Post Job Free

Resume

Sign in

Supervisor Drilling, Completion, Work over and P & A

Location:
McComb, MS
Posted:
January 25, 2017

Contact this candidate

Resume:

Billy Mullins

Drilling, Completion, Work over and P & A Specialist

P.O. Box 100

Springfield, LA 70462

985-***-**** acyhay@r.postjobfree.com

PROFESSIONAL EXPERIENCE

Over thirty years of experience in the petroleum industry, extensively experienced in drilling and completion, work over and P&A on all different types of wells; Deepwater Drillships, semisubmersible, Land, under-balanced horizontal, Jack-up and Inland Barges. Fifteen years as Drilling and Completion Foreman Consultant. Four years as Superintendent of Operations, Consultant for deepwater pilot test drilling program with Shell Oil. Up to date on new drilling regulations with strong HSE, Live safe values and leadership skills. Good understanding and working relationship with regulatory agencies. Experience with coordination and logistics to run the complete operation.

WORK HISTORY

Marubeni -- Senior Drilling & Completion Supervisor 2014 - 2015 Noble Driller

• Well A-2 Green Canyon 112 • Total Depth 17,300 ft.

• Cut & Pull Casing, Side Track, Drill, and Complete

• Move rig to Green Canyon 155

Noble Driller

• Well Manatee MA002 Green Canyon 155 • Cut & Pull Casing, Side Track, Drill, and Complete • Total Depth 17,887 ft.

Noble Driller

• Well Angus MA003 Green Canyon 113

• Replaced completion string + SCSSV/Re-dress and change out tree • Sub Sea Tree Work, Pull and Replace Production Tubing

• Total Depth 15,717 ft.

EnVen Energy Ventures -- Senior Drilling & Completion Supervisor 2013 Hercules 209 Jack-up rig

• Well SS-155 -1 Sidetrack 1 & 2

• Secure platform and wells for operations, well bent approximately 5.5 degrees cut caisson and move well toward center, N/U and sidetrack well to 12,500 non productive

• Sidetrack well ST-2 to 12,126 MD, Found productive pay sand, Run Enventure casing patch.

• Complete well with High rate water pack, Turn well over to production/De mob and move rig

.

Dynamic Offshore Resources -- Senior Drilling & Completion Supervisor 2013 Hercules 209 Jack-up rig

• Mobilize tugs and move rig to SMI-41 well #16

• Secure rig for safe operations in Federal waters

• Spud well and drill to 5000’ with Mud line Suspension system/spud mobilize tugs H & P 206 Platform rig • Water

depth 1,353 ft.

• Bullwinkle Platform, Green Canyon 108 well A-21 14,541’ MD 11,684’ TVD

• Drill and complete directional well, SBM utilizing barite and fluid recovery system.

• Maintain safe work environment and build team work environment. Ensco 81 Jack-up rig

• SS-301 A-3 ST-1, 11,740’ MD, 10,000’ TVD

• Water depth of 262’ Mobilize tugs and move rig to SS-301 A-1 and secure for operations.

• Drill and complete directional well, WBM utilizing GT-3000, with barite recovery system.

• High pressure 18 ppg WBM and 18ppg completion fluid. Dynamic Offshore -- Senior Drilling Supervisor 2012 Ensco 81 jack up rig MP-116 # 10

• Assume responsibilities after storm caused MP-116 # 9 drive pipe to collapse. • Mobilize Divers and access damage from storm, Drive pipe broke and laid over 2’ above mud line.

• Skid rig over and begin new well operations.

• Drill MP-116 # 10 13,000’ MD. Run Drive pipe, Spud well and drill with WBM

• Drill and complete directional well.

Mobile Block 861

• PBTD- 21,682’ Perform re-entry operations with Mako.

• Map tool and evaluate operations necessary to repair. Spartan 202 Jack-up rig

• MP-116 # 9 –New drill 13,001 MD

• Mobilize tugs and move rig to location. Secure rig for safe operations in Federal waters. • Install 30” drive pipe. Rig stability problems. Move off location.

