Post Job Free
Sign in

Manager Engineer

Location:
Saudi Arabia
Salary:
4000 usd
Posted:
January 16, 2017

Contact this candidate

Resume:

IKHWANUDDIN NURMAN

BACHELOR DEGREE STRATA – *, CHEMICAL ENGINEERING

UPN VETERAN YOGYAKARTA. INDONESIA

PERSONAL DATA

Nationality : Indonesian, Muslim, Male, Married.

Place, date of birth : Musi Banyuasin, May 03rd, 1986.

KTP address : Jl. Letnan Murod Lrg. Biga Belimbing No. 07th Rt. 05th Rw. 02nd Talang Ratu Km-5

Palembang, 30128. South Sumatra – Indonesia.

Mobile Phone : +966-****-**-*** / +62-813-****-****

Email ID : ********@*****.*** / *****.******@*****.***

Available : Immediately

Relocate : 100% Yes

Expected Salary : Negotiate.

TRAINING AND CERTIFICATE

-Japanese Language Level – 1 Certificate, June 28th, 2008. Arka paramita institute Yogyakarta. Indonesia.

-Hysys 3.2 Certificate, Software - Proccess Simulation Design, March 29th, 2009. UGM Yogyakarta. Indonesia.

-Fire Fighting Certificate with Doosan Heavy Industries and Construction, 2010. Cirebon. Indonesia.

-Fire Fighting Certificate, 2014. PT. Pertamina Refinery Unit - IV Cilacap. Indonesia

-H2S Certificate (Valid till 2016) HSE Passport, 2014. PT. Pertamina RU-IV Cilacap. Indonesia.

-Steam Turbine Generator Training, Shin Nippon Japan. Japan.

-Water tube Boiler Training, Backhock Hitachi. Japan.

-Compressor Training, Elliot, USA.

-IOSH Certificate, UK. Cert No. 486 378

-IBOEHS Certificate, USA. Cert No. 3854

SEMINAR

-Seminar “One Day Workshop – Log Interpretation” with BP (British Petroleum), UPN Yogyakarta. April 25th, 2009.

-Seminar and Talk Show “Prepare for the future” with Pertamina EP, Medco, Chevron and Shell. UPN Yogyakarta. July 30th, 2009.

-Participant Seminar “Exploration to pilot coal bed methane development and lifting liquefied natural gas FPSO”, Nov 21th, 2009 with Medco CBM Sekayu and PT. Menara Mas Energi. UPN Yogyakarta.

PROFESSIONAL EXPERIENCES

OPERATION AND PRE-PARATION TEAM

Al safwa / 9 Jan 2016 - up to present, Saudi Arabia

REASON FOR LEAVING : -,

Preparation for Operation Maintenance for Line -II Project, Cement Company.

Job Description :

Monitoring Refractory Progress report, Punch list - Mechanical Erection and Installation, permit, risk assessment.

Monitoring New HFO Tank erection and installation, Piping fuel line, Hot Tapping, air blowing.

Monitoring Water Treatment Installation, compressor installation.

Performe Start-up Team with Lafarge Team, Tyssenkrupp Team, Cegelec team, Spie Oil & Gas Crew.

Performe commissioning team for Booster station pump, Rotating Kiln, Cooler Area, water treatment, compressor, Main Drive

Performe Shutdown Line – 1.

Reference

1.Mr. Zulfiqar Anjum ( Manager Operation and Prepartion Line - II), Phone : +966-*********

2.Mr. Jafar ( Manager Project for Line - II).

3.Mr. Emad Hajezi (HR Manager Al safwa).

4.Mr. Said Aminuddin (Production Manager Line – I).

5.Mr. Aktab Izhar (Production Manager Line – II).

LEAD FIELD ENGINEER

REKIND / End of Oct 2015 – Dec 2015 – Prabumulih Field, South Sumatera Area.

REASON FOR LEAVING : Join Al Safwa Cement Company – Saudi Arabia.

Installation Underground Pipeline 40km, 6” of High Pressure Gas Distribution Project, Pertamina Gas Station.

Job Description :

One part Construction Team for Package and Drawing Review.

Work together with consorium company (WIKA and NK)

Lead the engineer to maintance Sub-contractor work.

Lead the fresh engineer to review drawing, and make sure installation is done as per drawings.

Monitoring Sub contractor - Petro-gas Prabumulih work progress.

Make a daily, weekly and monthly report for all activity.

Reference

1.Miftahul Huda ( Construction Manager Yin-Rekind ), Phone : +628**********

SENIOR FIELD COMMISSIONING AND START UP TEAM

GS ENGINEERING AND CONSTRUCTION / March 2014 – Oct 2015

REASON FOR LEAVING : Resign From GS Engineering and Construction because Waiting Sign Contract for JOB Tomori

BUMN – Government Company. Pertamina Medco South Sulawesi From May 2015.

Because All test and Medical Check-up already completed.

Commissioning and Start up Team Oil and gas downstream Refinery Project.

