Renovating existing branches
Preparing and issuing the BOQ for each project
Preparing the bidding documents for each project selecting the required divisions
Preparing the contract draft and imposing penalties
Managing the design of the new Algiers Headquarter
Reviewing the architectural designs
Assessment of the Headquarter extension consisting of an 11 storey building behind the actual HQ
Liaison with the top management
Management of the ongoing projects with an emphasis on budget and time, keeping a chart on delays and progress.
Contract negociation with contractors
Contract management of all new projects. Helping the staff with contract issues and helping them to solve their problem. Close monitoring of contract clauses
26/04/ 2010 – 10/07/2011 Riyadh/ K.S.A.
Abdulaziz Omran AL OMRAM
SENIOR ARCHITECT & Manager of the Engineering Department
Deriy’a compound:
Client: OGER
concept and design of a 18.000m compound consisting of 3 bedrooms villas – 2 bedrooms villas – G+1 studio building – G+1 one bedroom apartment. Design all the services facilities and the compound layout and landscape.
Site visit and assessment of the location
Liaison with the Deriy’a Municipality for their specifics regulations
Request a soil investigation
Research on water saving and recycling to implement in the project
Liaison with the Oger staff to finalize their requirements (negociation with staff in order to implement their requirements without having an impact on design and cost)
Final architectural designs of the Deriy’a compound.
Liaison with the MEP team for the Deriy’a compound
Issuing the BOQ
Preparing the Standard bidding documents by selecting the relevant divisions
Preparing the relevant site documents (RFI-material submittal-interim payment money- daily reports…etc)
Site Area: 95.000m - Builtup area: 23.230m
Concept design of Al Omran Headquarter:
1.000 m offices building for the company, (ON HOLD)
GFRC Factory
In charge of implementing the local production of a GFRC factory.
Feasibility study, factory layout, concept design, and implementation
Sampling. Creation of a mould and production of samples
Market analysis and business plan for the GFRC fractory
Cost impact
In charge of implementing the local production of a precast element plant. Feasibility study, factory layout, concept and final designs
Layout design of a new compound over 26.000 Sqm.
Consisting into a total of 127 units (60 studios units/32 one bedroom unit/37 two bedrooms units/19 three bedrooms villas all served with 2 substations – 2 generators units – underground water tanks and a club house with in property services of supermarket-laundry…etc)
From 2008 – Till 2009:
MRGroup Architecture and Engineering Services Dubai / U.A.E
SENIOR PROJECT MANAGER & General Manager of Abu Dhabi Office
Gonio Paradise Beach:
A G+32 storey building in Georgia for RAKEEN.
Pre-concept meetings with RAKEEN
Contacting local authorities in Georgia for the building regulations
Selecting the geo-technical consultant for the soil investigation
Concept and final design of the project
Preparing the architectural BOQ
Issuing the standard bidding documents and the procurement of works (bank guarantee-performance security-letter of acceptance)
Client : RAKEEN - Site Area: 4012 m - Builtup area: 80.154m - Value: US$ Mio 150
Metra Computer Headquarters and Warehouse Jabal Ali Free zone
A G+1 headquarter of 1950 m and a warehouse of 4,000 m .
Pre-concept meeting with client and checking on his various needs negociation about their requirements and their impact on the design and cost
Close contact with JAFZA authorities for the implementation of the Green buildings (LEEDS) regulations and obtaining the NOC
Negociation with Al Zamil for the design and study of the metallic structure of the warehouse
In charge of the complete design from concept to tender. Applying with the different authorities of the NOC and final building permit.
Preparing the architectural BOQ
Issuing the tender documents and various divisions related to this project
Preparing and submitting the various site documents
Weekly site visits and problem solving
Contract management
Cost management
Jamjoom joinery Ras Al Khaima
Various meeting with the client to assess his needs
Research on the various type of machines needed
Contact with the RAK authorities solving several problems linked to power supply
In charge of the whole tender design for the first stage of the joinery.
Concept of the second stage consisting into 2 four storeys building for the workers, the Headquarter and the recreational areas with all the circulations facilities
Responsible also for the study and layout of the machinery, and different component of the joinery.
