Post Job Free

Resume

Sign in

electrical tester

Location:
Morden, Greater London, United Kingdom
Posted:
January 21, 2017

Contact this candidate

Original resume on Jobvertise

Resume:

CURRICULUM VITAE

PERSONAL DETAILS

NAME COLIN MALCOLM HEATH

ADDRESS ** *** *****, ******, ****** SM4 6DY

TELEPHONE HOME- 020*-***-**** WORK- 078**-******

E-MAIL acyd9x@r.postjobfree.com

D.O.B. 22/05/63

NATIONALITY BRITISH

STATUS MARRIED

DRIVING LICENCE FULL/ CLEAN

NI NUMBER NA 958892A

HOBBIES MOUNTAIN BIKING & RUNNING

COMPUTER LITERATE EXCEL, PROJECT, WORD, OUTLOOK, POWERPOINT

BACKGROUND

After leaving general education I decided early on a career in

engineering or construction would be the right move. I went to an

excellent technical College which gave me a good platform which to

work from. I then went to University to study Electrical and

Electronic Engineering. I completed the three years satisfactorily,

which included an Industrial year. Due to bereavement in my immediate

family circle, I failed my final Year.

I now have developed a career as a fully qualified J.I.B. Approved

Installation Electrician where I have specialised as a L.V (2391) Test

Engineer. I understand the responsibilities of a designated competent

person and I am familiar with all associated permits, risk assessments

and method statements. I am familiar with the (S.S.O.W. - Safe Systems

Of Work) including Safe Isolation Procedures, Warning Notices &

Proving Dead Electrical Supplies.

I am a competent Electrical Inspector who is qualified to qualifying

manager status for NICEIC certification. I can analyse a breakdown on

an electrical installation, into its constituent parts and grade any

departure from the 17th Edition Regs in order of its likely hood to do

harm. I can also organise as well supervise electrical competent

testers, or electricians to operate in safe and organised manner when

collating test results for an installation whether it is a Periodic

Inspection, a Conditional Report or a full test. The conditional

report is looking for wear and tear: damage & deterioration including

excessive loading, type of wiring system and earthing & bonding

arrangements.. The classifications for severity of the electrical

faults, to do harm, found, are important to reduce any risks

discovered by the inspection process.

I have also run a small number of contracts as a Supervisor. I am

a competent and experienced 17th edition Electrician and have erected

different types of cable management systems in accordance with BS7671,

the Electricity & Work Act and also the Health & Safety Act. I

specialise in working in the Commercial and Industrial sectors of

Electrical engineering. I try to perform to a high standard of

workmanship, organise well, motivate and deliver in a fast track

environment within targets and on budget. I can adapt to a wide range

of briefs and environments and have a wealth of experience to see

projects through to the end. I work well as a team player and equally

well as a team leader. I am an effective and clear communicator of

ideas. I also understand the responsibilities that this role would

entail.

I have also maintained electrical control systems from SCADA as a

Maintenance Electrician Ensured operation of electrical systems and

equipment by completing preventive maintenance requirements on

shredders, conveyors, programmable controllers, transformers, voltage

regulators, and machinery wiring; following electrical code, manuals,

schematic diagrams and blue-prints

I have just sat the new LUCAS (London Underground Card Access Scheme)

