Post Job Free
Sign in

Mechanical Plant

Location:
Aceh, 24354, Indonesia
Salary:
5000 USD
Posted:
January 16, 2017

Contact this candidate

Resume:

Hendra Saputra, A. Md

Place / Date of Birth Aceh / September 22, 1985

Sex Male

Marital Status Married

Religion ISLAM

Blood Type A

Height / Weight 170 cm / 75 Kg

Nationality Indonesian

Home Address Dusun Simpang IV- Desa Uteun Geulinggang

Kecamatan Dewantara Kabupaten

Aceh Utara, Nanggroe Aceh Darussalam – 24354

Indonesia

Mobile Phone +62-811-***-****

Skype id hendra220985

E-mail Address *****************@*****.***

****************@*****.***

Total Work 10 years

Experience

FORMAL EDUCATION

2003 – 2006 Diploma Degree (D3) in Mechanical Engineering at Politeknik Negeri Lhokseumawe, Aceh Utara, GPA 3,16 of 4 scales

2000 – 2003 Senior High School at SMUN 1 Dewantara, North Aceh

1997 – 2000 Junior High School at SMP 1 Dewantara, North Aceh

1991 – 1997 Elementary School at SDN 3 Krueng Geukuh, North Aceh

WORKING EXPERIENCE

September 2015 – Present ( 1 year 3 months)

QAFCO (Qatar Fertiliser Company), MESAIEED QATAR

Assigned to Rotating Machinery Section as Lead Mechanical Rotating Technician, Report to Mechanical Rotating Supervisor.

Routine Activities :

Generate work permit from JDE before do the job.

Carry out maintenance activities such as oil replacement pump, coupling inspection and checking, seal gas and N2 filters replacement base on work order from the system (ORACLE JD Edward) such as preventive maintenance or predictive maintenance.

Carry out material inspection after repair from store (check dimension base on the drawing)

Make pick slip from system to take material from store.

Post man hour to JDE after completely daily activities done.

Create work order and sub order from JDE

Shutdown Activities :

Overhaul pump, centrifugal compressor, gas turbine

Perform alignment ( with laser alignment or dial indicator) do correction if needed.

Dry gas seal replacement in the centrifugal compressor.

Perform Combustion Inspection and Major Inspection in gas turbine.

Check clearance radial bearing during overhaul.

Perform centering rotor and check axial movement in the centrifugal compressor.

I have experience with Natural gas compressor, refrigerant compressor, process air compressor, synthesis gas compressor, carbon dioxide compressor, steam turbine and gas turbine.

May 2011 – August 2015 ( 4 years 3 months)

PT. Pupuk Iskandar Muda Krueng Geukueh Plant, Aceh Utara Nanggroe Aceh Darussalam

Assigned to Mechanical Department as Mechanical Rotating Technician, Report to Mechanical Rotating Supervisor. Responsible to execute all mechanical rotating trouble such as preventive maintenance or overhaul condition. Familiar with Plant Maintenance procedure and safety regulation (permit to work, confined space, working at height, etc). Familiar with Alignment reverse, Face & Rim method, unbalance problem, mantling and dismantling rotating equipments such as gas turbine, steam turbine, compressor, centrifugal pump, diesel engine, familiar with mechanical seal and bearing (anti friction bearing, thrust bearing, journal bearing, tilting pad bearing), perform clearance check for all rotating parts clearance such as journal bearing, thrust bearing, rotor position and other clearance as required in vendor manual.

August 2007 – April 2011 ( 3 years 8 months )

PT. Lafarge Cement Indonesia, Lhoknga Plant, Aceh Besar Nanggroe Aceh Darussalam

August 2007- March 2008 Join PT.Lafarge Cement Indonesia (former name was PT.Semen Andalas Indonesia) On People Development Program.

March 2008 – April 2011 Assigned to Mechanical Execution Department as Mechanical Technician, report to mechanical execution supervisor. Responsible to execute any mechanical execution activities assigned by Mechanical Execution Supervisor such as, preventive maintenance, overhaul condition due to equipments breakdown, Conduct detection oriented program on all mechanical equipments by visual inspection to identify potential failure of the equipment. This included; oil leak, heat, dirtiness, vibration, noisy, corroded part and also the related safety aspects and house keeping.

September 2006 – July 2007 ( 10 months )

PT. Arun NGL, Lhokseumawe Plant, Aceh Utara Nanggroe Aceh Darussalam

Assigned to mechanical execution department as Mechanical Technician

report to mechanical supervisor. Responsible to carry out daily routine preventive maintenance program to keep all equipment in good condition by re-lubrication and readjustment or mayor/minor repair if required. This included centrifugal and positive displacement pumps, fin-fan coolers and motor operated valve ( MOV ), Nitrogen plant, Gas Turbine, Compressors and Power Generator Gas Turbines

COURSE AND TRAININGS

18 September 2006 – 17 April 2007, Mechanical Maintenance Training Program, by PT. Arun NGL, PT. Arun LNG Plant, Lhokseumawe (Certified)