Finalizing the metallic structure and calculations with Al Zamil for the NOC
Preparing the architectural BOQ
Preparing and issuing the tender documents with the various divisions
Issuing the standard bidding documents and the procurement of works (bank guarantee-performance security-letter of acceptance) in liaison with the client requirements
Concept and design of the Jamjoom villa/Marzouqi villa/ Hammadi villa/Abdullah Mustafa villa, from concept to Tender documents
Concept and design of the Atrium villas. Mirfa / Abu Dhabi
A compound of 150 villas along the coast situated in the MIRFA Hotel 150 kms from Abu Dhabi
Weekly visit to the site to implement the resort
Extension of the MIRFA hotel
Extensive contacts with the client and his key staff to finalize the designs and layout
Client: Private - Site area: 149.000m - Builtup area : 51.000m
Concept and design of the Deerfield Town Square Bahia/Abu Dhabi
consisting in a 300.000m shopping mall and a twin tower of 25 storeys each
Liaison with the overseas consultants (Talbot/Petroff) during the whole stage of the concept,submitting the concept and negociating with them about any modification required to avoid changes in the architectural concept and cost
Checking on the project circulation inside the mall and outside (roads and link with the various roads to and from the project).Liaison with the authorities in order to implement the right integration
Weekly meeting with the client
Contacts with Abu Dhabi municipality regarding the air safety procedures linked to the AD airport proximity
Animated presentation to the client of the project in collaboration with our ID department
Involved in the implementation of the Carrefour specs
Involved in the negotiations of the various retail zones and safety issues between the architectural constraints and the client requirements
Solving several structural issues due to the architectural constraints
Material selection
Selecting and managing the site team of 16 peoples (including site architect-electro mechanical engineer-document controller…etc)
Involved in the selection of the various contractors
Preparing the architectural BOQ and the site documents (RFI-monthly payment requests..etc)
Issuing the tender documents with the various divisions
Preparing the standard bidding documents and the bank guarantees
Site visits and problem solving
Checking of the various architectural Shop Drawings
Contract management (very involved in the contract issue regarding submissions, duties, variations requests…etc) Keeping a chart with all progress and delays
Cost management very concerned about cost management and any related request which could have an impact on budget or consultancy costs, and delays
Client: Private - Site Area: 96.611m - Builtup area: 55.501 m - Value : US$ Mio 275
2007-2008: Arabian Gulf Furniture Co. Ltd – Riyadh (K.S.A.)
Executive Manager
Control of the good standings of Gaby show rooms
Management of the show rooms including, sales, stocks and communication
Quality Control of the goods
Prospecting of the market namely Fawaz Al Hokair for the Ritz Carlton and the Sheraton hotel in Riyad
Participating in the hotel competition for Ritz Carlton and Sheraton
Business Development in the local Market.
Designing and executing several palaces for local clients
Issuing the BOQ and tender documents
Designing and Follow-up of the well execution of local projects.
Negotiating with different suppliers for the execution of the projects
Site visits
Preparing the Shop Drawings
Concept and design the projects (namely for HH sheikh Nasser Al Thani villa and Sheikh Bakr and Sheikha Bakr villas and majlis
Material and furniture selection
Worked on the ID for the Hotel Safir in Doha for Sheikh Mohamad Al Thani
Participated in the competition for the Qatar airways hotel in Doha
Participated in the project for the Entertainment city for Sheikh Mohamad Al Thani
Contacts with the Ben Laden Group to obtain projects as consultants
1993-2007 : EL IMAM, Beirut (LEBANON)
ARCHITECT
Participating in several tenders for the interior decoration of Hotels (lobby level of Intercontinental in Riyadh – KSA) and furnished appartments.
Interior Design for an apartment in Adma
Architectural design and tender documents of a villa in Adma
Contacts to renew and operate 5* hotels in Beirut, namely the Phoenicia and the Carlton Hotel for Hyatt Regency and Nova Park
Extensive visits to the Gulf in search of new projects
Renovation of a private building in Maarad Street (Solidere)
ID for a restaurant in Maarad street
Prestudy for implementing a vacation village on the Egyptian Red Sea in 2000
The scope of this project was to implement a high end resort (town) linked with the western region of Saudi Arabia in order to take a big share of the tourism from this region, and to offer the same services Bahrain or Dubai are offering.