test at Ashdown House, also have PTS (Personal Track Safety) Rail card

that are currently valid. Finally, I pride myself when working in the

health, rail, industrial & commercial sectors, where I have gained a

wealth of experience from previous projects I have supervised and

installed when on the tools. My Drugs & Alcohol ticket certificate is

in date as I passed at Medical Express in Rotherhithe. I have also

gained the CITB (Construction Industry Training Board) Site

Supervisors Site Safety. This certificate allows be to take charge of

similar tradespersons and ensure all Health & Safety requirements are

met for the group, the individuals and the Company policy. I am open

to offers from Construction Companies that are a bit `light` in the

Electrical area, who could do with a strong player on their side to

ensure complete compliance from there nominated electrical

subcontractors' they may have possible issues with. I can produce all

documentation and qualifications on demand. I have a good

understanding of (ACOPS) approved code of practices concerning Health

& Safety. I have a thorough understanding of Memorandum of Guidance on

the Electricity at Work Regulations 1989. I am also aware of the HSE

and electrical safety. Under UK law the Health and Safety at Work etc

Act 1974. I am flexible in my work patterns, whether your requirements

are night shifts, evenings, weekends or engineering hours. I have a

company called CMH electrical Ltd, which can be used as a vehicle for

payment. I only want sub-contractor roles and can be found on My

Builder website for any P J's.

WORK HISTORY

Sep16-Jan16

LUL Electrician T.Clarkes B.U.C.S. Bank Station

Upgrade

Installation of C.M.S. for power, data, and control wiring in Locker

room and tray, trunking and conduit for power& lighting Hi level.

Installation of conduit for Fire Alarm systems &

Voice, Data & Lighting including emergency . Stripping out existing

circuits in the ticket office sterilising it for demolition. Surveying

existing circuits for Lighting, Emergency lighting, 110v transformers,

PA loudspeakers & Fire Alarm in multi-compartment trunking with

conduit stab offs.

Aug16- Sep16

LUL Electrician Kellys Bank

station

Installation of C.M.S. for power, data, and control wiring on

platform and tray, trunking and conduit for power& lighting Hi level.

Installation of conduit and trunking systems & power

Voice, Data. Behind hoarding.

Aug15- Jul16

LUL Electrician Bailey Rail Tottenham Court Rd

Industrial electrician installing C.M.S (Cable Management Systems) .

Installation of containment to ceilings, including sub frame, ladder

rack, trunking, basket, tray and trapezium bracketry to ceiling to, in

accordance with LUL specifications

Wiring of lighting & power circuits with lsf(LOW smoke Fume) cable

terminating circuits at the load & distribution board mcb`s (Miniature

Circuit Breakers). Mounting 3 Phase distribution Boards.

Sep15- Oct15

Authorised person/ Tester LV Systems MORGAN STANLEY

CANARY WHARF

PHOENIX ELECTRICAL

Testing of Power & Lighting Circuits from Distribution Boards.

Conducting Dead & Live Tests for Clients Witness. Authorised to Switch

Distribution Boards from Main Panel. Tested LCM

(Lighting Control Modules). Fault Finding & Rectification & repair

when required. NICEIC standards met with paperwork & Testing &

Inspection. Supervised 6 no Testers and programmed them with Schedules

to complete their testing briefs. Mardix panels were installed and all

terminations were tested and inspected. Testing of Low voltage

Lighting & Power systems and final circuits, on 3 phase Main

Distribution Boards. Recording Test data Results, Live & Dead on 17th

edition Regs N.I.C.E.I.C. sheets. Testing Main M.C.C.B. Panel

Distribution Board for Sub Mains. Fault finding when Dead and Live

testing, including damaged cables, wiring faults due to polarity &

short & open circuit. Insulation Resistance, Continuity checks & Live

Testing for Earth Loop, R.C.B.O. Disconnection Times all checked &

Compiled.

Aug15- Sep15 END SYSTEMS LTD

N.I.C.E.I.C Tester GREENFORD 45 FLATS & COMMUNAL AREAS, PLANT RM, RETAIL

Aug15- Sep15. Authorised to Switch Distribution Boards from Main

Panel.

Fault Finding & Rectification & repair when required. NICEIC standards

met with paperwork & Testing & Inspection. Sub Main documentation.

Complete package with results uploaded for client inspection and

reproduction, on software.

Jul15 - Aug15 SOUTH WEST TRAINS WHEEL LATHE DEPOT

JIB APPROVED PTS ELECTRICIAN WIMBLEDON CAIRN CROSS GROUP

C.M.S (Cable Management Systems) for power, data, and control

wiring in dc switch room and tray, trunking and conduit for power&

lighting Hi level. Installation of conduit for Fire Alarm systems

&Voice, Data. (with PTS) installing Installation of trunking, tray,

ladder rack & conduit, in accordance with British Rail specifications.

