Post Job Free
Sign in

Project Manager

Location:
Chennai, TN, India
Posted:
January 26, 2017

Contact this candidate

Resume:

CURRICULAM VITAE

MANOJKUMAR THEKKEDATH.

Marital Status: Married (02 children below 18).

Citizenship: Indian.

Date of Birth: 14th June 1972

Email: **********@*******.***

Current Location: India.

Mobile: +919*********(India).

Landline: +914*********(India).

EDUCATION AND QUALIFICATIONS

Bachelor Degree in Civil Engineering from Sardar Patel College of Engineering (Mumbai University) at Mumbai in India in the year 1997.

Advanced Diploma in Industrial Safety from Central Labour Institute at Mumbai in India

in the year 1998.

Diploma in Civil Engineering from Chandrapur Polytechnic Chandrapur at Chandrapur in

India in the year 1993.

High Secondary Certificate from Janata Mahavidyalay at Chandrapur in India in the year 1990.

Passed School Secondary Certificate from Mount Carmel Convent High School at Chandrapur in India in the year 1988.

Passed IELTS examination conducted by British University.

Training.

Completed Trainings on Safety Leadership, Work Permit System, Confined Space Entry, Deep excavation & Underground Facilities, Behavior Based Safety (BBS), Scaffolding Safety, Rigging Safety, Electrical Safety, Driving Safety, Accident Incident Reporting and Heat Stress.

Personal Profile

A highly skilled and motivated Construction Manager with 20 years of International experience in Project /Design Expertise developed through working with International organization at Oil & Gas/LNG/Petrochemical & Mining Sectors. I have knowledge and experience in Design, Procurement, Engineering and Construction, Precommisioning Sector and Project management which can assist in developing innovative, sustainable and cost-effective engineering solutions. I have been working in major industrial construction projects in remote locations and in extreme weather conditions of countries such as Kazakhstan, Angola, Kuwait & India for the last 20 years. An individual with ability to lead and make difficult decisions in fast moving and pressurized environment; now seeks for career move and join a forward thinking organization which offer room to grow and opportunities for development of career progression.

WORK HISTORY:

COUNTRY: KAZAKHSTAN.

COMPANY: KAZ MINERALS (KAZAKHMYS PROJECTS B.V.).

POSITION HELD: CONSTRUCTION MANAGER.

PERIOD: APRIL 2012– DECEMBER 2016.

PROJECT: BOZSHAKOL COPPER PROJECT.

SECTOR: MINING.

VALUE: $1.9 BILLION

Scope of Work:

Managing of Construction Contractor and supervising of supervisors, all Earthworks, Underground Utilities installation(including Micro-tunneling/Open Cut), Civil works, Structural steel works, Mechanical and Electrical installations

Construction of Primary Crusher, Overland Conveyor, Ore stockpile, Concentrator Facilities, Grinding and Flotation, Tailings Facilities, Moly Systems and Tailings Dam

Ensure Construction Contractors adhere to the latest approved of construction (AFC) project drawings, specifications, procedures and site instructions.

Coordination with Superintendents, Planners for planning of construction schedules, Weekly Planning updates and construction Look ahead.

Ensure Contractors comply with all aspects of the Project HSE Plan and policies, site regulations as per Clients safety procedures.

Installation of Giro crusher system, 40 ft. Ball Mill`s, Sag Mill, Flotation Cells and Pebble Crusher

Overseeing and executing all Construction activities on site

26 Km Main Access double and single carriage road construction, sub base and asphalt surfacing

35 km Railway project all earthworks, ballast placing and rail track works and station construction

Chair weekly Contractors progress meetings.

Managing multi – discipline projects from Earthworks, Underground Facilities,Civil construction, Structural Works, Piping installation, electrical works and mechanical installation, HVAC Systems.

