TAMILAZHAGAN KANDHAVEL
Mobile: +974-****-****, +91-999**-*****
E-Mail: *************@*****.***
NOC: Available with current sponsor
A result oriented professional with over 7 years in the field of waste Management and Waste to Energy and Effluent Treatment Sector in Oil /Gas Operating Plants and industrial city’s environment
Skill Set
Experience of administrative and contractual Waste Handling Services is very essential. The Team Lead should also have thorough knowledge of Waste Handling requirement in large Oil /Gas Operating Plants
Highly qualified, competent and well versed in all aspects of Waste Handling services having good experience in LNG installations plants and Petrochemical Plants.
Planning and developing knowledge of integrated solid waste management in Laboratory analytical methods for incinerator & landfill and AFR technology in community area and Industrial area
Well aware about Hazardous and non-hazardous Industry Standards sites and assess ongoing operations, monitoring, taking corrective actions and closing industrial waste management sites.
Sound Knowledge of Planning for integrated solid waste management in Oil and gas industrial area and community
Sound Knowledge of safety aspects of Working in a LNG plant industry like PTW, JSA, H2S, defensive driving etc...
Developing the logistics network for ensuring seamless, cost-effective movement of consignment and timely delivery of orders
Monitoring the fleet operations by ensuring on-time delivery & analyzing measures to control to variation vehicle like Skip loader and Ro-Ro loader and Sewage Tanker operations
Efficiently managing a team of drivers and vehicles. Responsible for all of the dispatching, routing, and tracking of delivery vehicles. Dispatching complex and oversized goods to national destinations
Waste transportation analyzes and develops plans to improve the transportation department’s budget to purchase new vehicles and equipment as well as discuss and consent to contracts with various suppliers
Full understanding of interstitial Environmental policy and safety policy of waste transport operational systems.
Creating MIS reports & other statements with a view to apprise management of process operations
Assess the existing or potential environmental impact of land use projects on air, water, and land.
Coordinating with a team of 10 members for Preparation of Detail Engineering Documentation includes Detailed Project Report (DPR) for Waste Management
Understanding of compliance issues and statutory regulations such Health & Safety
Compliances with the State’s Environmental Laws & Regulations for Refinery.
Identifying, developing & maintaining vendor base for obtaining timely procurement of materials at favorable terms
Preparing purchase schedules for procurement of materials and raw materials to ensure smooth execution of projects
Developing quality vendor/supplier base for effective procurement of materials with Auditing to International Standards
Professional Experience
BIN ARBAID TRANSPORTATION & EQUIPMENT WLL. OPERATION OFFICER FROM November 2014 TO TILL NOW IN QATAR
Highlights
Ensure the Optimization all the resources and enhance the efficiency of the supply organization
Achieving savings of up to 18% operations cost through the implemented of trailer service, and developing a cost administration and control system in internal operations company module
Develop policies, procedures and programs related to the Waste Management operation in compliance
Maintained highest quality standards, ensured safe working practices and care for environment through total compliance with the guidelines settled up in Company Quality, Health & safety and Environment
Played a key role in leading group of people
Member of Senior Management Team which is responsible for implementing client initiatives, developing cost saving strategies and creating best practices and key performance indicators for national account
Instrumental in finding gaps in the operations through management safety visit in order to implement corrective and preventive action plan for the gaps
Implementing and maintaining the IMS Manual, procedures and work instructions
Personally responsible for the establishment, recruitment and management of the Qatar Municipality project
Strong team-building with the ability to initiate and model positive change
Directly reporting to Division Manager and General Manager
Monthly prepare the CMMS to report cost and KPI performance report to management.
EXNORA GREEN PAMMAL (EGP). PROJECT COORDINATOR, March 2011 TO September 2014 IN CHENNAI, TAMIL NADU
Highlights
Waste management officers organize and manage waste disposal, collection and recycling facilities. They may also be responsible for waste treatment and street cleaning operations. Some posts combine waste management and recycling functions, while others split them into separate jobs
Assisting with the development and implementation of new waste disposal technologies.
Monitoring the quality and performance of waste services, including contract management of external providers.
The Investigating and following up claims of the illegal dumping of waste and working with other waste regulation enforcement staff.
Make sure safety control measures are implemented and monitored
Plans, directs, and reviews the work of management staff engaged in day-to-day operation activities in assigned areas of responsibility.
