Carmelo Joseph Sanchez Bingcang
#*** ***. ******* **., ***. Domingo Angeles City, Philippines
Mobile Nos.: 092*-***-****/091*-***-****
Email Add.: ************@*****.***
Career Objective:
Experienced Electrician eager to find employment that would further enhance and develop my skills.
Specialty skills include prepare wiring diagram, electrical wiring and installations, install, replace and repair electrical controls and panel boxes, splice, join and connect wires, test and measure voltage, loads, ground faults integrity of circuits, troubleshoot and isolate faults, responds to breakdowns, diagnoses and repair electrical system, troubleshoots electrical equipment, machinery and motors including air conditioning units – window and split type.
WORK EXPERIENCES:
Clark Resort Travel & Amusement Corp. – Fontana Casino, Clark Freeport Zone, Pampanga, PHILIPPINES
16 April 2008 – PRESENT
Presently, I am employed at Fontana Leisure Park. As part of the Electrical Maintenance Team of the Casino Area, we are responsible in the proper or good working condition of all electrical equipment in our division.
The design of an electrical lay out would depend on numbers of lights, outlets, range outlet, air conditioning outlet and breakers, it specifies the exact location.
Breakers must be arranged from the lowest ampere to the highest one, it will be more convenient and easy in making schedule of load that appears on the breaker’s doors. Install electrical equipment and make necessary changes, adjustments and modifications to obtain desired results. For the electrical equipment, It would be based on the wattage of equipment.
Example:
Aircon = 1HP = 746 watts
Volts = 220V
Find = ampere
Formula:
P 746
I = ; I = = 3.39 or 3.4 amp
E 220
My job entails replacing defective bulbs, switches, outlets, etc. I also maintain neon lights with 15,000 volts using step up transformer, from 220 volts to 15,000 volts and a generator Perkins brand 880 KVA. We have a daily routine to check the radiator H2O level and mix a coolant to avoid over heating. Checking of oil to maintain high level base on oil stick. Clean Air filter, charge it with diesel and run for 5 minutes once a week to avoid problems during power interruption and malfunction of the generator.
The 2117 amp Generator is supported by Automatic Transfer Switch 2,000 ampere each for normal and emergency.
They have 2 kinds of transfer switch:
1) DPDT = Double Pole = Double throw = For Manual Only
2) ATS = Automatic transfer Switch
The Main Breaker – Power Break 1 spectra with logic board – reading the Casino’s Daily Load; L1= 1.11amps, L2 = 1.20amps, L3 = 999amps daily operation.
I also installed a manual transfer switch using a breaker for normal and UPS emergency.
Motor Control Circuit 3 phase or single phase would depend on Diagram. I experienced installing 3 phase across the line 440 volts/220 volts using a control panel design, using a contractor, and overload relay and stop/start button.
Finding and repairing electrical equipment must be done using an analog multi-tester or digital tester. There are different kinds of testers in finding different faults or problems:
Example:
1) Multi-tester – checking of resistance, volts, DC, and others
2) Clamp Ammeter – checking of load
3) Thermometer – laser radiation
4) Phase meter – checking of phase sequence
5) Megger – checking of grounded wire
Finding a solution is not easy unless you study the procedure of equipment or you know what the problem is. Diagnose, evaluate, prioritize and complete necessary repairs by the use of tester. Electrical breakers, single motor and 3 phase systems and other equipment. For Example: There is no power in the living room. Check the breaker. Due to overloading, breakers will shut down. Check the load by using clamp meter, if the reading is higher than the normal load allowed, reduce load and replace 10% higher for newly installed.
Before and after finishing a project or undertaking, necessary precautionary procedures are being done to check possible faults.
Using an analog multi-tester check each circuit for shorted or wounded wire. First, place the red lead on the ground being wet by water. Note that the tester is place in resistance or OHM to show continuity because water is a good conductor and it will get 99% accuracy. The black lead will be placed on the breaker’s individual lugs and screws.
Polarity is commonly used in DC which either + or – direction.
Documentation took place after I had finished a task given. Just like in my previous jobs, an accomplishment report should be submitted after every shift schedule to insure that quality service was being made and company’s time was used properly. Documentation is very important in our job for monitoring purposes such as staff performance evaluation and for future trouble shooting purposes.
ERCA – Electrical Construction Services, Angeles City, Pampanga, PHILIPPINES
August 2006 – March 2008
I worked as an Independent Electrical subcontractor and I have gained experiences in the following areas:
- Install electrical equipment and make necessary changes, adjustments and modifications to obtain desired results.
- Implement electrical layout for proposed renovations.
- Installation of additional wiring and conduits from electrical equipment
- Suggest improvements for correct phase loading
- Connect installed wires to circuit breaker and transformers, timers and other electrical equipment.
- Connect electrical system to power supply.
AL-MEERA Kitchen – LLC, DUBAI
August 2004 – July 2006
I worked as a fabricator, installer and electrical maintenance technician.
This position did not consist of using my skills as an electrician in the major part of my work.
Fontana Leisure Parks, Clark Freeport Zone, Pampanga, PHILIPPINES
June 1998 – July 2004
- Perform preventive maintenance on electrical equipment, machinery and motors, power and lighting systems and air conditioning units.
- Troubleshoot and repair electrical/mechanical failures of machines and their related components.
- Inspect and monitor on a daily basis the operation of the electrical facilities.
- Perform other tasks assigned by my immediate supervisor.
ERCA – Electrical Construction Services, Angeles City, Pampanga, PHILIPPINES
December 1997 – May 1998; August 1995 – January 1997
Being employed as an Electrician, respectively, I gained experienced in the following areas:
-Measures, cut and installs PVC, offset PVC by the used of torch and pulls wire with a guide wire;
-Splice, twists and solders wired and applies tape or terminal caps;
-Install various types of electrical conduit, wiring, cables and terminal ends, including knowledge of the dangers involved in explosion proof installations;
-Positions and installs electrical switch boards or panel boards;
-Place conduit (pipes or tubing) inside designated partitions, walls or other concealed areas and pull insulated wires or cables through the conduit to complete circuits between boxes.
Durastress Corporation, ANGELES Industrial Park, Pampanga, PHILIPPINES
February 1997 – November 1997
As an Electrician, I was tasked to perform corrective maintenance for all electrical equipment. Troubleshoot electrical motors, pumps, timers, power and lighting systems. Inspect and monitor daily operation of facilities and electrical equipment. Perform leadership during the absence of person in charge and Initiate work order for smooth and continuous operation of the electrical system.
Educational Information:
I have gained my knowledge through formal education at Holy Angel University and Angeles City National Trade School for a period of 3 years.
I was educated at Holy Angel University, Angeles City, Pampanga, Philippines as an Electrician and continued my studies in Angeles City National Trade School from 1990 to 1992.
I obtained the following qualifications in:
Holy Angel University-Industrial Electricity: a one year course where I gained the knowledge of electrical theories. Education concentrated on diagrams, motors and wiring installation from simple to complicated ones. I was taught to create electrical diagrams and then do actual wiring for three-phase motors and wiring installations based on these diagrams.
Angeles City National Trade School-Electrical Technology: a two year course where I gained more knowledge and experience in the electrical field. We engaged in further electrical theories and actual wiring installations. Our instructor was an electrical contractor himself, thus making us, the students, do the permanent wirings of the building he was into, where he derived our grades. I also had undergone on-the-job training for 720 hours at San Miguel Corporation-San Fernando Pampanga.
I have acquired my National Certificate II(NCII) in Electrical Installation and Maintenance from the Technical Education and Skills Development Authority(TESDA).