Wiring of lighting & power circuits with lsf(LOW smoke Fume) cable

terminating circuits at the load & distribution board mcb`s (Miniature

Circuit Breakers). Fault finding on lighting circuits in offices.

Jun15- Jul15

NIGHT SHIFT T CLARKES SELFRIDGES OXFORD

ST

Verification & Surveying of L.V. cables which come from Sub Station to

supply various Distribution Boards on Ladder rack. Stripping out of

old feeds from ladder racks with hydraulic

Cutters. Installation of ladder rack containment for new feeds.

Installation of containment to ceilings, including sub frame, ladder

rack, trunking, basket, tray and trapezium bracketry to ceiling and

walls.

Apr15-May15

2391 Commercial Electrical Tester & Inspector

HORSENDEN & MANDIVILLE SCHOOL

GREENFORD FOR CS CONNECT

Testing of Low voltage Lighting & Power systems and final circuits, on

3 phase Main Distribution Boards & Single Phase Consumer Unit Type.

Recording Test data Results, Live & Dead on 17th edition Regs

N.I.C.E.I.C. sheets. Testing Main M.C.C.B. Panel Distribution Board

for Sub Mains. Fault finding when Dead and Live testing, including

damaged cables, wiring faults due to polarity & short & open circuit.

Insulation Resistance, Continuity checks & Live Testing for Earth

Loop, R.C.B.O. Disconnection Times all checked & Compiled.

.

Dec14-Apr15

2391 Commercial Electrical Tester & Inspector

BANCROFT LTD CANADIAN

EMBASSY, KMPG, AEON INSURANCE

Testing of Low voltage Busbar Lighting & Power systems and final

circuits, modular or otherwise.. Main distribution Testing on all

panels and plug in Tap offs on rising Busbars. Recording Test data

Results on Amtech Software for 17th edition Regs. Uploading data to

Company sever. Doing Cable Calcs for design. Compiling a defects list

on Snagger Tracker for rectification. Fault finding when dead and live

testing. Demonstrating electrical systems compliance to Building

Services Engineer. Assisting Qualifying Supervisor on NIEIC

inspections. Compiling validation reports for design requirements.

Nov14 -Dec14 KEMADA

THREE BRIDGES NETWORK RAIL

Industrial PTS Electrician

Installation of containment to ceilings, including sub frame, ladder

rack, trunking, basket, tray and trapezium bracketry to ceiling.

Installation of DADO trunking to walls for power and lighting points.

Wiring of all power and lighting circuits with singles and mounting of

3-phase distribution boards.

Oct14 -Nov14

Industrial Electrician LUL GIFFEN GROUP EMBANKMENT

STN

Installation of C.M.S. for power, data, and control wiring in dc

switch room and tray, trunking and conduit for power& lighting Hi

level. Installation of conduit for Fire Alarm systems &

Voice, Data.

Sep14 -Oct14

Electrical Tester WEST & WEST MITCHAM FIRE

STATION

Testing of Power & Lighting Circuits from Distribution Boards.

Conducting Dead & Live Tests for Clients Witness. Authorised to Switch

Distribution Boards from Main Panel. Tested LCM

(Lighting Control Modules). Fault Finding & Rectification & repair

when required. NICEIC standards met with paperwork & Testing &

Inspection.

May14-Aug 14

Electrical Supervisor RACC / HOPKINS

Coordinate Installation of containment for Power & Lighting to

drawings, coordinate labour, ordering of materials, Measurement of

progress, Design & Build where required. RAMS & specification adhered

to. Substation installed with 10kv Transformer with Ringmaster

isolation.

SWA terminated in panel with ladder racking for cleating cables.

Overseeing of quality & management of H & S on site. Taking toolbox

talks & induction of new starts.