Directly reporting to managing director and director
Conducted awareness and training program to employees in other departments
Monitoring the Waste to energy process like compost, briquettes and pyrolysis
Administrative over all branch office
Projects Details
Client : QATAR STEEL
Position : Team leader - Operations
Period : From July, 2016 to till
Project : Removal and disposal for all type of waste from Qatar Steel office and plant premises at
Mesaieed Industrial City
Lead and motivate the Contract team to maximize the team effectiveness and productivity, ensuring time, cost and quality measures are achieved.
Coordinate the documentation required to label, move, track, and report waste and waste initiatives
Evaluate waste management options and apply a waste hierarchy model in order to reduce, reuse, recycle, recover, and dispose of waste material
Project budget preparation and administration, including determining financial methods, procedures, and costs pertaining to environmental compliance and waste management services.
Provide waste management training to clients and staff.
Maintained highest quality standards, ensured safe working practices and care for environment through total compliance with the guidelines settled up in Company Quality, Health & safety and Environment
Participate in auditing processes, including approvals, water monitoring reports, engineering designs, and contingency planning
Client : ORYX GTL – Joint Venture of Qatar Petroleum
Position : Environmental Supervisor.
Period : From December, 2014 to November 2015
Project : EPIC of OBL Facility to Gasal LIN Storage Facilities at Ras Laffan.
Conduct in house environmental impact assessments.
Ensure that environmental management system requirements are implemented and maintained and follow up on all aspects requiring legal compliance.
Assist with ISO 14001 system and process audits & handling proper waste management systems
Assist with the management of environmental rehabilitation projects and contractor management.
Compliances with the State’s Environmental Laws & Regulations for Refinery.
Assess the existing or potential environmental impact of land use projects on air, water, and land.
Developed site-specific health and safety protocols, such as spill contingency plans and methods.
Client : Japan International Cooperation Agency (JICA)
Position : Environmental Advisor.
Period : From September, 2013 to March 2014
Project : Chennai-Bangalore Industrial Corridor (CBIC)
Analysis the two state policy and collect waste generation date from project cover corporation and municipality
Cordiant to JICA team and make the project oriented DPR and Reports
Cordiant two state government officials (Pollution Control Board) to collect the project oriented date
Existing waste processing plant site visit with internal team & monthly tour with client representatives.
Full understanding of Project Environmental policy and two state environmental policy
Analysis of a Proposed incinerator and Landfill interstitial and solid waste based landfill capacity of project waste management
collect the various proposals and cost analysis report
Client : S S Lootha group
Position : Project Engineer
Period : March 2013 to April 2013
Project : waste to energy bio-methanol plant pipeline from Dubai to Egypt
Preparation of Energy required to maintain Digester temperature calculation for 3000 & 6000Cu.m
Design and Development of Input Feed stocks for UASB and CSTR and horizontal biogas plant
Knowledge for water and wastewater, different Indian agricultural feed stocks for biogas potential and petrochemical based additives
Academic Qualification
EPC Proposal, Data sheets for Equipment/Instruments, Process Flow Drawing (PFD, Bill of Quantities (BOQ), and Total Cost Estimation for Project
Environment Inspection & IMS Internal Auditor Course in Enertech Qatar
MBA from Alagappa university in 2011
BCA from periyar university in 2009
Higher Secondary Certificate and SSLC from Government Higher Secondary School, Gurusamipalayam
Computer Proficiency & Training
Packages : MS Office
ERP Packages : SAP, JD Edwards and SICLO
Online RCRA Training Hazardous Training
Online Energy Technology, Economics and Policy Training
Working knowledge of IMS-RO System designing
Working knowledge of Statistical Packages for Social Sciences (SPSS)
Working knowledge of HELP Landfill Model
Personal Details
Date of birth : 01.06.1989
Nationality : Indian
Marital Status : Single
Notice period : 3 Month
Languages known : Tamil, English, Hindi, Malayalam, Arabic
Passport Number : J9468894
Driving license : LMV- India & Qatar
Permanent Address : 187/ Ramilinaga Nagar, Gurusamipalayam
Rasipuram T.K, Namakkal D.T- 637403, Tamil Nadu
Residential Address : P.O. Box 60072, Al Khor - Qatar
I hereby declare that all the information provided above is true to the best of my knowledge
(TAMILAZHAGAN)