RFCC Project (Resid Fluid Catalyst Cracking) with Cap 62.000 barrel – PT. Pertamina RU-IV.

Job Description:

One part for Pre-Commissioning activities ; Package Check and Review to make sure the installation already done or not, to make sure the planning is going as per schedule, Line Checking, Leak Test, Hydro-test, Water Flushing, Air Blowing, Steam Blowing and Reinstatement.

One part of Commissioning Team for Preparation MRT - Mechanical Run Test Equipment such as Demin Pumps for water flushing line first before air blowing and steam blowing, run the portable Compressor to supply the instrument air first for Main Compressor and portable line for air blowing system to clean out the any particle inside the pipeline before steam blowing going on and as instrument supply for leak line check ( bolt and flanges connections) for before air blowing activities,

One part of commissioning team to clear out punch-list from owner Pertamina before PSSR going on – on Pre Startup System Review so possible to startup the main compressor to supply instrument air and service air to system.

One part of commissioning team to do the steam blowing after air blowing done to make sure line for steam already clean and ready for service, after that preparing the PSSR to startup the boiler 3x85 ton with Hitachi vendor for supply steam to Steam Turbine Generator.

One part of Startup activities for utility area ; 156 area from Dry Plant air + Dryer, Aux Compressor + Dryer with vendor including KO Drum and Receiver tank, 151 area for Aux. Boiler with Hitachi vendor + Deaerator (Combustion Test, Popping Test, blowing out) 3x85TPH with 42kg/cm2 - 385 Deg oC HPS, 18.5kg/cm2 – 315 Deg oC MPS, 4.5kg/cm2 - 220 Deg oC LPS, fuel solar line and Gas line, De-aerator area, and 152area for Steam Turbine Generator with Cap 3x15MW together with Shin Nippon Japan vendor

One part of Pre-Commissioning activities for process area; P&ID Review, Line checking for Main Column, Wet Gas compressor, dryer, Splitter C3/C4, LPG, Re-boiler, Exchanger, Flare and other for Leak Test, Air Blowing, Steam Blowing.

Assigned area ; 103 area for LPG MEROX and 104 area for Ethylene Recovery, 107 Sour Water System, 108 area for Hydrogen Purification System, 109 area for Chemical Injection.

Operated the Compressor, Boiler 3x85 ton and steam turbine generator 3x15 MW.

Reference :

1.Mr. Hong Kuk Jin (Field Supervisor GS E&C). Email ID : ********@*******.**.**

2.Mr. Suprihadi (ex-Pertamina – X-Field Supervisor GS E&C – Adviser Startup Team Pertamina RU-IV).

3.Mr. Rudi AB (Adviser Startup Team Pertamina RU-IV)

4.Mr. Amin Utoyo (ex-Pertamina – Field Supervisor GS E&C). E-mail : ***********@*****.***, Ph : 085*-****-****

5.Mr. Iwan Suwandono (ex-Pertamina – X-Agip - Field Supervisor GS E&C). Ph ; 081*-****-****

6.Mr. Idaliansyah (ex-Pertamina RU-IV, X-Field Supervisor GS E&C, Adviser Pertamina RU-IV). Ph ; 082*-****-****

7.Mr. Sumargono (ex-Pertamina RU-IV, Field Supervisor GS E&C). Ph : 081*-****-****

8.Mr. Ipuk (Head of Steam Scope Pertamina RU-IV).

9.Mr. Agus Rahmat Jamal (Engineer Pertamina RU-IV for RFCC Project).

SITE PROJECT ENGINEER

KIS GROUP PTE. LTD. Singapore / May 08th, 2013 – March 25th, 2014

REASON FOR LEAVING : PROJECT COMPLETED.

Installation and Construction (ME Division) for Methane-Gas Plant Project from Palm Oil Mills Plant as fuel for Boiler.

Construction 60Ton/Hour for Biogas (Methane) Plant Project, POLIPLANT Group – PT. MAI, West Kalimantan and 45Ton/Hour Biogas (Methane) Plant Project, PT. SAM – ASTRA Group, South Kalimantan.

Job Description:

Perform as Single Vocal - Project Engineer (in-charge) to controls and supervise Mechanical Electrical installation such as Fabrication, erection, installation including Piping, Tank, rotating engine, Cabling Panel with Vendor and with Sub Contractor.

Perform as Project engineer to Monitoring timeline progress work sub-contractor for Renewable Natural Energy Plant Biogas project (Methane gas) from Palm Oil mill.

Perform as Project Engineer for Meeting with Owner about progress schedule and Back up commissioning engineer for trial run, Commissioning, up to Start-up starting.

Reference :

1.Mr. Jamaful, Mill Manager PT. MAI – POLIPLANT Group, Phone : +62-812********, E-mail ID : *******@*****.***

2.Mr. Yose Rizal Batubara, Project Manager, PT. SAM (mill) – ASTRA GROUP. Email : *********@*****-****.**.**

3.Mr. Raghunath, K. R. Director KNOWLEDGE INTEGRATION SERVICES (Singapore) Pte. Ltd.