Mar14- May14

Industrial LUL Electrician & Tester Acton LUL Depot/ EMICO

Installation of Ladder rack for dc switch room and tray, trunking and

conduit for power

& lighting Hi level. Installation of conduit for Fire Alarm systems.

DC room & cleating of DC cable. Testing of DC cables, LV cables and

Fire Alarm circuit.

Jan14 -Mar 14 Proctor Gamble Grays Essex

Matthew Hall

Commercial Electrician Conveyor systems

Installation & Termination of control panels for 3 - d conveyor

systems. Installation of containment for all signal and lv cables.

Installation of PEC sensors and motors on system.

Sep13-Dec14

Electrical Maintenance Technician T2a MITIE M &

Cooling Towers

Maintaining all Mechanical & Electrical systems Maintenance of BMS

systems in Cooling tower. Monthly reports on defects, repairs and

malfunctioning equipment. Induction of contractors to site and RAMS

assessment. Received training on Chillers, expansion reflex units,

Legionella, Armstrong pumps and Motivair air compressor, and Emerson

UPS networks. Compiled Asset Register.

May13-Aug13 T2A Honeywell M & E Engineering Supervisor

Heathrow HETCO

BMS tester

Installation of BMS systems on the chiller controls. Pre commission of

all sensors: temperature, flow, pressure, speed for continuity &

resistance the operation and functional testing was also carried out

including a power check and calibration. All loops sensors were

checked and calibrated and analogue and digital testing completed.

BMS systems are monitoring Chillers, Pumps, storage Tanks and vessels,

Ventilailation, Water Treatment, Cooling towers, Leak detection, Gas

detection, Split Units, Down Flow units., ROTORKS, Reverse OSMOSIS.

SCADA system implemented full range of alarms and warnings need to be

interpreted. Contractors are subjected to RAMS and limitation of

access. Reporting and escalation of prioritisation to equipment fault

codes due to 24/7 monitoring.

Dec12- May13

Industrial electrician Wandsworth Wharf/ Matthew Hall

Installation of Low Voltage systems in accordance with 17th edition in

switch rooms. Installation of containment to ceilings, including sub

frame, ladder rack, trunking, basket, tray and trapezium bracketry to

ceiling. Installing containment for BMS control of chillers, boilers

and tank room sensors. .Installation of multi core telecom cable and

Gas Booster containment.Including Nurse Call systems in disabled

toilets. Extending lighting and ring power circuitry. Installation of

Ryfield Sub main boards, and Eaton main panels for voltage

distribution.

Nov 12 - Dec 12 Leadenhall Building/ London / LOR /Select

Industrial electrician Installation & Maintenance of temporary

electrics to building site including Emergency, Lighting, Power

transformers, Main Distribution Units, HV Transformer & control switch

panel, temporary vertical riser, Crane supplies, SWA cleating and

cable pulls, Wireless Fire Alarm

Oct 12 - Nov 12 Brixton Police Station / Gratte Bros

Industrial electrician Installation of containment to ceilings,

including sub frame, ladder rack, trunking, basket, tray and trapezium

bracketry to ceiling. Installation of DADO trunking to walls for power

and lighting points. Wiring of all power and lighting circuits with

singles and mounting of 3-phase distribution boards.

Sep 12 - Oct 12 University of Westminster Wheatley M&E

services

Industrial electrician Installation of Main Incoming Panel including

all incoming and outgoing SWA's glanding to circuits to sub main plant

and distribution boards. Also crimp lugging of outgoing circuits in

switch fuse panels and main and equipotential earth bonding at MET.

July 12 - Sep 12 Cobham Motorway Services Rotary

Electrical Services

Industrial electrician installation of wiring, terminating and

installing containment on external lighting feeder panels for street

lighting, bollards and CCTV cameras.

