Team Leader / Director

Location:
Epsom, SRY, United Kingdom
Posted:
February 03, 2017

Contact this candidate

Original resume on Jobvertise

Resume:

Name: Pramod Agrawal ?Address: ** Coopers Drive, Dartford, Kent DA2 7WS

Email: acym1s@r.postjobfree.com tel. mob. 079******** / 075******** (UK)

Date of birth: 5 August 1947 ?Nationality: British ?Status: Married ?

Qualifications: PhD - Electrical Engineering

MBA (Marketing)

ME (Electrical Meas. Inst.)

BE (Electrical)

Chartered Engineer ?Computer skills: MS Word, Excel, Power Point, Internet,

Email ?

Experience (40 years - Railroad related)

March 2014 - present Parsons Brinckerhoff India / DFCC, Delhi, India

Team Leader: For the bid evaluation of the 350km long Eastern Freight

Corridor Project from Khurja to Kanpur for 2X 25kV AC 50Hz Electrification,

Signalling, Telecommunication and associated works of Double Track Railway

Lines.

My accountabilities involves: giving clarifications to the queries by the

bidders during pre -bid conference, to update the System Bid Document in

accordance to the queries and their clarifications from the bidders and to

evaluate offers submitted by the bidders & submit Evaluation Report.

Jun. 2010 - Feb. 2014 Scott Wilson, UK / Ministry of Railway, Saudi

Arabia

Senior Consultant / Advisor: For the bid evaluation and design &

construction supervision of the 444km long High Speed Rail Project from

Mecca to Medina via Jeddah for 2X25KV AC 50Hz Electrification, Signalling,

Telecommunication and associated works of Double Track Railway Lines.

My accountabilities involves: giving clarifications to the queries by the

bidders during pre -bid conference, to update the System Bid Document in

accordance to the queries and their clarifications from the bidders and to

evaluate offers submitted by the bidders & submit Evaluation Report.

Sep. 2008 - May 2010 Ministry Of Railways, China / Poyry Ltd, Bangkok

(Thailand)

Senior Consultant / Team Leader: For the supervision of the Electrification

works (Core / Systems) with the Ministry of Railway, China for the 550km

long Zhengzhou - Xian High Speed Rail Project dealing with the Stakeholders

/ Partners / Consultants / Client / Contractors. This includes project

control, technical review & discussion, to attend supervisor / contractors

meeting as and when required, review contract documents, to follow up

progress and identify critical activities, to review quality / surveillance

aspects, to review safety / health / hazard aspects, to review budget /

trends, system / integration co-ordinator for various components: rolling

stock, traction power, signalling (ATC / IXL) & controls, communication,

catenary systems. The signalling includes track bed with earthing bars,

earthing cables, signalling cables layout, emc interference, signalling

power supply etc.

Oct. 2006 - Mar. 2008 Jacobs, Rail Consultancy Division, London

Senior Project Manager / Technical Director: successfully delivered a

Network Rail design based multi-disciplinary consultancy project for the

Stratford Station Platform Loop Extension and North London Line Upgrade

projects sponsored by Transport for London and Olympic Development

Authority with in time and well with in budget involving bridge, permanent

way, overhead line, civil, drainage, signalling, communication, electrical

power and other disciplines. Due to upgrade of electrified and non-

electrified lines, meeting time table requrements, removal of speed

restrictions require modifications / replacement of existing fringe boxes,

signalling control rooms, plateform signalling, signalling cable,

signalling power supply system, emc requirements, changes from existing 2

aspect to 3/4 aspect signalling system.

As Director responsible for both line management and office management

associated with the rail team, successful achievement of the targets

established for the office within the Rail Business Plan. This includes the

management of project financial performance, budgeting and invoicing. In

addition to meeting the objectives of the business plan, the responsibility

was to actively support the company's values and contribute in the

collective objectives of the company.

The key elements of the role are summarised below;

Business Excellence: 1. Contribute towards the company business excellence

model through the adoption of the company values, 2. Assist in the

development of a robust business plan, 3. Engage with and support other

business units for mutual benefit.

Business Development: 1. Develop and implement a robust client relationship

management programme for the Rail group, 2. Management for principal

clients to the Business Unit in the Leadership & Team Working: able to

demonstrate effective team working to maximise the team's potential; strong

leadership skills through the motivation of staff delegating both

responsibilities and accountabilities whilst maintaining overall control,

empower and encourage staff at all levels; act with professional maturity,

resolving differences and creating open communication lines; display

flexibility, diligence and dedication.

