Post Job Free

Resume

Sign in

Civil Engineering Engineer

Location:
Bloomington, IL
Posted:
January 18, 2017

Contact this candidate

Resume:

SAISATYAGOUTHAM MADDALI

**** ***** **. *** # **

901-***-****

acycty@r.postjobfree.com

OBJECTIVE:

A career in civil engineering or construction management with opportunities for professional and personal growth.

EDUCATION:

Master in Civil Engineering G.P.A (3.40/4.00) December 2016 Bradley University,

Bachelor of Engineering, Civil Engineering C.G.P.A (6.88/10.0) May 2014 St. Martins Engineering College, Hyderabad,

India.

COURSE WORK:

Quality control application, Advanced construction estimation, Project planning and Building information modeling (BIM), Ground water hydrology, Advanced water treatment, Numerical methods, Solid waste management, Air pollution modeling and Graduate business practicum (business management course).

SKILLS:

Self-motivated, innovative problem solver.

Well-developed focus, time management and teamwork skills.

Ability to perform well under pressure and adapt to changing situation.

Excellent analytical and observational abilities, strong mathematical and financial skills. Developing Tools: Auto CAD 2D, Basics in Math CAD, HEC RAS, On Screen Take Off, NAVIS WORKS, Visio, MS Project, MS Word, MS Excel, MS Power Point, MS Access. EXPERIENCE:

September 2013 – October 2014: Engineer Trainee, RMN Infrastructure, Ltd., India Construction of residential villas in Hyderabad, the total project area is in 6.0 acers. Each unit is of 4 BHK and in total 56 units with the budget of 250 crores INR. My responsibilities are,

Ensured compliance with state and federal regulations while estimating costs.

Verified all the statistical data and drawings to make sure the accuracy of the project completion.

Prepared estimates of labor and material cost of the project.

Reviewing and tracking the schedule using the Microsoft project.

Assisted project manager in reporting daily activities and managing RFI’s, meetings.

Coordinated with quality engineer and tracked the estimate and schedule of the ongoing activates. June 2013 – Aug 2013: Intern, K.S.N Construction, India Construction of private industry complex, monitoring construction progress, assisting to site engineer. May 2012 – July 2012: Intern, C.R. Associates, India Worked with Executive Engineer in supervising the work performed by the general contractors. Work mainly includes the pre-construction process like estimation and scheduling for a school building.

ACADEMIC PROJECTS:

January 2016 – February 2016: Estimating construction cost, Prepared detailed estimate of a ‘commercial building in University Street and Glen Avenue’ (Peoria, IL). Using On-screen Takeoff and RS means calculated quantitative takeoff, labor cost, material cost and crew days.

March 2016 – May 2016: Estimation of labor productivity for a given task and equipment productivity,

The task here is taken as circular concrete column forming and the labor productivity is calculated by using RS means, determining key factors affecting productivity, considering the productivity of each task in weekly basis by that the total productivity is calculated. The equipment is taken as excavator. The productivity is obtained by determining the factors affecting the productivity, determining production rate, competing the machines in terms of characteristics, cost to rent, cost to purchase and capacity with different companies.

May 2016: BIM execution plan,

BIM project execution plan for BRONX medical health redevelopment in New York. For this BIM execution, the information of the project is collected, project needs and BIM goals are identified, BIM uses which are required and recommended are shortlisted, taking BIM uses in considerations level 1 and level 2 process maps are done using Visio software and then information exchanges are done using Microsoft excel.

May 2016: Landfill design,

The project report is based on emerging trends in landfill design and development, the design of subtitle D landfill, landfill gas collection system, landfill leachate collection system, landfill liner, bioreactor landfills like aerobic, anaerobic and hybrid bioreactor is described in detailed in the project. December 2013 – April 2014: Bus rapid transit system, Team Lead for a group of four for the project in undergrad ‘Bus rapid transit system’. Selected a corridor, calculated the level of safety and collected the number of passenger car units (PCU). June 2013 – September 2013: Ready mix concrete,

Team lead for a group of four for the study project in undergrad ‘Ready mix concrete’. Visited the site and checked the quality of the materials used, observed the process and the procedure of the RMC preparation and submitted a detailed report on it. AWARDS AND ACTIVITIES:

Published an international journal, Bhanu Kireeti Chanda[1], Maddali Sai Satya Goutham[2]

(2014). Introduction to corridor selection & assessment for bus rapid transit system

(BRTS) in Hyderabad. In American journal of engineering research.

Published an international journal, Maddali Sai Satya Goutham [1], Bhanu Kireeti Chanda [2]

(2014). Introduction to the selection of corridor and requirements, implementation of IVHS in Hyderabad. In International journal of modern engineering research (IJMER).



Contact this candidate