CAREER FOCUS
Looking for a position of a Chemical Engineer in an organization where my
qualifications and experience can be utilized to achieve organization's
objectives
PROFILE
Skilled and motivated chemical engineer with proven abilities in leading
plant operation, process engineering, technical support, six sigma, process
development, installation, commissioning, startup, plant optimization,
process safety (PSM), MOC, HAZOP, risk analysis, maintenance
troubleshooting in chemical and pharmaceuticals industries.
. Developed PFDs, P&IDs, process calculations, heat and mass transfer
balances and datasheets
. Conceptualized and completed overall project process planning, project
proposal and cost estimation
. Applied DOE, SPC, lean manufacturing and six sigma problem solving
approach for process improvement
. Resolved plant problems, gathered and analyzed plant operations data,
optimized energy consumption, process optimization, process monitoring,
cost reduction, performance monitoring of equipment
. Implemented process modifications, debottlenecking, quality and process
improvement of the plant
. Developed process from laboratory to pilot plant, pilot plant trial run
to collect data for process scale-up
. Managed plant operation, process improvement, incidence investigation,
root cause analysis, management of change (MOC) process and key
performance indicator (KPI)
. Demonstrated the knowledge of codes, standards and practices (API, ASME,
NFPA, ANSI, OSHA PSM)
. Managed daily production activities, improve processes, production
reliability and product quality
. Conducted trial run in pilot plant at different process parameters,
handled the plant and laboratory
. Led and trained production and research teams to achieve production,
quality and environmental targets
. Monitored and optimized process parameters of batch and continuous
process plants
. Implemented process modifications to increase production capacity,
product quality, yield and solvent recoveries, improve quality and reduce
costs in the plants.
. Identified the potential sources of energy, yield and solvent losses
using mass and energy balances and suggested modifications to minimize
the losses
. Prepared project proposal, cost estimation, man hour estimation, wrote
technical reports
. Provided customer technical support, input for construction,
commissioning, startup and operations
. Trained and supervised junior and intermediate process engineers, liaison
with EPA and regulatory agencies
. Demonstrated excellent problem solving, communication, leadership and
computer skills
Experience
Principal Process Engineer 2015 - present
WorleyParsons America
. Resolved plant problems, gathered and analyzed plant operations data,
optimized energy consumption, process optimization, process monitoring,
cost reduction, performance monitoring of equipment
. Implemented process modifications, debottlenecking, quality and process
improvement of the plant
Principal Process Engineer 2011 - 2015
WorleyParsons America
. Developed PFDs, P&IDs, process calculations, heat and mass transfer
balances using HYSYS simulation tool
. Responsible for commissioning of equipment and confirmed that all
equipment operates as per design
. Managed plant operation, monitored process parameters to implement
process troubleshooting
. Prepared SOPs, plant performance report, maintenance reports, safety
reports, production planning
. Accomplished process troubleshooting to minimize the plant downtime,
optimized process parameters and monitored conditions of all related
equipments
. Emphasized health, safety and environment (HSE) activities, making safety
a regular part of each work performed, process risk assessment, process
safety management (PSM)
. Provided engineering support, technical input for construction,
commissioning, startup and operations
. Developed pre-commissioning, commissioning, start-up execution plan,
procedures, works lists, planning, scheduling, vendors mobilization plans
and schedules
. Led multi-disciplinary liaison between construction, commissioning and
clients, prepared punch list
. Participated in value Improvement processes and implemented the
recommendations in process design
. Completed cold eye review, technical audits and technical peer reviews
. Prepared scopes of work, timelines, cost estimates, optimization and
operating cost reduction opportunities
. Accomplished technical coordination with customer to ensure that the
client's expectations are satisfied
. Developed operating procedures, system description, control philosophy
and training manual
. Prepared control narratives, cause and effect diagrams, process