26 September – 2 October 2006, Fire Fighting & Rescue Course (Theory)

26 October – 3 November 2006, Fire Fighting & Rescue Course (Practice), by PT. Arun NGL Fire & Safety Health Environmental, PT. Arun LNG Plant, Lhokseumawe (Certified)

January 2007 – April 2007, Turnaround Gas turbine MS-5001 (Major Inspection) and Compressor as Rotating Equipment Technician, by PT. Arun NGL, PT. Arun LNG Plant, Lhokseumawe (Certified)

4 September 2007 – 8 March 2008. People Development Program, by ICCI, Bogor- On job Training at PT. Semen Baturaja and PT. Semen Padang

22 – 24 September 2008. Maintenance Gear Box, by Lafarge Asia Technical Center, Lhoknga plant

15 December 2009, Lock Out Tag Out Try Out (LOTOTO) And Work At Height (WAH) Training, by Safety Department, Lhoknga Plant

25 - 27 March 2013, Basic Vibration Analysis Course, conducted by PT. Tiara Vibrasindo Pratama, PT. Pupuk Iskandar Muda plant (Certified)

12 - 15 October 2015, Familirization training (Safety, Environmental, Quality) by QAFCO safety section, QAFCO plant

27 - 29 October 2015, Rigging and Lifting, theory and practical by Bureau Varitas, QAFCO plant (Certified)

4 - 9 September 2016, Centrifugal Compressor by GE Nuovo Pignone, QAFCO Training Center

SKILLS

Able to use standard hand tools or special tools

Able to use measurement tools such as venier calipper, micrometer, bore gauge

Familiar with P&ID diagram, sectional drawing of equipment

Familiar with Plant Maintenance procedure and safety regulation

Familiar with Fixtur Laser alignment or with dial indicator (reverse or face and rim method)

Able to use ORACLE JD Edward system

Familiar with lifting tools colour code system

Familiar with heat stress system work during summer season

Able to check bearing clearance during overhaul

Familiar with mechanical seal and bearing

Familiar with dry gas seal and dry gas seal system in the compressor

Primary Equipments which is included in the Job Activities :

75 MW Power Generation Plant consisting of 3 GE MS-5001 PA Gas Turbine driving Brush Generators.

20 MW Power Generation Plant consisting of GEC ALHSTOM MS-5001 PA Gas Turbine driving Brush Generators (Major Inspection).

15 MW Power Generation Plant consisting of GE MS-5000 Gas Turbine driving Brush Generators.

Forced draft fan for package boiler consisting of SIEMENS electric motor and Dresser Rand steam turbine driving Boldrocchi forced draft fan.

Cooling water pump consisting of Mitsubishi electric motor SHINKO steam turbine driving EBARA pump.

Polish water pump consisting of COPPUS steam turbine and SIEMENS electric motor driving EBARA pump.

Air compressor consisting of SIEMENS electric motor driving ISHIKAWAJIMA HARIMA reciprocating compressor.

Condensate water pump consisting of SHINKO steam turbine (vertical) driving EBARA pump.

Synthesis gas centrifugal compressor consisting of SIEMENS steam turbine driving HITACHI compressor.

Diesel engine consisting of engine DAIHATSU DS - 26A driving generator.

Boiler feed water pump consisting of SHINKO steam turbine driving UNITED pump.

40 MW Power Generation Plant consisting of GE MS 6001 Gas Turbine (Major Inspection).

48 MW Power Generation Plant consisting of GE MS 6001 (GT. 9401) Gas Turbine (Combustion Inspection).

48 MW Power Generation Plant consisting of GE MS 6001 (G1.9 GT) Gas Turbine (Combustion Inspection).

Synthesis Gas Compressor GE Nuovo Pignone LP (BCL 459) HP (BCL 409).

SKILLS

Operating System : Windows XP/Vista/Window 7

Software Application : Microsoft Office (Word,Excel, Power Point, Project, AutoCad), Lotus note application, ORACLE JD Edward

LANGUAGE

INDONESIAN : Excellent

ENGLISH : Very Good

Reference

Ir. Mahyuddin Hasan

Pos / PAM Divison Operation & Maintenance Superintendent

PT.Arun NGL Co.

North- Aceh Lhokseumawe.

Mr. Halim Muhammad, Mechanical Execution Manager Lafarge-PT.LCI

e-mail: *****.********@**.*******.***

Mr. Supono, Mechanical Rotating Supervisor of PT. PUPUK ISKANDAR MUDA

e-mail: ******@***.**.**

Mr. Mursal Rajab, Mechanical Rotating Foreman of PT. PUPUK ISKANDAR MUDA

e-mail: mursal *****@***.**.**

Mr. Thirumani, Rotating Machinery Supervisor of QAFCO

e-mail : ***********@*****.***.**

Mr. Saiful Bahri, Rotating Machinery Lead Technician of QAFCO

e-mail : ***********@*****.***.**

I hereby certified that the information above

are complete and truth

HENDRA SAPUTRA



Contact this candidate