RESPONSIBLITIES:-

1. To administer project procedures, programme discipline work loads, lead a team of

professionals from all disciplines to complete the project by complying with scope of

work and Specifications and provide technical advice and support in developing and

coordinating the required studies.

2. To represent the company in meetings with the client and present them with the

documents related to meetings.

3. To attend and coordinate weekly and monthly Site meetings.

4. To Control the flow of work controlling documents.

5. To ensure that project activities comply with company, Owner and Scope of Work

requirements and support overall engineering & construction schedule.

6. To coordinate and interface with various agencies including Third Party agencies,

vendors etc, during different phases of the project,i.e. from commencement

the project through to handover and close out.

7. To Evaluate data as to scope, effects on exiting installations, economic value, range

planning and budgetary considerations.

8. To resolve and involve in all technical related specifics, provide Solutions to technical

issues, provide technical support, to resolve and provide solutions related to interface

with various departments related to QA/QC, Safety, Estimation etc.

9. To Ensure project team have a clear understanding of contract and applicable

obligations.

10. To Monitor and evaluate the work of Engineers and drafting staff allocated to specific

projects to ensure that their technical competence and performance meet

requirements.

11. To set targets and goals to achieve the scheduled objective.

12. To identify, plan and set priorities so that the scheduled target can be achieved well

in advance.

13. To coordinate and interface with various departments to identify the lag in schedule

and advise corrective measures.

14. To Supervise the preparation of feasibility studies, surveys and reports, design

drawings, specifications, bills of materials and cost estimates.

15. To coordinate between various engineering departments to maintain prioritisation

within project schedule and to achieve project milestones with respect to project

schedule.

16. To Contribute directly to the resolution of technically difficult design problems and

Consult with engineering management to resolve policy and labour issues.

17. To manage vendors and contractor interfaces.

18. To maintain Project delivery as per schedule.

19. To interpret and raising issues regarding the implementation and constructability of

Design

20. To Provide inputs to Project Controls groups for progress monitoring and for

Establishing Budget estimates.

21. To prepare Daily, weekly and Monthly progress against current project schedule and

submit it to the authorities concerned.

22. To monitor, manage and ensure the change control.

23. To monitor and track delivery packages and design packages against current plan.

24. To identify the Project work which can be started as per the documents available and

Support the concerned department.

25. To write work procedures, ITPs, raise RFIs and prepare Punch List.

26. To Plan and Support the various phases of the construction by providing Technical

Advice and Construction Methods.

27. To estimate accurate cost management in line with project requirements.

28. To identify grey areas i.e. areas of concern and provide inputs and plan to solve

the issues.

29. To act as a Mentor, support and guide Personnel’s and if required provide necessary

Training for their development.

30. To complete the Project work by complying with all statutory corporate and

legislative requirements and procedures

31. To guide the documentation department in filing, preserving and maintaining the

documents in order for quick access and avoiding confusion.

32. To maintain the Quality and Safety Standards complying with the project contracts

and Scope of Work.

33. To ensure successful handover of the Project.

COUNTRY: ANGOLA.

COMPANY: TECHNOEDIF PROJECTOS (SUBSIDARY OF SIGMA GROUP).

POSITION HELD: CONSTRUCTION MANAGER.

PERIOD: OCTOBER 2007– MARCH 2012.

PROJECT: LOBITO LNG PROJECT.

CLIENT: SONANGOL.

SECTOR: LNG.

VALUE: $750 MILLION

SCOPE OF WORK: Demolition and Dismantling works, Dewatering, Earthworks (Top Soil Removal, Bulk Excavations, Filling, Embankment & Soil Stabilization), Cross country Pipe line installation, Marine/Jetty Construction Works, Construction of Spheres(3nos),LPG Bottling Plant, Water Tank, Pump House, Electrical Substation, Transformer Bay, Control Room Building, Administrative Building, Tank Farms, Wall Construction, Cable Duct Banks and Trenches, Retaining walls, Truck Scale System Station, Underground Utilities including Manholes, Pits and Reinforced concrete channel, Foundations for Platforms, Walkways, Sleepers and Supports, Pipe Rack, Gabion Walls and Road works.