May 12 - July 12 Bailey Rail/ Reading Station

PTS Electrician Installation of Low Voltage systems in accordance with

17th edition on passenger platforms and switch rooms. Installation of

containment to ceilings, including sub frame, ladder rack, trunking,

basket, tray and trapezium bracketry to ceiling

Apr 12- May 12 Mitie Engineering /First Capital Connect

Electrical Maintenance Electrician of Low Voltage lighting and power

systems in accordance with 17th edition Wiring Reg Installation of

containment to ceilings, including sub frame, ladder rack, trunking,

basket, tray and trapezium bracketry to ceiling s on platforms and

back of house including: Emergency Lighting, UPS Power Supplies and

Generators.

Apr 12-Apr 12 Royal Marsden/ Sutton / BBES (Balfour

Beatty)

Electrical Test & Inspector engineer Electrical testing of wiring to

sub main distribution and main distribution panels and final circuits

including : insulation resistance, earth loop impedance, continuity of

CPC's, verification of electrical systems employed

Mar 12- Apr 12 May Gurney/ Acton Wells signal box

Industrial PTS electrician Installation and commissioning of Appolo

Fire Alarm system with call point, smoke, heat detectors, Xenon

flashers and sounders in accordance with regulations. Installation of

Low Voltage Lighting Control Systems with dimmer and emergency

monitoring.

Feb12- Mar 12 Long Reach Dartford sewage works / E-Tech

Industrial electrician Terminating/ Glanding SWA's in HV Panel for

Blower control systems and terminating control Cabling with numbering

systems in Hawker Sidley 4kv control panel

Feb 12- Feb 12 Cofely /Gatwick Airport Control Centre

Electrical Supervisor controlling baggage conveyor control systems via

SCADA interface in control centre and fault finding hands on PLC

controls systems and its sensors; weight; oversized guage, congested,

Oct 11- Feb 12 Balfour Beatty /Blackfriars /British Rail

Project

Industrial electrician (with PTS) installing C.M.S (Cable Management

Systems) Installation of trunking, tray, ladder rack & conduit, in

accordance with British Rail specifications. Wiring of lighting &

power circuits with lsf(LOW smoke Fume) cable terminating circuits at

the load & distribution board mcb`s (Miniature Circuit Breakers)

Jul 11- Sep11 Briggs &Forrester/Gatwick Airport North Terminal

Extension

Electrical Test & Inspector engineer Commissioning low voltage

lighting & Power Systems as 2391 tester including all dimmer rack

lighting controls. All sub mains

& final circuits. Commissioning all HVAC plant & Main Switch Room

panels. and final circuits including : insulation resistance, earth

loop impedance, continuity of CPC's, verification of electrical

systems employed

Apr11- May 11 N G Baileys Gatwick Airport Immigration & car

parks

Installation electrician Installing low voltage lighting & power

systems including rerouting lighting trunking and LV cables for

installation of crash control bollards

Mar 11- Apr 11 Cripwell Electrical/Islington Media Arts Centre

Installation electrician installing low voltage lighting & power

systems including conduit for supplies to class rooms and of trunking,

tray cable management systems at Hi Level

Feb 11- Mar 11 Matthew Hall/ Woking / McLaren

Racing Team

Installing electrician installing low voltage lighting & Power Systems

Including

Busbar lighting control systems via contactors and 650A Power Busbar

for tooling around plant

Nov 10- Feb 10 BIO COLLECTORS / Mitcham

Maintenance ElectricianEnsured operation of electrical systems and

equipment by completing preventive maintenance requirements on

shredders, conveyors, programmable controllers, transformers, voltage

regulators, and machinery wiring; following electrical code, manuals,

schematic diagrams, blueprints, and other specifications;

troubleshooting.

Repaired electrical systems and equipment by diagnosing malfunctioning

apparatus, such as transformers, motors, and lighting fixtures;

determining faulty wiring; inspecting and testing malfunctioning

machinery.

Controlled downtime by informing production workers of routine

electrical preventive maintenance techniques and monitoring

compliance.

Installed new machines and equipment by installing power supply wiring

and conduit to and between machines and equipment; using hand tools

and test equipment.