• Mobilize tugs and move rig to Mobile block 861 and prepare for P&A operations. H & P 206 Platform rig

• Bullwinkle Platform, Green Canyon 65 well A-20

• Water depth of 1,353’ TD-13,263’

• Mobilize equipment at Houma yard and Install rig on platform.

• Modify platform to allow for access of new drill operations. Assist with rig-up operations. Install Platform Diverter system. • Spud well run 18 5/8”, drill & run 13 3/8” casing, CMT & install well head. Drilling Supervisor -- Chevron USA – Lead DSM 2012

• Discoverer Inspiration – Enhanced Enterprise class Drillship

• Well- St. Malo

• Water depth 7000’ • Drilled to 28,276’ TD well with full recovery of 210’ of Production zone core samples. Wilcox zone.

Drilling Supervisor -- Chevron USA – Lead DSM 2012

• Discoverer India-– Enhanced Enterprise class Drillship • Bigfoot Batch set operation.

• Jet in 36” on A-6,A-14 and A-11

• Water depth- 5190’

• Drilled A-6, A-14 & A-11 to casing point 26” PDC Power Drive assembly. (in salt ) with salt saturated OBM, run 22” casing and CMT same.

Drilling Supervisor -- Chevron USA – Lead DSM 2012

• Clear Leader – Enhanced Enterprise class Drillship

• Well- WR-758- Jack PS004 Planned TD- 28,592

• Encountered Tar @ 24,710’ drilled through and encountered 2nd tar zone @ 24,995 Drilling Supervisor -- Stone Energy 2011

• Ship Shoal 112 OCS-G 00066 # Q1ST2 • Mobilize Hercules 204 Jack-up and spot on location

• Secure safe working conditions to platform.

• Pull old completion and sidetrack well, TD- 9,476

• Run completion, Frac and bring well on line for production Drilling Supervisor -- Stone Energy

• BM-5 SL-16255 #1

• Set up logistics and move rig to new location

• Hercules 204 Jack-up rig

• Pulled dual completion

• Perforate upper zone, Frac and run upper completion

• De-mobe rig and turn over to production

Drilling Supervisor -- Anadarko Petroleum Corp

• Desoto Canyon 620 #1 ( Spiderman #2 )

• Subsea Work over-SCSSV Replacement

• OCS-G 23528 Water depth-8055’/TD 17,743

• Rig- Ensco 8500 DP

• R/U Schlumberger Sen Turian Equipment

• Abandon MM-7 lower sand, Run upper completion

• Flow-back well flow testing and clean-up.

Drilling Supervisor -- Anadarko Petroleum Corp

• Keathley Canyon 875 #1

• Flow test for reservoir evaluation

• Rig- Ensco 8500 DP

• TD- 12,767’ water depth- 7120’

• R/U Schlumberger Sen Turian Equipment and

• Corrodinate logistics with 110,000 bbl flow-back

• Barge and tugs

Drilling Supervisor -- Anadarko Petroleum Corp

• Viosca Knoll Block 826 # 14

• Neptune Spar well #A-4, A-6,& A-1, OCS-G-6888

• T & A wells with Nabors P-10 rig

• TD 12,370’ MD, 9,220’ MD’ and 12,100’MD

• Pulled Wellhead, hanger, Tubing and Mudline packer.

• Removed riser to allow access of hull for repairs on all wells.

• Coordinate logistics utilizing work boats for deck storage.

• R/U & work with mixed gas divers required for operation.

• Performed Plug and abandonment as per BOEMRE and Anadarko.

• De-Mobe and backload rig & equipment from platform Stone Energy Corp 2011-2010

• Ship shoal 113 block # 93

• Bronzeye Popper OCS-G 00089 well # G-2

• Ensco 99 Jack up rig • Spud, drill and complete directional well to 13174’ TD

• 0 discharge with OBM

Drilling Supervisor -- Maritech Resources 2010

• Parker 12B, Inland Barge Rig

• Timbalier Bay Field

• SL 192 Well #333 and #336

• Lafourche Parish, La

• Move rig in on location

• Spud well and drill directional well to TD 7881’.