description and process design basis
. Conducted HAZOP, OSHA PHA, risk assessment, SIL, PHA and PSSR to identify
process hazards and successfully implemented the recommendations, key
performance indicator (KPI), incidents investigation
Sr. Process Engineer 2008 - 2010
Saipem Canada, Calgary
. Developed process form lab to pilot plant, calculations, PFDs, P&IDs,
simulations, Heat and Material balance
. Contributed in design review, PHA, HAZOP, risk assessments, model reviews
and squad checks
. Troubleshoot process related problems using root cause analysis,
commissioning and startup operation
. Carried out energy & mass balances, fluid dynamics calculations to
identify the process improvement scope
. Initiated, designed and implemented process modifications for successful
commissioning of the plant
. Monitored & optimized the process parameters to get better quality and
yield
. Successfully coordinated Maintenance, Quality & Production departments to
achieve plant targets
. Led the plant reliability, continuous improvement, quality & safety
committees
Research Associate 2006 - 2008
Ryerson University, Toronto, Canada
. Conducted research on mixing of non-Newtonian fluids using computational
fluid dynamics (CFD) simulations
. Designed, installed and commissioned the mixing reactor and validated the
simulation results
. Accomplished operation and performance analysis of a the mixing reactor
size and impeller design
. Performed process optimization, analyzed power consumption, mixing time
and impeller speed for reactor
Chief Process Engineer/Project Manager 1992 - 2005
Adi Chemicals, India
. Lead technical team during process design, commissioning and startup
operation, process troubleshooting
. Accomplished laboratory and pilot plant trial run to collect data for
process scale-up
. Managed and supported daily production activities of plant, monitored
process parameters
. Supervised R&D center for experiments related to yield and quality
improvements
. Implemented process modifications to remove bottlenecking to improve
process and environmental performance of the plant
. Applied design of experiments, lean manufacturing and six sigma tools for
process improvement
. Optimized the process parameters using statistical methods for better
yield & quality
. Led and trained production and research teams to achieve production,
quality and environmental targets
. Developed PFDs, P&IDs, and mass and energy balances, material selection
diagrams and calculations
. Conceptualized and completed overall project process planning, project
proposal and cost estimation
. Accomplished technical coordination with customer to ensure that the
client's expectations are satisfied
. Coordinated with multi-discipline engineering activities during project
execution
. Reviewed general arrangement of piping layout, isometrics drawings,
equipment layout and plot plan
. Performed planning, organizing and directing capital and major expense
projects for the plant
. Headed production projects including process design, front end and
detailed engineering design, feasibility study, reliability, cost
estimation, procurement, negotiations, planning and construction
supervision
. Contributed in strategic planning, scheduling, budget development and
made recommendations
. Managed construction, piping, equipment installation, commissioning,
startup operation, process optimization and troubleshooting production
unit, utility and offsites
. Conducted HAZOP, identified process hazards and successfully implemented
the recommendations
. Established the production department from start, trained process
operators and junior engineer
Education
MASc in Chemical Engineering 2008
Ryerson University, Toronto, Canada
BEng in Chemical Engineering 1992
Gujarat University, India
registrations/Affiliations
Professional Engineer, PEO
Professional Engineer, APEGA
Publications/presentations
. Prajapati, Poonam and Ein-Mozaffari, Farad "CFD Investigation of the
Mixing of Yield-Pseudoplastic Fluids with Anchor Impeller", Chem. Eng.
Technol. 2009, 32, No. 8, 1211-1218
. Prediction of thermodynamics properties of heavy oil and bitumen, Ryerson
University
technical expertise/specialist courses
. Aspen HYSYS simulation (Design and Rating of Heat Exchanger, Flare
Network, Advance Process Modeling Courses), CFD simulation (Fluent and
MixSim), PLC, DCS
. WorleyParsons Project Execution Plan training
. WorleyParsons Leadership Training Program
. H2S Alive Training, Enform, Calgary
. Construction Safety Training System (CSTS), Keyano College, Fort McMurray
. Workplace Hazardous Materials Information System (WHMIS), Keyano College,
Fort McMurray
REFERENCES
Available upon request