RESPONSIBLITIES:-

1. To administer project procedures, programme discipline work loads, lead a team of

professionals from all disciplines to complete the project by complying with scope of

work and Specifications and provide technical advice and support in developing and

coordinating the required studies.

2. To represent the company in meetings with the client and present them with the

documents related to meetings.

1.To attend and coordinate weekly and monthly Site meetings.

4. To Control the flow of work controlling documents.

5. To ensure that project activities comply with company, Owner and Scope of Work

requirements and support overall engineering & construction schedule.

6. To coordinate and interface with various agencies including Third Party agencies,

vendors etc, during different phases of the project,i.e. from commencement

the project through to handover and close out.

7. To Evaluate data as to scope, effects on exiting installations, economic value, range

planning and budgetary considerations.

8. To resolve and involve in all technical related specifics, provide Solutions to technical

issues, provide technical support, to resolve and provide solutions related to interface

with various departments related to QA/QC, Safety, Estimation etc.

9. To Ensure project team have a clear understanding of contract and applicable

obligations.

10. To Monitor and evaluate the work of Engineers and drafting staff allocated to specific

projects to ensure that their technical competence and performance meet

requirements.

11. To set targets and goals to achieve the scheduled objective.

12. To identify, plan and set priorities so that the scheduled target can be achieved well

in advance.

13. To coordinate and interface with various departments to identify the lag in schedule

and advise corrective measures.

14. To Supervise the preparation of feasibility studies, surveys and reports, design

drawings, specifications, bills of materials and cost estimates.

15. To coordinate between various engineering departments to maintain prioritization

within project schedule and to achieve project milestones with respect to project

schedule.

16. To Contribute directly to the resolution of technically difficult design problems and

consult with engineering management to resolve policy and labor issues.

17. To manage vendors and contractor interfaces.

18. To maintain Project delivery as per schedule.

19. To interpret and raising issues regarding the implementation and constructability of

Design

20. To Provide inputs to Project Controls groups for progress monitoring and for

establishing Budget estimates.

21. To prepare Daily, weekly and Monthly progress against current project schedule and

submit it to the authorities concerned.

22. To monitor, manage and ensure the change control.

23. To monitor and track delivery packages and design packages against current plan.

24. To identify the Project work which can be started as per the documents available and

support the concerned department.

25. To write work procedures, ITPs, raise RFIs and prepare Punch List.

26. To Plan and Support the various phases of the construction by providing Technical

Advice and Construction Methods.

27. To estimate accurate cost management in line with project requirements.

28. To identify grey areas i.e. areas of concern and provide inputs and plan to solve

the issues.

29. To act as a Mentor, support and guide Personnel’s and if required provide necessary

Training for their development.

30. To complete the Project work by complying with all statutory corporate and

legislative requirements and procedures

31. To guide the documentation department in filing, preserving and maintaining the

documents in order for quick access and avoiding confusion.

32. To maintain the Quality and Safety Standards complying with the project contracts

and Scope of Work.

33. To ensure successful handover of the Project.

COUNTRY: KUWAIT.

CONSULTANT: FLUOR DANIEL

POSITION HELD: CONSTRUCTION SUPERINTENDENT/MANAGER.

PERIOD: FEBRUARY 2003 – AUGUST 2007.

PROJECT: KUWAIT OL2K PROJECT.

SECTOR: PETROCHEMICAL.