Contact with the Egyptian authorities to find the right location
Site visits to the Red Sea in the area of Elba national reserve
Prepared a brief explaining the project and it’s economic impact (stressed on the link between KSA and this resort and the advantages for the region)
Contact with the ministry of Tourism to get their support
Contact with local banks and Foreign banks for the financing of the project
Prepared a basic layout showing the village (roads – airport – hydrofoil port – casinos – residential and commercial areas…etc)
AL GHURAIR Polo Farm Dubai / UAE
Put-up a small team of one structural engineer and MEP engineer
Assessment of the existing architectural-structural and MEP design
Designing the farm with new criteria imposed by the owner
Reviewing and issuing new structural and MEP designs
Liaison with the decorator to maintain the approved proposals
Issuing the BOQ and the new tender documents based on the new revised design
Participated on several ID projects namely the Vendome Intercontinental
Concept Design of an office building in Doha consisting of 5 storeys office with a central atrium
Concept design of a residential building in Doha
1990-1993 : VECTRAL S.A., Bischwiller (FRANCE)
Architectural Project Manager
Project Manager- in charge of several projects among which the restructuring of several owned buildings in the old city of Strasbourg.
Rehabilitating several classified building in the old city of Strasbourg to meet the new standard of insulation and energy saving while maintaining their former aspect.
Searching for the original and traditional design of the buildings
Definition of the client request (conception, material selection, furniture, colours…etc).
Preparing the pre qualification file
Submission to the authorities for approval
Negociation with the competent authorities for the authorizations
Material selection
Preparing and issuing the BOQ and tender documents
Contractor selection
Site visits
Major rehabilitations of several classified buildings
1980-1989 : EL IMAM, Paris (FRANCE)
Architect. Privately owned company
Prestudy and concept design of a High End Summer resort in Draguignan (above Saint Tropez). Concept design of a resort covering an area of 380.000 Sqm consisting of luxury and exclusive villas (all different) and a club house and horse riding club.
Preparing the concept and all circulation
Participating in large decoration projects and architectural projects :
Remodelling an old pre-war house
Commercial buildings
Worked on the Nova Park Hotel in Paris
Implemented a water pump in Mauritania working on SOLAR ENERGY
Several private projects in West Africa ( 2 office buildings in Mali/ / 2 villas of 600 Sqm each in Benin/Nigeria..etc)
Set up of the projects upon sketches, relation with key customers,contacts with the French department of architecture. Preparing the sketches for the client and from there starting the concept and final designs
Creating the presentation files, and brochures for the clients (Plans/Elevations/Sections/Perspectives and details plans). Getting approval from the authorities for the buildings permits. Follow up the construction with weekly visits to the site.
Several private projects in France specially in remodeling old country houses, among them an old Windmill turned into a house for a private client
Several private projects of villas for private clients in the south of France: 4 villas in MOUGINS each one on a property covering 10.000 Sqm of land, respecting the Mediterranean style.
SKILLS
Hard worker – Organized – Team leader – Motivated – Good communication skills – Achiever– Team player – Ability to work under pressure
STUDIES & LANGUAGES
1974-1980 : Ecole Nationale Superieure de Paris Lavillette, Paris (FRANCE)
(previously UP#6)
Architecte D.P.L.G. (Master degree)
Made my intership with MBA (Marcel Breuer Architectes) in Paris during my whole 7 years of studies
Resident architect on the Hyatt Hotel site in Nice
Languages : French, italian, English and arabic : fluent.
Computer skills : Good knowledge of Microsoft office, Excell,AutoCad,Microsoft Office Project,, Archicad (beginner), Revit (intermediate), Autocad,3D Max, Photoshop
Interest and hobbies
Tennis, scuba diving, chess, reading.
AFFILIATIONS
French Board of Architects
UAE Society of Engineers
AIA