Phone : +65 97981554 / +62-821********, E-mail ID : *****@********.***

FIELD COMMISSIONING AND STARTUP TEAM

ORGANO CORPORATION / PT. LAUTAN ORGANO WATER – March 02nd, 2012 - March 28th, 2013

REASON FOR LEAVING : PROJECT COMPLETED.

Take Resign for Waiting Sign Contract with Elnusa for wireline logging – Pendopo site from Feb 2013.

All test and Medical Check-up already completed.

Commissioning and Startup Team for Indonesia Power Project - Semarang

Job Description:

Perform as Commissioning team to Consent for Installation and Construction including Commissioning and Start up for Utility Plant Project as per design such as High Pressure Pumps, pipeline installation, RO (reverse osmosis) installation, Mixed bed polisher for demineralization system.

Perform and Contribute as commissioning team to review installation base on PNID and isometric drawings and Perform as startup team for utility project such as Mixed Bed Polisher, Reverse Osmosis BWRO and SWRO for Demin water production for Boiler.

Perform as Maintenance team for inspection warranty project, review sequence programs and etc.

Monitoring Sub contractor on field for progress report and daily report.

Reference :

Mr. Hendry. Manager Construction, Phone : +62-815********.

FIELD COMMISSIONING AND STARTUP TEAM

DOOSAN HEAVY INDUSTRIES AND CONSTRUCTION CO. LTD. / 2010 – 2012

REASON FOR LEAVING : PROJECT COMPLETED.

Commissioning and Startup Team for 1X660 MW CFPP PROJECT SUPER CRITICAL – Cirebon Electric Power.

Job Description :

Monitoring Sub contractor on field for progress report and daily report.

One part of commissioning team to review installation as per P&ID.

Report to manager commissioning about any issue on site.

One part of commissioning team to preparation and do the water flushing the pipeline.

One part of commissioning team to preparation and do the air blowing the instrument air line to any part of Automatic valve.

Make clear any punch list from owner before startup any equipment to make sure no any issue and make it system can start properly with safety.

One part of commissioning, startup and operated team the water treatment plant from sea water up to production the demin water using RO System on Water treatment Plant.

One part of commissioning, startup and operated team the waste water treatment plant to control any parameter and system before transfer to disposal including injection the chemical.

One part of commissioning, startup and operated team to operated the main compressor to supply the instrument air system before startup the boiler.

One part of commissioning, startup and operated the Aux. boiler system to produce the steam with cap 1x90 ton (42kg/cm2, 390 Deg oC for HPS) before startup team Main Boiler.

Operated every area from DCS panel controlling any parameter and make report daily.

Reference :

1.Kim Jin Sung, Manager Chemical Department. Doosan Heavy Industries and Construction Co. Ltd.

E-mail : ******@****.***

2.Kim Chang Soo, Asst. Manager Chemical Department, Doosan Heavy Industries and Construction Co. Ltd.

E-mail: *******@********.***, Phone : +82-105*******

FIELD BOILER ENGINEER

PUPUK KUJANG, PT. CIKAMPEK / UTILITY 1-B, BOILER DIVISION. 2009

Operation Maintenance for Package Boiler BF-4101 and Waste Heat Boiler BF-4102

Job Description:

-Operated Process Plant Utility 1B specially for Package Boiler B- 4101 and Waste Heat Boiler BF-4102.

-Perform as Field Operation Team for Boiler Area for Operation and Maintenance by DCS/CCR and Field.

-Monitoring the performance Package Boiler Backhock Hitachi (field and DCS with Temp : 393 Deg oC, 42kg/cm2),

-Collect data for analyzing and Calculation efficiency of Package Boiler BF 4101

-Create Daily report and Presentation to Manager Utility 1B division,

-Meeting with Manager Utility 1B including Engineering Team.

-Operated Water Treatment Plant with RO System as feed water for Boiler 2x25 m3/hr (Demin water).

Reference :

1.Mr. Anwar. Manager Utility 1B.

FOLLOWING INFORMATION

Full Name : IKHWANUDDIN NURMAN

Active Email ID : ********@*****.*** / *****.******@*****.***

Current Contact Number : +62-813-****-**** / +966-****-**-***

Date of Birth : May 03rd, 1986. Indonesian PR.

Sex : Male.

Current Location : Saudi Arabia

Start Period Available : Immediately / End of December, 2016

Passport Number : A 4306320.

Relocation and Travelling : 100% Yes.

Last Salary : GROSS SALARY Over 3000 USD ( Depend on Over Time).

Current Company : Al-Safwa Company

Educational Qualification :

Pembangunan Nasional ‘veteran’ University of Yogyakarta, Indonesia.

Chemical Engineering, Bachelor Degree Strata-1.

FINAL TESIS

“ Simulation Design Ethylene Glycol from Ethylene Oxide with Production Cap. 100.000 Ton/years with 1Unit Batch Reactor + 4unit Distillation Tower Unit Systems from 6xH2O:1xEO with Hg as Catalyst. “



Contact this candidate