VALUE: $650 MILLION

SCOPE OF WORK: Obtain Work Permits, Demolition and Dismantling works, Dewatering works, Earthworks(Top Soil Removal, Mass Excavations, Filling, Embankment & Soil Stabilization), Underground utilities(Big diameter Pipelines including cross country pipelines)including Manholes, Pits and Reinforced concrete channel, Asphalt and Earthen roads, Fencing works, Pipeline, Protection of Slopes, Construction of Tanks (Fire Water & chemical), Wall Construction, Pump House, Electrical Substations, Ground and Elevated Flare with Radiation Fence, Runoff Ponds, interface works, Transformer Bay, Administrative Building, Fire Truck House, Tank

Farm, Cable Duct Banks and Trenches, Retaining walls, Boiler Foundations, Mat Foundations, pipeline works, Equipment Foundations,

Chemical Dosing Shed, Paving’s, Foundations for Platforms, Walkways, Sleepers and

Supports, Pipe Rack and Road works.

RESPONSIBLITIES:-

1. To administer project procedures, programme discipline work loads, lead a team of

professionals from all disciplines to complete the project by complying with scope of

work and Specifications and provide technical advice and support in developing and

coordinating the required studies.

2. To represent the company in meetings with the client and present them with the

documents related to meetings.

3. To attend and coordinate weekly and monthly Site meetings.

4. To Control the flow of work controlling documents.

5. To ensure that project activities comply with company, Owner and Scope of Work

requirements and support overall engineering & construction schedule.

6. To coordinate and interface with various agencies including Third Party agencies,

vendors etc, during different phases of the project,i.e. from commencement

the project through to handover and close out.

7. To Evaluate data as to scope, effects on exiting installations, economic value, range

planning and budgetary considerations.

8. To resolve and involve in all technical related specifics, provide Solutions to technical

issues, provide technical support, to resolve and provide solutions related to interface

with various departments related to QA/QC, Safety, Estimation etc.

9. To Ensure project team have a clear understanding of contract and applicable

obligations.

10. To Monitor and evaluate the work of Engineers and drafting staff allocated to specific

projects to ensure that their technical competence and performance meet

requirements.

11. To set targets and goals to achieve the scheduled objective.

12. To identify, plan and set priorities so that the scheduled target can be achieved well

in advance.

13. To coordinate and interface with various departments to identify the lag in schedule

and advise corrective measures.

14. To Supervise the preparation of feasibility studies, surveys and reports, design

drawings, specifications, bills of materials and cost estimates.

15. To coordinate between various engineering departments to maintain prioritisation

within project schedule and to achieve project milestones with respect to project

schedule.

16. To Contribute directly to the resolution of technically difficult design problems and

consult with engineering management to resolve policy and labour issues.

17. To manage vendors and contractor interfaces.

18. To maintain Project delivery as per schedule.

19. To interpret and raising issues regarding the implementation and constructability of

Design

20. To Provide inputs to Project Controls groups for progress monitoring and for

establishing Budget estimates.

21. To prepare Daily, weekly and Monthly progress against current project schedule and

submit it to the authorities concerned.

22. To monitor, manage and ensure the change control.

23. To monitor and track delivery packages and design packages against current plan.

24. To identify the Project work which can be started as per the documents available and

support the concerned department.

25. To write work procedures, ITPs, raise RFIs and prepare Punch List.

26. To Plan and Support the various phases of the construction by providing Technical

Advice and Construction Methods.

27. To estimate accurate cost management in line with project requirements.

28. To identify grey areas i.e. areas of concern and provide inputs and plan to solve

the issues.

29. To act as a Mentor, support and guide Personnel’s and if required provide necessary

Training for their development.

30. To complete the Project work by complying with all statutory corporate and

legislative requirements and procedures

31. To guide the documentation department in filing, preserving and maintaining the

documents in order for quick access and avoiding confusion.

32. To maintain the Quality and Safety Standards complying with the project contracts

and Scope of Work.

33. To ensure successful handover of the Project.

COUNTRY: KUWAIT.

COMPANY: COMBINED GROUP OF COMPANIES (CGC).

POSITION HELD: CONSTRUCTION ENGINEER.

PERIOD: OCTOBER 1999 - JANUARY 2003.

