Post Job Free
Sign in

Construction Project

Location:
United States
Posted:
February 02, 2017

Contact this candidate

Resume:

TIMOTHY P. MILONE, NICET II

Senior Construction Inspector

*************@*****.***

203-***-****

Years of Inspection Experience: 6

Education

B.S., Civil Engineering Technology, Wentworth Institute of Technology, Senior Classman

Professional Registrations

National Institute of Certification in Engineering Technologies, Level II

Occupational Health and Safety Administration, 10hr Certification

APNGA Portable Nuclear Gauge Safety & U.S. D.O.T. Hazmat Certification

Licensed Amtrak Contractor

American Concrete Institute, Concrete Field Testing Technician - Grade I

Professional Affiliations

American Society of Civil Engineers

Connecticut Association of Land Surveyors

Key Qualifications

Six years of construction inspection experience on major transportation and infrastructure projects. Senior Construction Inspector for Jacobs Engineering Group in Association with Parons for the Metropolitan District Commission - Wet Weather Expansion Project - 2012-21– Wet Weather Treatment Facilities in East Hartford, CT. Transportation Inspector III for Bridge Rehabilitation and Replacement of DeGarmo Road Bridge in Poughkeepsie, NY. Chief Construction inspector for the Contaminated Soils and Water Management Contract as part of the multi-modal New Haven Harbor Crossing Corridor Improvement Program. Taken part in rubbilization, paving, and drainage improvements of Route 2 in Glastonbury, CT for Phase I & II and have provided civil engineering, construction inspection, and land surveying services for multiple companies throughout the New England area since 1997.

Jacobs Engineering Group 2016-Present

Senior Construction Inspector

The Metropolitan District Commission

Wet Weather Expansion Project - 2012-21– Wet Weather Treatment Facilities

East Hartford, CT

Steel H-Pile Installation

Steel Spliced H-Pile Installation

Sheeting Installation

Daily Reports IDR

Review Contract Submittals and RFI’s

Construction Observation and Quality Assurance

Coordinating Contractor Site Activities among multiple Contractors

Coordinating Contractor work with regards to Airport Restrictions and shutdown periods

Pile Logs

Review updates to Specs and Drawings

Progress Documentation

Welding Inspection (Splices, Blocks, Cover Plates)

Activity ID Tracking IDR

Photo Documentation

Multivista

Pipe Testing Reports

CDM Smith – Poughkeepsie, New York 2016-2016

Transportation Inspector III

CR-43 DeGarmo Road Bridges (1 Span L-43 & 2 Span PO-17X) Rehabilitation/Replacement- Poughkeepsie, NY

Appia

Monthly Estimates

Daily Inspection Reports

Project Calculations

Field Measurements

Field Inspections

Job Site Safety Inspections

Work Zone Traffic Control

Approve HP Concrete Testing

Approve Select Structural Fill/Embankment/Subbase Compaction Testing

Supervise Contractor

Project Meetings/Meeting Minutes

NY DOT Specifications/Project Specifications

Review Project Plans/Shop Drawings

Work closely with County, Engineers, and Contractor

Assess and solve project related problems

Verify Daily Attendance/Hours/Equipment of Contractor and Sub Contractor

Other Aspects include but not limited to:

Punch List Items, Road Milling/Paving, Embankment Calculations, Pile Installation, Box Beam Inspection/Approval, Sheeting Installation, Superstructure Slab, Clearing and Grubbing, Excavation and Disposal, Select Structural Fill compaction, Heavy Stone Fill placement, GeoTextile Separation, Structural Drain, Subbase compaction, Check Dams, Approach Slab, Sleeper Slab, Turf Establishment.

AI Engineers – Middletown, Connecticut 2015- 2015

Construction Inspector

Red Horse Hill Road - Sharon, CT.

Drainage improvements

Test Pits

Emergency weather related repairs of road.

Relocation of electric line on back slope of site.

Place rip rap and swales where needed.

Capping of conduit where needed.

Lowering of conduit where needed.

Fix all drainage pipes.

Insert plunge pools.

Placed silt fence and hay bales where needed.

Maintained site while work was being completed.

Weekly progress meeting with AI Engineers, PURA, Eversource, and Charter Oak.

Survey for project.

Design work on AutoCAD 2015 for project.

Regular communication with Charter Oak, the residents, and Eversource.

Dewberry – New Haven, Connecticut 2014-2015

Construction Inspector

Phase I & II of the Route 2 Project in Glastonbury involving rubbilization, paving, and drainage improvements.