Business Delivery: understand and apply effective project management

principles; manage business risk and working capital; display contract

awareness and dispute management skills.

Staff Retention & Recruitment: active in the recruitment and retention of

staff.

Technical Excellence: demonstrate technical expertise in the areas of

engineering; encourage knowledge sharing; responsible for overall technical

control of projects and act as technical ambassador for the Business Unit

where appropriate.

Health & Safety: ensure that health & safety awareness and training is

maintained for self and team to the appropriate levels; actively encourage

the dissemination of best practice and lead by example in health & safety

matters.

Key Activities: client liaison, bid management and tendering, project

management, commercial management, team development, line management of

staff, business planning, management reporting, financial performance

review & analysis, knowledge sharing and technical presentations,

production of outline and detailed design solutions, report writing &

checking, supervision of site work

July. 2006 - Sep. 2006 Ultra Electronics Ltd (Network Rail

Project, London)

Design Co-ordinator / Project Management / Consultant for Ashford Depot,

Network Rail project (Stratford Temple Mill Project). The responsibilities

involve close coordination with: Fitzpatrick Ltd / Electrification

Consultants / Network Rail Project Management Team and asset Engineers/

manufacturers / suppliers: AC Housing / DC Housing / Transformer Rectifier

/ AC Switchboard / DC Switchboard / LV AC Changeover Board / Bonding Device

/ Cabling & Earthing / SCADA / Test Track 25kV AC Overhead line and 750V DC

Third Rail / Ventilation / Health & Safety Executive requirements,

lighting & power services, assurance documentation, building services and

signalling supply system.

Aug. 2004 - June. 2006 Birse Metro Ltd. London / Alstom Transportation

(France) Israel (Ministry of Transport) / Multiplex Ltd (London Underground

Ltd)

Design Co-ordinator / Project Management / Consultant for Walthamstow

Subway Interchange LUL project. The responsibilities involve close

coordination with stakeholders: MRBCV / LUL/ Network Rail / Prestige /

Connect, consultants: EMC, Human Factors, M&E, Fire / Gas, Communication

(PA/ CCTV/ Acoustic), Platform lift, MIP lift, EDF (Power), SCADA,

Ventilation, Architecture, Premises, Building Control, LUL Asset Engineers,

Fire Authority, Health & Safety Executive, lighting & power services,

assurance documentation, building services & services diversion.

Systems Manager / Consultant (Asst. Technical Project Manager) for a metro

/ LRT project in Jerusalem (Israel) dealing with consortium members /

Client (Israel Transport Authority) / Operation & Maintenance (Connex,

France) in relation to Traffic Management / Safety Management / LRT )

Operation Management, Systems Management. The systems management includes

environment (EMC / EMI, noise, vibration), RAM, Interface (depot, building,

substations), co-ordination for approval etc, systems specifications

(rolling stock, infrastructure and signalling systems and various

subsystems). Subsystems includes train signalling system, traffic

signalling system, operation control centre, AVL and public information

system, energy system, communication system, fare collection system,

rolling stock, depot, track work system, catenary, power system, radio,

SCADA etc, The LRT system is about 14km with 23 stations, 11 substations,

70 road intersections.

Project Manager / Systems Manager (Interface / Integrating / Assurance &

Compliance accredited by LUL) on the White City 3billion Development

Project on London Underground land involving new subsurface 16 road sidings

/ Eastbound & Westbound Central Lines tunnels / Hammersmith & City Line

viaduct. The systems integration involves various disciplines: electrical,

mechanical, fire, power including system earthing and lightning protection,

structural, civil, track, conductor rail, control & information,

communication, signalling, lifts & escalators, architecture

(premises). Systems interface involves design (Waterman Group,

Westinghouse Signals Ltd and Parsons Brinckroft Ltd) / EMC (Technology

International Ltd) / Human Factor (EMS Ltd) consultants, project managers,

construction managers, surveillance & audit manager, procurement manager,

quality manager, health & safety manager, contractors, SPL (power supply),

Scottish &Southern, EDF, Connect, Metronet BCV and Metronet SSL, SCADA.