PROJECT: MINA AHMADI REFINERY CONSTRUCTION PROJECT/ KUWAIT SEWERAGE RENOVATION,SE/52.

CLIENT:KUWAIT NATIONAL PETROLEUM CORPORATION

SECTOR: OIL & GAS/INFRASTRUCTURE.

VALUE: $500 MILLION.

• SCOPE OF WORK: Checking Utility Drawings, Application of Work Permit, Scanning the

area for Utilities, Survey work, Micro-tunneling works, Earthworks, Open Trench Pipe

installation works,Demolition and Disposal of existing pipes and Roads, Dismantling and

Reinstatement of Steel Furniture’s, Reinstatement of Road, Daily Report Submission,

Precast Works, Quality Control Tests, Installation of Manholes, Earthworks, Asphalt and

Earthen roads, Fencing works, Pipeline, Protection of Slopes, Construction of Tanks

Farms, Spheres, Bullets, Pump House, Electrical Substations, Ground and Elevated Flare

with Radiation Fence, Runoff Ponds, interface works, Transformer Bay, Administrative

Building, Fire Truck House, Cable Duct Banks and Trenches, Retaining walls, Boiler

Foundations,Mat Foundations, pipeline works, Equipment Foundations, Chemical Dosing

Shed, Paving’s, Underground Manholes, Pits and Reinforced concrete channel,

Foundations for Platforms, Walkways, Sleepers and Supports, Pipe Rack, Road works and

Infrastructural Works.

RESPONSIBLITIES:-

(a) Demolition and Dismantling works-Demolition and Dismantling of Melamine Plant and Fire Truck House by implementing Project Safety Procedures. The demolished materials are disposed off to an area approved by the Owner. The dismantled materials are transported to the site as per advice of the Owner.

(b) Earthworks-1. General survey work such as fixing temporary bench marks, marking

battery limits, marking the contours and calculation of quantity in cut and fills.

2. Scanning the area by use of scanner and by referring to the utility drawings.

3. Scarification, Excavation, Filling activities as per project procedure and specifications,

to the required design level.

(c) Concrete-1.Construction of Reinforced mat foundations supporting various

pedestals embedded with anchor bolts, Walls, Paving, Trenches, Valve boxes, Pipe rack

foundations, Radiation fence foundations, Boiler foundations, Sleeper foundations Analyzer house, Tanks (foundations and ring beams), Chemical Dosing Shed, Fire Truck House etc.

2. Construction of Substations (4 nos) and Administrative Building including architectural

works.

(c )Road Works-1.Preparation of sub grade, sub base in compliance with project

procedures and specifications.

2. Application of Prime coat over sub base, installation of Base course, application of tack

coat and installation of Wearing course.

3. All quality related tests such as CBR, material testing, determination of Job standard mix density, density check of each mix and core tests.

(d)Pipeline works- 1.Preparation of bedding as per project specification and standards.

2.Installation of steel and FRP pipe lines of diameter 8,10,12,24,36,48,72,116 and 136 inches for seawater cooling, instrument air, firewater lines, plant air etc complying project specification and standards.

3.Laying of concrete pipes of diameter 16, 20 and 24inches for storm water.

4.Laying of HDPE pipes of diameter 16,24,36 and 48 inches.

(e)Structural Works-1. Erection of process plant in sulphur recovery unit including steel,

equipment erection, installation of piping and site finishing.

2. Erection of flare piperacks, ground flare including wall and elevated flares with derrick pumps, knockout drums and runoff pond equipment in flare area.

3. Erection of thermal oxidizer,flare for storage tanks and other equipment for storage.

4. Installation of special equipment such as elevated flares, multi point ground flares, rotating equipments, styrene monomer chiller unit etc.

(f) Quality-1. Compliance with corporate Quality Management Systems.