Repaired and replaced faulty electrical components by using testing

equipment and hand tools to install relays, switches, motors, printed

circuit boards, and position-sensing devices

Apr 10- Nov 10 MJN COLSTON/ North East Surrey Colleges

NICEIC Electrical Test & Inspector Engineer commissioning low voltage

lighting & Power Systems . All sub mains & final circuits.

Commissioning all HVAC plant & Main Switch Room panels. and final

circuits including : insulation resistance, earth loop impedance,

continuity of CPC's, verification of electrical systems employed

Feb 10- Apr 10 Playford Ltd /Kingston University

Electrical Test & Inspector Engineer commissioning low voltage

lighting & Power Systems All sub mains & final circuits' insulation

resistance, earth loop impedance, continuity of CPC's,

Jan 10 - Feb 10 Wilmot Dixon LA Fitness Various London venues

Electrical Supervisor: controlling various Air-conditioning,

mechanical and electrical subcontractors who were upgrading HVAC

systems

Dec 09- Aug 09 Maudsley Hospital /South London healthcare

Trust

Lead Electrician a team of 8 electricians on the contractor side

installing automatic switching of new LED energy efficient lighting

with Carbon Trust: Controlling a team of 6 maintenance electricians on

reactive and preventative requests. Furnishing reports regarding

compliance with Emergency Lighting and Electrical inspections. I also

ran the reactive maintenance electricians which responded to

breakdowns on mechanical plant. I also and replaced any plant (Pumps &

Motors) & renewed filters on AHU's, serviced FCU's, Chillers, and a

general fault finding using the TREND BMS system which included being

on call out of hours. PAT testing & fixed wiring testing was

conducted including Low Voltage switching on switchgear panels &

conducting emergency generator testing. I also supervised the

mechanical division when on leave as well as the general fabric

building side when called for.

Jul 09- Aug 09 Heathrow Airport Terminal 4 / Heathrow Electrical

Services Ltd

Charge hand Electrician Installing Power & lighting Systems in

immigration at high level including heavy containment with scissor

lifts

November 08 - July 09 (St Christopher's Hospice)

/Capri Electrical

Electrical Supervisor: My key responsibilities included writing

permits to work, ordering materials coordinating electricians &

installing switchgear, cabling to drawings. Organising shut downs;

witness testing procedures & test LV lighting & power. Inviting

tenders for critical works and monitoring and controlling

subcontractors onsite.

I designed the electrical services for the new build, including sub

main calculations as well as final load design circuit currents

February 08 - October 08 Watson Norie -Isle of Grain Kent sub-

station

Installing electrician :Installation of main SWAs in Switch Panels for

new including assembly of containment; .Ladder rack ; Unistrut ; Tray

; Trunking ; Basket ; Cleating

October 07 - January 08 Tek UK - Broad Oaks/ Addlestone

M/E Site ManagerManaging mechanical & electrical trades on the Broad

Oaks Estate, Addlestone. I was responsible for organising the sub-

contractors in regard to installation clashes Ensure sub-contractors

work was to specification and drawing layout. Checking method and risk

statements as well as writing our own, for direct employed

subcontractors. Procurement of materials, including electrical

equipment and services, through a thorough tendering process. Ensure

QS was informed of any progress issues through report writing. Keep a

day to day log

June 07 - October 07 C E L Building Services - Site Manager

(Electrical)

Overseeing the refurbishment program ensuring that targets where

met, organising and controlling labour, manage and procure

resources, produce regular updates, attend progress meetings,

commission the O&M manuals and deliver the job snag free.

January 07 - June 07 Paragon Interiors - Supervisor

Overseeing fire alarm engineers, Data engineers and Electricians.

My duties include programming the day to Day works, completing

weekly progress reports, attending service meetings, completing day

work sheets, producing as fitted drawings, completing snagging

sheets, procurement of materials and equipment and submitting O&M

Manuals.