Consultant / Engineer for Alstom (Areva) UK Project Engineering Group for

the Hydro-Quebec (Canada) 735kV / 315kV De-ice Project, the WORLD FIRST

preventive black-ice project against power failure by making use of

circulating DC current of 7200 A at 17kV (250MW) for heating the lines and

static compensation for 125Mva.

Dec. 2003-July 2004 Tube Lines Ltd (Bechtel /London Underground), London,

UK

Project Engineer / Project Management / Systems Integration Management /

Assurance Management: Responsible for London Underground Stations

Refurbishment / Modernisation Project; managing a team of Liaison Engineers

(architect, electrical, mechanical, structural / civil, fire, drainage,

communications) and the Lead Designer Consultants (ALW / TLP / Scott Wilson

/ Gleesons); Interface with Assurance Agents / Asset Engineers /

Engineering Manager / Manager (Engineering).?

July 2002-Nov. 2003 Athen (Attiko) Metro, Greece / Balfour Beatty,

Alsthom, Railtrack, London, UK

Project Management / Systemwide Consultant: Responsible for systemwide

integration, testing, commissioning, operation, maintenance aspects of the

Athen Metro Line 2 (existing 9.2km with 12 stations + extension 4.4km with

4 stations) and Line 3 (existing 7.6km with 7 stations + 9.6km with 9

stations and 2 Depots) Extension Project. The systemwide includes track,

signalling (interlocking, ATO, ATP, ATS, PIS, OCC using FS3000 jointless

track circuits), power supply 20kV ac / 750VDC, lifts and escalators,

lighting, fire, ventilation, water supply, drainage and pumping, interface

with 25kV main overhead line system, telecommunication, CCTV, clocks, PA,

fare collection, utilities and diversions, rolling stock (15), training,

SCADA.

Project Management Consultant (Project Manager - Alsthom): managing

electrification refurbishment project at various National Grid sites. The

team includes Health and Safety manager (includes method statements and

risk assessments), Quality Manager, Planning Manager, Delivery and

Commissioning Manager, Site Managers, Project Engineer, Commercial Manager

and Procurement Manager.

MIMS Project Management Consultant (Balfour Beatty - Kent): Responsible for

MIMS Implementation in co-ordination with Railtrack (Network Rail).

Management Consultant / Design Integration Manager - Rail Track West Coast

Main Line Modernisation Project: Responsible for the design integration and

the client approval. The design / integration is related to mainly Section

12 Blockade area for the track / track alignment / signalling / overhead

line equipment (catenary) / power supply / M&E / civil / tunnelling /

drainage / S&C / environment / speed profile improvement / EMC issues /

Rail Track standards / W7, W12, Class 221, Class 390 gauge issues and needs

application of Primavera 3 Sure-track, project planner / control software

tool / quality aspects / safety aspects. Also responsible for the material

procurement management / contract management and cost control activities.

The project is mainly to improve the existing track suitable for a 125 /

140 MPH speed from the existing speed of 80MPH as part of the Euston -

Glasgow Route.

Senior Rail Consultant / Project Manager (BBRIS- Wessex) Managing a 4

million Safety related contract for the competency assessment of the

technical personnel mainly related to Electrification & Plant (including

Point Heaters) and Signalling & Communication.

June 2000- June 2002 BECHTEL, London, UK

A. Channel Tunnel Rail Link / Union Railway, London, UK

Manager - Power Systems (M&E / Catenary / Signalling), Systemwide

Responsible for the Systemwide power related activities - design / supply /

installation / commissioning of in-feed substations (400kV), auto

transformer substations (25-0-25kV), 11kV/ 400V distribution centres / ac

traction / dc traction interface throughout the Project. Also responsible

for the EMC / safety / health / hazard / quality surveillance / earthing &

bonding / system integration aspects and interface activities with the

catenary / signalling / track-work / control & communication (SCADA /EMMIS)

/ rolling stock / civil contractors including contract management, review

of budget and trends, schedules, system integration, testing &

commissioning, maintenance & operations aspects. Signalling includes track-

circuits / points etc. Responsible for the project control / planner

activities using PRIMAVERA software, procurement, cost control and contract

management.

TGV trains run via Channel Tunnel to Waterloo at present. The development

of the new route includes studies related to rolling stock for the

timetable purpose as well as for the electrification purpose.