• Complete and Flowback well for production

Drilling Supervisor -- Maritech Resources 2010

• Parker 12B, Inland Barge Rig

• Timbalier Bay Field

• SL 192 Well #334

• Lafourche Parish, La

• TD 8238’

• Move rig in on location and secure for Hurricane Season.

• Spud well and drill directional well to TD.

• Complete and Flowback well for production

Drilling Supervisor -- Maritech Resources 2010

• Well #34

• Lafitte, La

• Parker 12B, Inland Barge Rig

• Move rig in on location, spud well & drill directional well to 8014’TD.

• De-mobe rig and move off location to Timbalier Bay. Drilling Supervisor -- Anadarko Petroleum Corp 2010

• Viosca Knoll Block 826 #14

• Neptune Spar well #A-14, OCS-G-688

• T & A well with Nabors P-10 rig

• TD 12,370

• Pulled tbg and removed riser to allow access of hull for repairs.

• Coordinate logistics utilizing work boats for deck storage.

• R & U work with mixed gas divers required for operation.

• De-mobe and backload rig from platform for Hurricane Season. Drilling Supervisor -- ERG Resources, LLC 2010

• J. Wilburn C-9 Well #9 E-8

• Barber’s Hill Field – Chambers County, Texas

• TD 4,951’, Directional Well in Salt Stk-3

• Drilled directional well to TD, logged, and ran csg for completion/De-mobed, then moved rig Diasu Oil

& Gas Co. 2010

• L L & E # 290 Leeville Field Lafourche Parish, Louisiana

• Prepared location, Move rig in, direct and supervise operations and move rig off

• TD 14,250’, Directional Well

• Parker 15 B Inland Barge Rig

• Move basic rig 10 in on location and pull tubing. De-mobe basic rig 10 and move off location and to yard.

• Mobilize tugs and move Parker 15B inland barge rig in on location.

• Sidetrack well, Drill directional to 14,065’. De-mobe rig and move off location. Drilling Supervisor -- Diasu Oil & Gas Co. 2010

• L L & E # 2 Leeville Field Lafourche Parish, Louisiana

• Prepared location, Mob and De Mob rig.

• TD 11,388’

• Basic 10 Inland Barge Rig

• Replace 2 3/8” tbg, Pkr and Pump assembly. Test and turn over to production Drilling Supervisor -- ERG Resources, LLC 2010

• L L & E # 290 Leeville Field Lafourche Parish Louisiana

• Parker 15 B Inland Barge Rig

• Moved rig on location, Sidetrack and complete

• TD 14,400’, Directional well ( 0 discharge operation ) Drilling Supervisor -- Anadarko 2009 •

Nansen East Break 602 #7 OCS G 14205

• Ocean Valiant Semi-Submersible

• Moved rig on location, De-Complete, Sidetrack, Complete well and De-mobe rig

• TD 12,500’ directional well with water depth of 3650’ Drilling Supervisor -- Anadarko 2008-2009

• Drysdale East Break 599 #4 OCS G 19028

• Ocean Valiant Semi-Submersible

• Moved rig on location and worked from jet in through sub-sea completion.

• TD 11,000’ 70 degree Directional well with water depth of 3300’ Drilling Supervisor -- LLOG Exploration 2008

• Green Canyon 141 OCS-G 21785 #2 Exploration Well

• Ocean Saratoga Semi-Submersible

• Worked from spud T/TD, Directional well

• TD 16,000’ water depth 1075’ drilled to TD

• Successful logging and core samples, T & A well, Good well. Drilling Supervisor -- LLOG Exploration 2008

• Garden Banks 378 OCS-G 24488 #3 Directional Well

• Noble Lorris Bouzigard, Semi-Submersible

• Water depth 2045’

• Shallow gas well 6,000’ TD

• Drilled and completed in Record time

LLOG Exploration 2008

• BP America #1

• Acid Frac Completion, Cameron Parish, La.