2. Ensuring compliance with Owner quality objectives.

3. Co-ordination of project audits and initiate post audit actions.

4. Preparation of Procedures, Inspection Test Plan, Final test packages as per system

numbers

5. Control of Document flow, maintaining Inspection Measuring Test equipment records.

6. Implement and control of all quality related requirements at site.

7. Reviewing the various laboratory examination results related to concrete, soil and

asphalt works.

8. Ensure that materials issued to construction site are correctly identified, complies with

specification and material traceability is being maintained.

9. Ensures that material quality test been conducted as per ACI, ASTM, AASHTO and BS.

10. Check the conformity with the quality control plan and obtain the relevant

documentation.

11. Raise Site Deficiency Report, Non-Conformance Report and also hold and reject Non-

Conforming materials.

12. Check, supervise and controls civil works, which covers the pipe racks, construction of

sulphur recovery unit, sub-stations, instrument and equipment stations, tanks, vessel,

compressor and pump foundations, pipelines etc.

INFRASTRUCTURE RESPONSIBILITIES :-

(a)Survey Work-1.Fixing Temporary Bench Marks with coordinates and elevations. 2.Marking layout for excavation and checking invert levels of manhole and slopes of pipes. 3.Marking layout for sinking of Shafts.

(b)Earthworks- 1.Checking underground utility drawings, scanning the area for detection of utilities, marking the area for excavation.2.Demolition and disposal of excavated pipes at the designated area.3.Checking the formation level, providing sand bedding for pipes

laying of pipes as per the design level and backfilling of pipes in layers as per project specification.

(c)Microtunneling works-1.Precast works for shafts of 600mm,900mm,1300mm,1600mm and 2000mm diameter. 2.Sinking of shafts to the required level, planning and making arrangements for the microtunneling drive.3. To oversee the maintenance works of the tunneling machine and its accessories.4.To order the required number of pipes for the drive, plan and make arrangements for the next drive.5. Conducting Air tests for water tightness in joints for pipes and to get approval from the Owner.

(d)Open Trench Pipe-1.To ensure proper barricading of the site.2. To prepare sand bedding for the pipes.3.Pipe laying to the required gradient and level.4. Conducting Air tests for

water tightness in joints for pipes and to get approval from the Owner.5.Backfilling of

Pipes as per specification and procedure.

(e)Reinstatement Works-1.Reinstatement of Asphalt at road crossings.2.Reinstatement of steel furniture’s and public property after the work is finished

(f)Quality Control Tests-1.To ensure the proper stacked soil with known Procter Value is used for the backfilling.2.To ensure the thickness of backfilling confirms to specification.3.To conduct quality control tests at each layer as per project specification.

4.To conduct air test between one manhole to another manhole.5.To check the temperature,

Viscosity, material data sheet and CBR for the asphalt.6.To ensure the concrete grade,

Various concrete tests confirms project specification.

COUNTRY: INDIA.

COMPANY: BHARAT HEAVY ELECTRICALS LIMITED ON CONTRACT BASIS.

POSITION HELD: CONSTRUCTION ENGINEER.

PERIOD: JULY 1997 - SEPETEMBER 1999.

PROJECT: HIGH VOLTAGE DIRECT CURRENT (HVDC).

CLIENT: MAHARASHTRA STATE ELECTRICITY BOARD.

CONSULTANTS: ASEA BROWN BOVERI (ABB).

SECTOR: POWER.

SCOPE OF WORK: Survey Works, Cast in Situ Piles, Earthworks, Piping installation works, Asphalt roads, Construction of Tanks, Pump House, Electrical Substation, Office Building, Transformer Foundation, machine foundations, Paving’s, Cable Trenches, Storm Water Pipeline, Retaining Walls grouting works, Quality Control Tests,Structural works and Fencing works.

RESPONSIBLITIES:-

(a) Survey Work-1.Fixing Temporary Bench Marks with coordinates and elevations.