The Channel Tunnel Rail Link is being built by London & Continental

Railways Limited. It will be Britain's first major new railway for over a

century - a high-speed line running for 109km (68 miles) between St Pancras

station in London and the Channel Tunnel. The project was authorised by

Parliament with the passage of the Channel Tunnel Rail Link Act, 1996. ?The

new high speed line is being built in 2 Sections. Section 1 has been under

construction since October 1998 and runs between the Channel Tunnel and

Fawkham Junction in north Kent. The first Section is on schedule for

opening in October 2003.?Work on Section 2 began in July 2001 and completes

the new line into London's St Pancras. Section 2 is on schedule for

completion by the end of 2006.

B. Korea High-Speed Rail Const. Korea ?

Manager (Electrical Facilities / Signalling / Communication) & Advisor for

project control, technical review & discussion, to attend supervisor /

contractors meeting as and when required, review contract documents, to

follow up progress and identify critical activities, to review quality /

surveillance aspects, to review safety / health / hazard aspects, to review

budget / trends, system / integration co-ordinator for various components:

rolling stock, traction power, signalling (ATC / IXL) & controls,

communication, catenary systems. Also responsible for the project control

/ planner using PRIMAVERA software tool; material procurement; cost control

activities. ?The rolling stock contract includes 46 train-sets. The first

14 train-sets delivered from TGV France directly and the remaining train-

sets manufactured / delivered locally in Korea as per the KHRC

specifications.

The project ' Seoul to Pusan High Speed Rail ' is the largest

transportation infrastructure project in the world. This mega-project

involves the engineering and constructionof412 kilometre of track bed, with

over 47% of the alignment through 83 tunnels and 27% over bridges and

viaducts. Built to accommodate the French TGV high speed trains running at

a maximum speed of 350 kilometres per hour, the construction is 35%

complete and will open for commercial operations in December of 2003. There

will be 46 train sets, each capable of carrying 1000 passengers from Seoul

to Pusan in 1 hour and 56 minutes.Eleven rail depots will be built.

Catenary installation for two 25kV systems has been completed on the 34.1km

test track that has already opened in December 1999. The Korean Vision is

for the High Speed Rail Line to extend into North Korea, and then to link

Asia with Europe. ?

Oct 1999 -May 2000 ABB POWER TRANSMISSION & DISTRIBUTION, Stone ?

Manager / Consultant for technical support (mainly protection related) &

management of refurbishment projects: 275kV Reactor, New Cross Sub-station,

NGC; London Underground (PFI) Projects; Electricity Boards Projects (11kV -

500kV). This includes Microsoft Project Application, CDM regulation, EMC,

Health & Safety, Quality Control aspects. ?

London Underground (PFI) project ?

Main responsibility was the design work related to installation of SVC

(static-var-compensator) at various location (substations) of London

Underground. The estimated cost of the project was 10 million for the

network studies, supply and installation of reactor compensators at

suitable points, to improve upon the quality of power supply to London

Underground from London Electricity in respect of both voltage drop problem

as well as harmonics problem. Space, access, time and money were major

constraints that dictate the points of connection of the compensators. ?

Also, responsible for checking sub-contractors' documents and getting

approval from the client. Assisting in identifying the SCADA requirements

for the electrification works. Preparing specification for suppliers and

negotiations during the contract period for any additional items. Giving

advice & helping client on the specialised area of train protection. ?

The project involves:

1) software based study for the optimum points to install SVCs, 2)

feasibility study to install SVC at the strategic location e.g. Neasden,

Greenwich etc, especially when all the supply system is under review due to

use of Greenwich Generating Station absolutely for the emergency purpose,

3) protection system design, 4) switch-gear selection, 5) cable design etc,

6) Microsoft Project software application for the project planning, 7)

manpower planning. ?

Oct. 1997 - Jun 1999 MITSHUBISHI ELECTRIC EUROPE / TEKNICA, London ?

Consulting Engineer / Manager: in-charge of 2 engineers for design

feasibility and bid preparation for Bangkok - Metropolitan Rapid Transit

Authority (Railways).

The Bangkok MRTA project was to provide transportation facility to Bangkok

metropolitan people. There were 20 stations with a major point of electric

supply sub-station in the middle. The sub-station consists of two

transformers each with the rating of about 60 MVA 24kV Secondary Supply.

The project cost for the electric system was of the order of 25 million

including all the cabling for a tunnel length of about 20 miles. ?

