Electrical Engineer
Yury B Urim
Swampscott, MA, 01907
Mobile - 305-***-****
Home - 781-***-****
acyibq@r.postjobfree.com
Experience Highlights
Over 35 years of experience in Power Plant Engineering.
Extensive experience in Nuclear and Fossil Fuel Power Plant Electrical Power Distribution
Systems.
Provided field and engineering support to construction project
SUMMARY OF EXPERIENCE
Experienced Power Generation Industry as a Project and Systems Engineer performing
Electrical/I&C modifications, Plant Maintenance, Project cost control, and configuration
management activities at nuclear and fossil fuel power plants in the United States.
Experience encompasses duties in Plant Engineering, System Modifications, Construction Field
Engineering, System Field Engineer/Modification Engineer, Certified Test Engineer to Level II per
ANSI N45.2.6, Work Package Development /Planning (i.e. PASSPORT, Maximo), Scheduling,
Post Modification Testing and Start-up, Plant Operations, Component Engineering, and Pre-
operational Testing of power plant systems and industrial projects.
Have extensive experience in Nuclear Plant Electrical Power Distribution System; Security
Systems and DCS system upgrade modifications.
Education and Training:
Undergraduate Degree (USA Bachelor Equivalent), Electrical Power Distribution and Process
Systems, Vinnitsa Polytechnic Institute, Vinnitsa, Ukraine
WORK HISTORY
WECTEC (Stone & Webster Corp.), Canton, MA. 08/2006-12/2016
Sr. Electrical Engineer
Electrical Engineer responsible for all phases of engineering design, and specification
development and construction support of Vogtle Communication Support Center which included
Technical Support Center and varies plant security facilities.
Electrical Engineer provided construction and engineering support for Station Dry Fuel Storage
Project (ISFSI). Responsible for all phases of electrical and I&C portion of the project including all
security required changes/modifications and associated calculations.
Electrical Engineer responsible for development of electrical installation specifications, Isophase-
bus evaluation and conceptual design of a site swing battery system, as well as plant DC and
UPS system sizing calculation.
Electrical Engineer responsible for the development of an Engineering report for the Power Block
System, Onsite AC system, Emergency Diesel Generator system, Emergency Diesel Engine Fuel
Oil Storage and Transfer System, Onsite DC system, Offsite Power system, and Station Black-Out
evaluation. Update DBD and FSAR for power upgrades.
Electrical Engineer responsible for preparation of the Main Generator and Exciter Upgrade
specification; review of the ETAP Power calculations, plant grounding calculations, and
1 of 3
2
preparation of the Engineering & Licensing Reports. Section of the plant power system for power
upgrade projects.
Responsibilities include providing support to client project and office staff as an electrical engineer.
Preparation of the Main Step-up Transformers design and purchasing specification, Engineering
and Licensing Reports Section of the plant power system for Power Uprate Project.
Review of the Engineering and Licensing Reports Section of the plant power system. Review,
revise and update plant EQ documents for Power Uprate Project. Preparation of the plant
Cathodic Protection System modification.
Preparation and review of the Main Step-up Transformers design and purchasing specification,
generator rewind specification, large motor purchasing specifications, plant electrical calculations,
Engineering and Licensing Reports Section of the plant power system for the EPU Project.
DAY & ZIMMERMANN NPS, FLORIDA POWER AND LIGHT, TURKEY POINT NUCLEAR, 2/2005
01/2006
ENGINEER
Emergency Response Data Acquisition System (ERDADS) Replacement Project - Revised Engineering,
Administrative and Emergency Response Procedures to incorporate changes associated with Emergency
Response Data Acquisition System (ERDADS) Replacement Project.
Security Systems Upgrade Project - Provide a project planning and project control support to Security
Upgrade Project. Develop Engineering and Design schedules using appropriate predecessor/successor
relationships in Primavera P3. Consolidate independently generated project data effectively with Engineering
and cross-functional teams. Work as a key member on project teams to develop/maintain a construction
schedule using Primavera Project Planner (P3). Determine schedule activities, appropriate
predecessor/successor relationships, track issues and actions items, assist with change control process and
contribute to various project management measures and reports
Entergy Nuclear Corp, Pilgrim Nuclear Power Station, Plymouth, MA, 1990 2003
Sr. System Engineer
Senior Systems engineer my responsibilities included performance monitoring, and analysis, trend
review, scheduling of preventive, predictive and corrective maintenance, and review of related
industry-operating experience, duties included performance and resolution of system/equipment
root cause investigations, condition reports, technical issues, maintenance rule administration,
plant maintenance and work control process activities utilizing MAXIMO. Responsibilities included
security upgrades project scope development, design engineering, construction management,
procurement, licensing requirements, surveillances procedure development, administrative
procedure updates, training, startup, and testing and maintenance. Other systems under my
responsibility as Senior Systems engineer were the Plant Security System, Safety Class 125VDC
and Battery system, and the Reactor Re-circulation Pumps Control system.
Zurn/ Nepco Company, South Portland, Maine, 1989 1990
Sr. Electrical Engineer
Responsible for all phases of engineering and design of Electrical Distribution Systems for
combined-cycle power generation facilities; including power transformers, switchgears, motors,
power supplies, control panels, and wiring diagrams.
Impell Corporation, Waltham, MA, 1987 1989
Sr. Electrical Engineer
Responsibilities include analysis of Electrical Power Distribution Systems, correcting design
deficiencies and performing investigations of various Failure & Malfunction Reports Failure Modes
and Effect Analysis. Review various plant procedures and Plant Design Changes (PDCs) on their
technical adequacy, to insure compliance with regulatory requirements. Responsible for
development of the various types of database management software testing program,
2 of 3
Electrical Engineer
Yury B Urim
implementation of the program, including quality assurance verification of various types of
database management software.
Millstone Nuclear Power Station, Unit #3, 1985 1986
Electrical Engineer
Responsible for review and design modification of the power distribution for the process computer
system, managed start-up tests and review of these tests for the plant process computer,
interfacing with the Instrumentation and Control Department and Program Installation Department
to ensure the systems integrity, development and implementation of preventive maintenance and
diagnostic procedures for use during commercial plant operation.
Bechtel Construction Company, Limerick Generating Station, 1984 1985
Electrical Startup Test Engineer - Electrical Field Systems Engineer
Test Engineer - Analyzed and supervised pre-operational and acceptance tests for plant process
computer and process computer software, revised database software programs and provided
input for changes in software to upgrade system performance.
Electrical Field Systems Engineer - Responsible for post construction testing and inspection of
various plant electrical and control systems. Specific tasks included the review of logic and
schematic diagrams, verification of field installations, testing, troubleshooting and resolution of
equipment and design problems. Monitoring maintenance activities associated with control,
electrical and instrumentation systems and components prior to turnover to the client.
Stone & Webster Engineering Corporation, Millstone Nuclear Power Station, Unit #3, 1980 1982
Electrical Designer
Responsible for design of the wiring systems for motor control centers, control panels and one-
line diagrams from vendor drawings. Other duties included the design of cable trays, cable
routing and conduit arrangement.
Food Industry Design Institute and Co-generation Plants, Vinnitsa, USSR, 1972 1979
Electrical Engineer
Responsible for the engineering, design, installation and start-up of various electrical,
instrumentation
and control equipment of the process plant and industrial 35KV systems, including motors,
transformers, switchgear, high-voltage switches and related equipment and reviewing of tests
deficiencies.
REFERENCES: Available upon request.
3 of 3