2. Marking layout, centerline and elevations for foundations and other structures.

(b) Cast in Situ Piles- 1.Construction of Cast in Situ Piles of diameter 450m (400nos) as

per construction drawing issued.

(c) Earthworks-1.Excavation and backfilling of structures, pipelines and Cable Trenches as

per the construction drawings confirming to specifications and scope of work.

(d)Pipeline works: Installation of buried pipe line by the Open Cut methods.

(e) Concrete-1.Construction of foundations supporting various pedestals embedded with

anchor bolts, Walls, Paving, Trenches, Valve boxes, Overhead Tanks, Cable Trench and

Duct Bank Manholes, Foundation and wall of Retaining wall.

2.Construction of pavings and storm water manholes

3. Construction of Substation and Office Building including architectural works.

(f) Asphalt Roads- Construction of Asphalt roads as per project specification.

5) REFERENCES:

1) Name: Mr. ANDREW BATTESON. 1) Name: Mr. JONATHAN FRASER

2) Company: KAZAKHMYS. 2) Company: KAZAKHMYS.

3) Position: Project Director 3) Position: Safety Manager.

4) Relationship: Head of Department. 4) Relationship: Colleague.

5) Telephone: +770******** 5) Telephone: +770********

6) Email: **************@*****.**.** 6) Email: *********.******@***********.***

1) Name: Mr. ROBERT STOCKI. 1) Name: Mr. WILFRIED PIRZL

2) Company: KAZAKHMYS. 2) Company: KAZAKHMYS.

3) Position: Project Manager 3) Position: Construction Manager.

4) Relationship: Senior Manager. 4) Relationship: Immediate Manager.

5) Telephone: +1-250-***-**** 5) Telephone: +770********

6) Email: ********@*****.*** 6) Email: *****.*@****.**.**

1) Name: Mr. ALBERTO C. CADIANG. 1) Name: Mr. JOSEPH T. BALAMBAN

2) Company: KAZAKHMYS. 2) Company: KAZAKHMYS.

3) Position: Piping Superintendent 3) Position: Mechanical Superintendent.

4) Relationship: Colleague. 4) Relationship: Colleague..

5) Telephone: +63-919-***-**** 5) Telephone: +639*********

6) Email: *********@*****.*** 6) Email: **************@*****.***

1) Name: Mr. PETER HEINS 1) Name: Mr. STEVE ALLEN

2) Company: TECHNOEDIF PROJECTOS. 2) Company: TECHNOEDIF PROJECTOS.

3) Position: Project Manager. 3) Position: Project Engineer

4) Relationship: Senior Manager. 4) Relationship: Colleague.

5) Telephone: +244******* 5) Telephone: +244*******

6) Email: *****.*****@*****.***../Downloads/********@*******.*** 6) Email: *********@*****.***

1) Name: Mr. DAVID TODD. 1) Name: Mr. Wayne Harrison

2) Company: FLUOR DANIEL. 2) Company: FLUOR DANIEL

3) Position: Project Manager. 3) Position: QA/ QC Manager

4) Relationship: Head of Department. 4) Relationship: Owner.

5) Telephone: 965-***-**** 5) Telephone: 965-***-****

6) Email: *****.****@*******.*** 6) Email: *****.********@*******.***../Downloads/********.*****@*****.***

2)PERSONAL DETAILS:

Name : Mr. MANOJKUMAR THEKKEDATH.

DOB : 14th June 1972.

Sex : Male.

Nationality : Indian.

Height : 181 cms.

Weight : 82 kgs.

Languages Known : ENGLISH, ARABIC, HINDI, MARATHI and

MALAYALAM. Basic Russian language

Passport Number : Z3696830 (Valid till 13/03/2026).

Driving License : Light Motor vehicle, State of Kuwait/India/Kazakhstan

I hereby declare that all the information furnished above is true to my Consideration and

Belief.

NAME: MANOJKUMAR THEKKEDATH.

PLACE: INDIA



Contact this candidate