• Performed land type job on a well in the marsh

• Coordinated all equipment and personnel Mobe & de-mobe operation.

• 16,500 foot gas well production dropped to 500,000 cfpd.

• After Frac, production increased to 4.5 mcfpd

• Performed flow back procedure to evaluate production Drilling Supervisor -- LLOG Exploration 2008

• Main pass 107

• Hercules 252 Jack-up Rig

• Drilling 15,000 directional well

Drilling Supervisor -- Meritech Resources 2007

• Drilled four (4) directional wells on board the Hercules I, Inland barge rig (Kelly type) in South Timbalier Bay. Lafourche Parish, La.

• Drilled one (1) 14,000 foot directional well with 1 sidetrack on board the Hercules 48 Inland barge rig. South Timbalier Bay, Lafourche, La.

• Moved rig on location and secured for storm season.

• Coordinated and maintained evacuation procedures during storm season. Drilling Supervisor -- Petsec 2007

• Supervised De-Mob and Load out of rig and related equipment. Thibodaux, La.

• Supervised environmental cleanup and worked with land owners. Drilling Supervisor -- Energy XXI 2006-2007

• Drilled, completed, and workover wells on board the Hercules 20 Jack-up rig in the South Timbalier area.

Night Drilling Supervisor -- Plains Exploration and Production 2006

• Drilled 15,000 foot exploratory well on board the Nabors BR 300 Inland Barge rig in the Tabasco Prospect area

.

Night Drilling Supervisor -- Energy Partners LTD 2006

• Drilled and worked-over two wells on board the Nabors DT-106 Jack-up rigs in the South Pass area. Drilling Supervisor -- Plains Exploration and Production 2003-2005

• Drilled and completed 2 under-balanced wells on the Nabors 206 land Rig in the Kenny Lee Dyess and Sessions area. In east Texas area

• Drilled and completed 2 wells on board the Axxis Independence Inland Barge rig in the Queen Bess area. Lafitte La.

• Drilled wells on board Nabors 302, Land rig; with HTHP and using high mud weights in the Ferrari area. Houma, La. • Drilled exploratory wells on board the Bouzigard, semi-submersible rig in water depths of 3,000 feet.

Night Drilling Supervisor -- POGO 2003

• Drilled exploration wells on board the Ocean Quest Semi-submersible rig in water depth of 1,100 feet. Superintendent of Operations / Project Manager, Bulk Mixer Inc. 1995-2003

• From 1999-2003 I served as Superintendent where I designed and constructed a permanently installed mixing system for Shell Oil on their Noble Jim Thompson Semi-submersible rig. • This piece of equipment was vital in achieving TD with logs of 33,200’.

• From 1995-1999 I served as Project Manger where I designed and constructed a portable mixing system.

• Developed and operated a pilot test program for Shell Oil.

• Also coordinated with drilling parameters and monitored drilling performance. REFERENCES

Pat Weaver – Sr. Drilling Superintendent, GOM & International Anadarko Petroleum Corp. Office – 832-***-****

Cell – 281-***-****

Tom Slatter – Drilling / Completion Engineer

Tallos Energy

Cell – 713-***-****

Greg Courtney– Operations Superintendent

Marubeni Oil and Gas

Cell – 985-***-****

Locations: Gulf of Mexico, Louisiana, East Texas

Operators: Anadarko, Shell Oil, PXP, Maritech Resources, Stone Energy, Energy XXI, LLOG, Dynamic/Sandridge Offshore, EnVen Energy, Marubeni Oil & Gas USA Rig Experience: Semi-submersible, Jack-up, Inland Barge, Land Rigs, Drillships and Spars Education: High School graduate

Industry Training: Murchinson Drilling School IADC well cap 2 week course, Randy Smith 5 day IADC well cap course, Helicopter Safety and Survival Capsule, Well Control School Certificate, Waste Management, Environmental Compliance awareness, Industrial Fire Fighting, Hurricane Procedures, Lockout / Tagout Procedures, Mud Management, Rigging and Welding. Up to date on new regulations.



Contact this candidate