Post Job Free
Sign in

Project Management

Location:
Tomball, TX
Posted:
January 24, 2017

Contact this candidate

Resume:

VICTOR O. LAWAL

Houston, Texas 713-***-**** *************@*****.***

Professional Summary

Analytical and organized Project Scheduler with 6 years career experience in the Oil & Gas Industry. Highly adept in pipeline analysis and scheduling gas price indexes and profitability strategies. Demonstrates excellent communication and problem-solving skills.

SKILLS Highlights

• Primavera P6 • Risk Safety Standards

• MS Project • Strong organizational skills

• PowerPoint, SharePoint, Excel • Machinery Assembly • Quality Controls/ Assurance • Microsoft Office Suite expert

• Critical Path Method (CPM) Scheduling • Execution Scheduling

• Production Line Efficiency • Management information systems

• Process improvement • Productivity improvement

EDUCATION/Certification

Near East University, Nicosia, Cyprus October 2011

Associate Degree: Management

Innovative Management Solutions May 2016

Primavera P6 Fundamentals Certificate

PROFESSIONAL EXPERIENCE:

Honeywell Aerospace 09/12/2015- Contract

Production Scheduler/Planner

Responsible for managing the day to day job scheduling activities and coordinating activities using SAP and MS Project

Met with team members to gain understanding of task detail to better schedule time and budget.

Assist in the continued indoctrination of planning and production personnel in the planning and scheduling process

Input production resource data into Open Plan software

Supports ability for timely delivery and mitigates loss and damage by performing address searches/corrections through various sources and ensuring packages are in good condition for the customer

Works closely with production supervision and plant personnel to ensure product is produced and packaged to meet customer requirements.

Strong knowledge of MS Office software (including Excel and Word).

Axon Energy Products 03/07/2016- 08/12/2016

Operation Admin- Houston, Texas

Coordinated and expedite the flow of work and materials within or between work centers, capacity and priority planning and re-planning.

Determined material requirements utilizing MRP data and recommend purchasing or manufacturing of components as necessary.

Created timetable and schedule for all projects.

Suggested modifications for individual projects to conform within budgets and time lines.

Coordinated meetings with Project Managers team members and applicable third parties.

Reviewed plans or schedules of workload in the rough-cut capacity stage and respond in advance to periods where workload is significantly greater than capacity available.

Parker PGI 10/6/14 – 02/19/16

Project Scheduler-Houston, Texas

Developed project schedule plan with Primavera P6 and MS project

Used Primavera P6 to development of fully resourced and cost loaded project programs using client work breakdown structure against data provided by the project management team.

Provide progress updates as required by each Project Manager in accordance with work instructions and to create reports on cost and schedule.

Developed, prepare and maintain project schedules through all project phases; such as Select, Define and Execute.

Delivered status reports to stakeholders for budgeting and planning purposes.

Maintained solid communication with effective time-management skills and self-reliance to accomplish goals.

Monitored team progress and enforced deadlines.

SharePoint document management

Create and revise schedule templates based on project type and scope, detailing the sequence of all work to be performed.

Developing estimated cost for scope items based on work steps identified.

Builders First Source 5/9/2013 -10/24/14

Project Scheduler / Coordinator – Houston, Texas

Developed and maintained detailed plans with P6 and MS Project

Assist in development and implementation of project scheduling procedures appropriate for the project, which are in compliance with company requirements.

Reviewed job plans for accuracy and clarity, clear scope of work, correct resources and working hours, realistic completions date, proper lead times, correct equipment identification, proper charge number/coding and proper authorization

Slashed payroll/benefits administration costs 30% by negotiating pricing and fees, while ensuring the continuation and enhancements of services.

Accountable for effective and efficient project resource forecasting, utilization and management and work closely and effectively in a coordinative fashion with Sr Project Managers, team members, customer resources, and other 3rd party providers.

Proven background in the business environment; either managing or building, etc.

Monitored costs, timescales and resources used to achieve project and determine durations for each step.

Assist Contractors in understanding Contract Schedule Requirements and evaluate the contractor’s schedules against those requirements as a part of the bid evaluation process.

Responsible for continuously expanding and updating professional knowledge and honing training skills in order to enhance individual and team innovation and productivity

Hewlett Packard (HP) 1/6/12 - 4/10/13

Project Coordinator–Houston, Texas

Developed and maintained detailed plans with MS Project

Lead or direct the set up and reviews of the project controls status (i.e. cost contract, WBS, schedule, resources, etc.)

Analysis of project critical path and evaluation of problems and potential corrective measures

Develop Work Breakdown Structure and activity coding.

Leading scheduling efforts on large and/or multiple projects

Develop and/or incorporate schedule information from vendors (design, IT/AV, FF&E, security, move management, etc.) with general contractor schedule and master program schedule.

Perform diversified assembly operations to assemble intricate or large apparatus, machines, or equipment to close tolerances and inspection requirements.

Assembles small & large components to combine servers into racked solution per customer specifications.

Responsible for building servers, storage, switches, power distribution units, weight balancers, and associated cabling into a rack.

Verify proper components are received per order pick list prior to build.

Use online methods and work instructions to build racks per customer specification.

Analyze and resolve work problems, and/or assist coworkers in solving work problems.

AKOO COMMUNICATIONS 2008- 2011

Product inspector –Lagos, Nigeria

Tested electronic and computer component for any malfunction.

Adhered to policies and regulations while working on the floor or in the back rooms

Fixed or repaired any faulty or malfunctioning component to make it work properly.

Complied with all safety and guidelines while handling machinery either by myself or with other coworkers



Contact this candidate