The project financed by Mitsubishi, Japan, was sponsored by Alsthom, France

for the AC/DC electrical system design (including 10 traction substations),

supply, installation, testing and commissioning specifications, and 25

years maintenance contract (approximate value 10 million). The major

components were switch-gear, ring main units, more than 80 miles of 22kV

cable in length, interface with communication and signalling involving EMC,

quality assurance, health and safety aspects including manpower, project

planning etc., cables, lifts, escalators, automatic platforms, air

conditioning systems, automatic ticket checking systems. ?

Responsible for checking sub-contractors' specifications / documents and

getting approval from the client. Assisting in identifying the SCADA

requirements for the electrification works. Preparing for supplier's

specification and negotiations during the contract period for any

additional items. Giving advice and helping client on the specialised area

of train protection. ?

Also responsible for upgrading power system of 138kV transmission,

34.5/4.8/0.48kV distribution, 13.8kV generation, protection system,

preparation of electrical fault analysis report for other projects. ?

Apr 1994 - Sep 1997 LONDON UNDERGROUND LTD ?

Project Engineer / Manager, E&M, Jubilee Line Extension Project:

1. Project management (Manager) of Mile End and Mansell Street

substations modification works,

2. To review design documents of a 55million Contract- Power, Cables

and Conductor Rail Systems (CEGELEC Projects Ltd. Rugby). This involves

22kV switch-gears, cables, protection panels, DC switch-gears, protection

co-ordination study, reliability study, operational philosophy, load flow

study, fault level and protection settings, transformers, rectifiers, dc

protection etc. in accordance with British, EC, LUL, ESI standards,

3. To attend interface meetings with other Groups: Signalling,

Communications (mainly SCADA), Maintenance, Construction, Services,

Contracts,

4. To interface with London Electricity for Bulk Supply Point

connections and supply,

5. Assisting in identifying the SCADA requirements for the

electrification works,

6. Preparing for suppliers the specification and negotiations during the

contract period for any additional items,

7. Giving advice and helping client on the specialised area of train

protection.

8. Application of PRIMAVERA planner / control tool, contract management,

procurement and cost control.

?1990- Apr 1994 CEGELEC (GEC-A) / P&B Engineering, Manchester ?

Section Leader / Project Manager: power system analysis, protection co-

ordination, analyse customer specifications and submit tenders, design

systems and prepare equipment specifications (cables, transformers, switch-

gears, generators, protection panels, batteries, etc. in accordance with

BS, IEC, CEGB, ESI standards), site supervision & commissioning, audit

client electrification system. Client: London Underground Ltd (Central Line

) / British Rail. Supervising staff - 5. ?

1985 - 1990 R E S (Lic. of CEGB) / Universities, UK ?

MANAGER: customer liaison and software development for system control &

protection. Associated with the universities regarding communication /

control / signalling and electrification of London Underground and British

Rail. ?

1969 - 1985 BHEL India / Libiya / Saudi Arabia / Mitsubishi Electric, Japan

?

Advisor/ Manager- Planning, co-ordination, maintenance, contract

administration, project control for power station & substations (Kennedy &

Donkin, UK - Consultants) / railway electrification feasibility /

electrified railway associated protection, signalling, communication &

control. ?

DETAILS: QUALIFICATIONS ETC.

MBA (Marketing), University of Hull, 1996.

Diploma (Engg. Management-Projects) Pt2,1996, UK

Ph.D (Electrical Eng.) 1989, The City University, London.

M. E. (Elec. Meas. & Inst. ), 1973, University of Roorkee, India

B.E. (Electrical), 1969, University of Roorkee, India

MBA Details: Business Environment, Marketing Planning & Operations, Human

Resources Management, Accounting & Finance, Marketing Research, Marketing

Communications, Effective Management, Sales Management and Promotion,

Strategic Management, Organisation Design and Development, International

Marketing

MBA Project: Marketing Plan for Jubilee Line Extension Project, London

Underground.

IEE (UK), Corporate Member/ Chartered Engineer, C. Eng.

CIGRE (FRANCE)

IEEE (USA), Senior Member

The Institute of MANAGEMENT, UK

The New York Academy of Sciences (USA)

Biography Published in 'WHO IS WHO', USA, 1995

Award: London Underground Ltd./ Jubilee Line Extension Project 'Company

Award' for saving 1million in the cost of cables by an innovative design

of 22kV Sub-station.