Post Job Free

Resume

Sign in

Water Treatment Plant

Location:
Bellflower, CA
Posted:
February 01, 2017

Contact this candidate

Resume:

Rufus Young Email: acylcd@r.postjobfree.com

***** ******* ***. #*, **********, CA 90706 Cell 562-***-**** Home 213-***-****

SUMMARY OF SKILLS

Knowledge of Coding

Blueprint Reading

Knowledge of Working Forklift

Install, inspect, maintain and repair water

And gas lines

Credentials/Certifications

Forklift Training Exp. 01/09/2017

Pipefitter Exp. 02/26/2017

NITC Certification Exp. 2017

Education

Apprentice & Journeyman Training Center-

Course of Study

Orbital Welding

Instrumental Tech- Phase I

Pipefitter(

1st Orientation, Piping Math, Piping Drawing1, Advanced Math

2nd Piping Drawing 2, Gas Distribution, Drainage, Water Distribution

3rd Copper & Acetylene, ARC Welding Plumbing Code 1, Plumbing 2

4th Service & Repair, Science/Builders, Design & Layout, Fixtures & Controls

5th Medical/Gas, Modules/Estimating, CPR & First Aid, Rigging

Experience

Local 250 2014-present

MD Hertzog, Paramount, CA – Fabricator and Tube-bending

Ryan’s and Assoc. Weaver, Iowa – fitter and design and layout, read blueprints, ran 14” pipes for underground sewer lines.

Flatiron Company, Long Beach, CA- Tube-bending, fitter for ABS pipes, installed parts of a water treatment plant replaced old pipes with ABS pipes and stainless steel.

CTS Company, Lima, Ohio- Pipefitter, installed and maintains gauges and switches on gas lines, installed valves in fresh air environment. Blocked out old valves and installed blanks. Ran sprinkler lines for refinery.

Local 364-****-****

Newtron Company, Blythe, CA- pipefitter, new build solar refinery, tube bending, installed rain pipe for air lines, size ranged from 1” down to ”, installed cable trays for air lines. Ran waterlines for the plant.

ARB Company, Mojave Desert, CA- Installed 24” to 40” lines for steam and water for solar plant.

Union Local 494 Plumber & Steamfitter 1999-2013

Installed new pipes for waste and water system in compliance with state code and regulations. Installed sewer lines for new commercial buildings. Installed wet vents and lavatories. Installed overflows and drains. Installed gas lines, swaybracing, new meters and underground fusion pipes for gas lines. Installed medical cooper lines for hospital with Brazer. Refinery fitters work which included screw pipe and carbon steel. Digged ditches.

References Available upon Request



Contact this candidate