Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Chaska, MN, 55318
Salary:
Negotiable
Posted:
January 20, 2017

Contact this candidate

Resume:

Cynthia Amin ***** Jackson Dr., Eden Prairie, MN - 55347

Cell 334-***-****, acyd3b@r.postjobfree.com

QUALIFICATION PROFILE

Key Strengths: Honesty, Sincerity

Expertise in Demand Forecasting, Cost Analysis, Project Management, Availability/Spare Parts Analysis, Work Flow/Process Flow, Six Sigma, Statistical Distribution, Reliability Analysis, Decision Analysis, Simulation, Linear Programming Models, Scheduling, Layout, Risk Analysis, Economic Analysis etc.

Experienced in meeting deadline efficiently, got 100% on-time delivery performance several times

Good communication with colleagues – local and abroad, as well as customers

Excellent and successful teamwork

Software Literacy: Microsoft Office, ARENA, C++, CPLEX, AutoCAD, ARM, familiarization with WINSMITH, Matlab, Visio, SQL Oracle

University Merit Scholarship, Government of Bangladesh, 1996 – 2003

EDUCATION

Masters of Science in Systems Engineering

Southern Methodist University, Dallas, Texas

GPA: 3.86/4.00

Bachelor of Science in Industrial & Production Engineering

Bangladesh University of Engineering & Technology, Dhaka, Bangladesh

GPA: 3.44/4.00

PROFESSIONAL EXPERIENCE

Southern Methodist University, Dallas, TX

Graduate Teaching Assistant & PhD Student in Operations Research, Lyle School of Engineering

Demonstrated several undergraduate labs

Graded several graduate level courses

Acting as TA in several graduate courses

Wal-Mart Global Procurement, Dhaka, Bangladesh

Assistant Merchandiser

Followed up the supply chain of Wal-Mart products that imported from Bangladesh.

Checked the product cost with the current market and modified if necessary

Ensured that all procedures are followed correctly at all stages and products are shipped on time to reach the distribution center.

Checked the local factories and made sure they are following all procedures according to buyer requirements

Controlled and updated the database system regularly to help management track on all products.

Suggested improvements in the design and accessories.

Consumer Testing Laboratories, Dhaka, Bangladesh

Testing Coordinator

Provided testing reports to Wal-Mart Global Procurement associates with explanation of their failures.

Assisted customers to understand and follow Laboratory procedures properly.

Provided different inquiries about testing

Hejaz Publications Ltd., Dhaka, Bangladesh

Production Officer

Supervised the production process of gravure cylinders.

Checked the tolerances of manufactured cylinders.

Provided the machine layout in the factory individually and machines were set up accordingly.

Maintained the scheduling of the customer orders based on processing time and delivery time

Acquired the technological knowledge on machines and processes of printing technology.

Administered the database system.

Bangladesh University of Engineering & Technology

Graduate Teaching Assistant

Demonstrated functions and uses of different machines/equipment to Senior and Junior students

Prepared, Administered & Graded practical examinations.

Padma Textile Mills, Beximco, Bangladesh

Intern, Senior Year

Carried out an intensive study in overall operation management/project management including time and motion study, machine layout etc. and suggested improvements for increasing the production efficiency

SELECTED PROJECTS

Surveillance Aircraft Project

Systems Engineering IPT

Developed the A-Spec, SEMP and TEMP

Modified an existing aircraft King Air 350 iER according to customer requirements.

Logistics Design Project

Logistics/Supply Chain Engineer

Designed logistics system of a distribution center according to customer requirements.

Developed a process that coordinates the best possible flow by clearly defining and optimizing all logistic support elements of the organization; transportation, new equipment, personnel & training, technical improvements, storage, facilities, materials handling and transportation.

Established the production forecast for 5 years based on the historical data.

Established the staffing at each level of operation in main hub and in each distribution center, including the number of drivers, tractors, trailers and warehouse space at each facility, as well as the warehouse space and cost of this space.

Evaluated the reliability of the current and new equipment at each facility, and suggested recommendations whether company should buy new equipment.

Provided logical reasoning regarding facility location.

Reliability Analysis Project

Reliability Engineer

Analyzed Board Level Drop Test reliability of Wafer Level Packages (WLP) in portable electronics especially mobile phones

Discussed failure trends of WLP components, determined reliability, MTBF, failure rates and suggested some recommendations.

Risk Assessment Project

Risk Manager

Provided detailed risk assessment on “Deterioration of Reliability in Wafer Level Package (WLP) for Portable Electronics” and suggested mitigation plans through the software “ARM”.



Contact this candidate