Power Plant Project

Location:
India
Salary:
30+all accomodations
Posted:
February 01, 2017

Contact this candidate

Resume:

RESUME

NAME : ANKIT KUMAR MOBILE NO. : 900-***-****

849-***-****

ADDRESS- PISKA MORE, DEVI MANDAP ROAD EMAIL : acylay@r.postjobfree.com

SAROVAR NAGAR RANCHI -5

JHARKHAND

OBJECTIVE :

Seeking a challenging and a rewarding career to utilize my skills and abilities to the best of the organization as well as my professional growth while being resourceful innovative and flexible and obtain an entry level management position where the career is challenging to prove myself.

Profile summary:

TOTAL 2 years experience in construction of thermal power plant projects.

Experienced in Erection of, CFBC boiler & TRAVAGRATE boiler

Experienced in erection of Piping, ESP, and rotating equipments like fans & Pumps.

EXPERIANCE

Working as a site engineer in M/S.SINGH BROTHERS TECHNO ENGINEERS, Pune, Maharashtra period 11/6/2014 – 13/12/2014.

Working as a site in charge in VERSATILE THERMAL ENGINEERS Rajahmundry, Andhra Pradesh period 14/12/2014 – 30/4/2016.

Working as a site incharge in PRIVILEGE BIKSONS BOILERS PVT. LTD. PUNE,MAHARASHTRA. PERIOD 5/5/16 - PRESENT.

PROJECT:

1 x 12.5 MW Co-generation power project Travelling Grate Boiler cap- 75 TPH WP- 93 Kg/cm^2 M/s LIPI BOILERS LTD. M/s. Shivratna udyog ltd. Maharashtra.

1 x 25 MW Cogeneration power project Travelling Grate Boiler cap- 130 TPH WP- 87 Kg/cm^2 M/S WALCHAND NAGAR INDUSTRIES LTD. M/s SITSON INDIA PVT. LTD. at Narayangarh Sugar Mill Ltd Shahzadpur Haryana.

1x15 MW Co-generation power project Travelling Grate Boilercap-80 TPH WP-96 Kg/cm^2 M/S WALCHAND NAGAR INDUSTRIES LTD. at M/s. Subramanian Shiva CO. Operative sugar mill Harur, Tamil Nadu.

1 x 25 MW Co-generation power project Boiler AFBC boiler cap-120 TPH WP - 83 Kg/cm^2 at M/s. SRAACL, Kurnool, Andhra Pradesh.

1x12.5 MW Co-generation power project,SINGLE DRUM,WATER TUBE, COMPACT TYPE, BOTTOM SUPPORT, CFBC Boiler cap 50 TPH WP -115.5 KG/CM^2 M/S. ISJEC HEAVY ENGINEERING LTD. AT M/S SIPM LTD. MYSORE, KARNATAKA.

2x3. 5 MW captive power plant project, boiler refurbishment total pressure part replaced. M/S. KIOCL LTD. MANGALORE KARNATAKA.

.

Job responsibility:

Planning & scheduling the erection and sequence of the activities related to the mechanical work at site.

Implementing the work schedule & monitoring the day to day progress of the work.

Erection as per standards and drawings as per requirement.

Preparing weekly / Monthly Reports for submission to Management.

Reporting to client on weekly and monthly basis regarding target achieved, future plans, backlog analysis and constraints.

Preparation of erection protocols.

Material follow up and ensuring the sequential availability of material during various stages of erection

Controlling all construction and commissioning activity of mechanical work.

Interacting with customer, contractors and statutory authorities such as boiler inspector, factory inspector relating to mechanical work.

Handling central excise formalities and IBR formalities at site.

Maintaining materials records and materials follow up.

Executing fabrication of supporting structures at site.

Reviewing the work done by the contractors and subordinates.

Developing and implementing strategies for optimum utilization of resources.

Resolving the issues and bottlenecks.

Ensuring Quality and Safety at site.

Erection Procedures & process implementation.

Overall responsibility at site.

Skills:

Experienced in erection and commissioning of IBR & Non IBR piping.

Knowledge in Erection & commissioning of Pressure parts like Water wall panels, Economizer coils, Risers and down comers, Super heater coils & Headers, Link pipes of various capacity boilers that includes PC, CFBC, Travagrate and HRSG,FM,Radiant boilers.

Experienced in fabrication and erection air and flue gas ducts and coal Bunkers.

Experienced in erection of structures that includes primary and secondary structures of Boilers and supporting structures for rotating equipments.

Experienced in erection of Horizontal and vertical APH, Coal handling system, Ash handling system, ESP and De-aerator.

Experienced in project Management at site level.

Exposure to project scheduling and monitoring.

Experienced in fabrication and welding inspection.

EDUCATIONAL QUALIFICATION :

PARTICULARS

UNIVERSITY

COLLEGE

YEAR

%

SSLC

C.B.S.E

D.A.V.PUBLIC SCHOOL HEHAL,RANCHI

2009

49%

DIPLOMA

DTE

ANANDA MARGA POLYTECNIC, MALUR KARNATKA.

2014

65%

COMPUTER SKILLS :

* Computer Language : C-PRGRAMMING

* Operator : Windows XP

* Operator tool : M.S. Office, official tools

* Design software : Solid Edge, CNC.

LANGUAGE KNOWN : HINDI, ENGLISH

PERSONAL DETAILS :

Name : Ankit Kumar

Father's Name : Sanjay Kumar Lal

Date of Birth : 11.01.1994

Sex : Male

Marital Status : Single

Nationality : Indian

Permanent Address : Ankit Kumar

C/o Sanjay Kumar Lal

Piska More Devi Mandap Road

Sarovar Nagar near Surya Mandir

Ranchi, Jharkhand

Pin-834005.

DECLARATION:

I solemnly declare that all the above information is true and up to date if any information is found to be false then my candidature is liable to be cancelled.

ANKIT KUMAR

RANCHI, JHARKHAND

Date :



Contact this candidate