June 06 - January 07 Cape - Supervisor/Tester

Meeting multiple deadlines on various sites within the Kodak

complex. My role has been to check and verify the integrity and

function of the low voltage systems employed as an Electrical

Inspector

May 05 - May 06 Lorne Stewart - Tester

Testing power and lighting systems on new build and refurbishment

of Roehampton Hospital

January 05 - May 05 A.M.E.C - Team Leader

Supervising teams of multi-skilled trades on various sites in and

around London Mainly Hospitals and Barclays bank

July 04 - December 04 Scion Property Services - Foreman

Supervising Teams of multi-skilled trades new build and

refurbishment of buildings at RAF Odiham within an MOD enviroment

September 03 - June 04 Relabond - BP UK Sunbury

January 03 - August 03 M&E Electrical - Colnbrook Industrial Estate

June 01 - December 02 Design Selectric - Staines PC World

November 00 - June 01 Advanced Power - BA Farnborough

August 00 - November 00 Naston - East Grinstead Sewage Works

April 00 - July 00 Honeywell - Epsom Tudor Investments

January 00 - March 00 East & West - SKY News Brentford

January 99 - January 00 Burgular Alarm Contractor for Permanex

Temporary scaffold

alarms

January 90 - January 99 Various Agencies - Construction Worker

I was employed as an agency worker on a wide range of construction

sites from house building to commercial office blocks, mostly as a

1st/2nd fix carpenter or as a bricklayer's mate. Although I enjoyed

this period, I needed to advance my career before it was too late.

I therefore decided to go back to college to study to become an

electrician. In between study, I still worked on construction

sites, starting as an electrician's mate then eventually as a

qualified electrician.

September 87 - September 89 Trade Training - Carpentry, Joinery,

Bricklaying

September 84 - July 86 University Student

July 83 - July 84 UKAEA - Research Assistant

REFERENCES

Steve Peters Commissioning engineer CML

Tel - 077********

Tony Taylor

Bancroft Commissioning Manager

Tel - 079**-******

EDUCATION DETAILS

BASIC EDUCATION

ESTABLISHMENT COURSE GRADE

Eastfields High O-Level

Mitcham Surrey History B

Sep76/ Jul79 English B

Maths A

Biology C

Physics A

Art D

HIGHER EDUCATION

Merton Technical Ordinary National Diploma COMMENDATION

Morden Surrey A-Level

Sep79/ Jul81 Maths Pure B

University Surrey B.S.C. Hons 1st Year : 2:1

Guildford Electrical & Electronic 2nd Year :

2:2

Sep81/ Jul85 Engineering 3rd

Industrial

4th Year : F

VOCATIONAL TRAINING

ROLE COURSE DATE

U.K.A.E.A. Research Assistant University Placing

Jul83/Jul84

Twickenham Skill Carpentry/ Joinery C&G Level 1

Sep87/Jul 88

Centre

Ewell technical Bricklaying C&G Level 1

College

Carshalton Electrical Installation C&G 236 Part1/2

Sep99/ 03

College

Wandsworth Inspection & testing C&G 2391

Mar99/Jun99

College 16th Edition Regs C&G I.E.E.

Carshalton Design & Verification C&G 2400

Mar03/Jun03

College

Carshalton Electrotechnical C&G NVQ3

Sep03/Jun03

College Certification

Gatwick Training centre Scissor lift & Boom IPAF licence

July 09

Categories 3a, 3b

North West Kent College CCNSG Safety Passport (SCATS)

July 09

Gatwick Training centre PASMA safety temporary tower scaffolding

July 09

Carshalton Technical College 17th Edition Wiring Regulations

Sep 09

Crawley College Electrical & Electronic Eng HND

Sep06/Jun 08

REFERENCES

TOM MC CULLUM SPIE MATTHEW HALL ELECTRICAL SUPERVISOR

077**-******

GORDON CLOUGH GALLIFORD TRY ELECTRICAL ENGINEER

079********

STEVE PETERS CML SUSTAIN COMMISSIONING MANAGER

078********

GRAHAM MACER WRIGHT SITE MANAGER T2A HETCO

078********

KEVIN LINNEGAR WEST & WEST SUPERVISOR

077********

.



Contact this candidate