Other aspects include:

-Inspect construction operations according to CT DOT specifications

-SiteManager - Daily Work Reports

-Payment Calculations

-Identifying and solve project related problems

-Work Zone Traffic Control

Parsons Brinkerhoff – New Haven, Connecticut 2013-2014 Chief Construction Inspector

I-95 New Haven Harbor Crossing Corridor Improvement Program, New Haven, Connecticut: provided construction inspection services for this $10 Million Connecticut Department of Transportation (CTDOT) CSM-2 project. Specific duties include:

Performed construction observation and report preparation for CSM-2 Contract as part of Q-Bridge construction in New Haven, CT. Signed and documented Daily work reports for Connecticut Department of Transportation submitted by the contractor. Utilized Site Manager Program. Approved and compiled Truck logs for removal of Controlled Materials, Hazardous Material, Railroad Ties, and Sediments from AWSA and WWSA. Approved and Signed daily job tickets from contractor. Performed Weekly Environmental inspections of RSA, WWSA, and AWSA and created detailed Environmental Reports for DEEP, CTDOT, and PB. Performed Equipment calculations and created monthly cost estimates using site manager. MAT-100 forms for testing of materials. Conducted Field Measurements. Approved Certified Payroll from Contractor. Created Daily work reports. Worked directly with Resident Engineer, Contractor, Department of Energy and Environmental Protection, and CT Department of Transportation on all CSM related issues. Performed monthly Labor Wage checks of payroll. Created Transmittal for weekly Environmental Reports using Contract Manager. Performed construction observations and report preparation for P&W Railroad installation. Approved CON-40's for P&W Railroad project.

Milone & MacBroom, Inc. – Cheshire, Connecticut 2010-2013 Construction Inspector

Performed construction observation and report preparation for site development and sanitary sewer installation projects as part of Q-Bridge construction in downtown New Haven, CT. Signed and documented detailed progress reports for Water Pollution Control Authority (WPCA). (Project Cost: $60M)

Performed construction observation and report preparation for site development of Rentschler Field parking (Uconn). (Project Cost: $7.5M)

Performed construction observation and report preparation for site development of Newington Athletic fields, Newington, CT.

Performed construction observation and report preparation for site development of Bristol High School, Bristol, CT.

CCR Associates – Quincy, Massachusetts 2009-2010

Land Surveyor

Performed boundary and topographic surveys, construction stake-out, and as-built surveys utilizing Leica & Trimble Total Stations, and survey grade GPS for MASS Highway related projects. Projects included residential, commercial, industrial, institutional, and governmental.

Performed plotting and drafting of data collector information onto Softdesk 8.

Performed plot plans, property line stake-out, sub-division, and topography/existing conditions surveys.

Verne T. Porter, PLS – Newton, Massachusetts 2008-2009

Engineering Technician & Land Surveyor

Performed boundary and topographic surveys, construction stake-out, and as-built surveys utilizing Leica & Trimble Total Stations, and survey grade GPS for related projects. Projects included residential, commercial, industrial, institutional, and governmental.

Performed plotting and drafting of data collector information onto Softdesk 8.

Compiled information from town and state for application in base maps design for properties in Boston and the greater Boston Areas.

Prepared base maps, design plans, and quantity estimates utilizing Softdesk 8.

Performed plot plans, property line stake-out, sub-division, and topography/existing conditions surveys.

Milone & MacBroom, Inc. – Cheshire, Connecticut 2006-2008 Engineering Technician

Performed CAD mapping and technician support on state and federally funded roadway widening, reconstruction and signalization projects in urban environment.

Coordinated and observed subsurface drilling program for 1.6 mile greenway design project.

Conducted utility outreach and compiled utility mapping for incorporation into design plans on 2.7 mile roadway reconstruction project for state funded local roadway improvement project.

Provided various support tasks to team of civil engineers on roadway and site development projects.

Conducted field measurements and traffic counts.

Prepared base maps, design plans, and quantity estimates utilizing AutoCAD 2012.

Land Surveyor 2003-2006

Performed boundary and topographic surveys, construction stake-out, and as-built surveys utilizing Leica & Trimble S6 Robotic Total Station, and survey grade GPS. Projects included residential, commercial, industrial, institutional, and governmental.

Performed plotting and drafting from data collector information to Softdesk 8.

Performed plot plans, property line stake-out, sub-division, and topography/existing conditions surveys.

AutoCAD Technician 1997-2001

Provided various support tasks to team of civil engineers on roadway and site development projects.

Conducted field measurements and traffic counts.

Prepared base maps, design plans, and quantity estimates utilizing Softdesk 8.



Contact this candidate