JOSE REVEROL
Email: acyam7@r.postjobfree.com
Barcelona, Venezuela
SUMMARY & OBJETIVE
Current Position:
Specialization:
Highest Professional Educations:
Area / Unit:
Core Competencies:
Personnel Unser Supervision:
Years of Experience:
Current CTC
Expected CTC Operations Shift Supervisor in PDVSA PETROPIAR (Aug 2005 - Present)
Process Operations - Oil and Gas
Bachelor’s Degree in Industrial Engineering
Atm and Vac Distillation plant, Desalters, Tank farm unit, Slop handling unit & Flares system
Pre-commissioning – Commissioning – Startup - Normal operations – Shutdown – Turnaround
07
+15
1200USD
40000USD
Seeking opportunities in Oil and Gas for any role my employer may deem it fit for me.
EDUCATION QUALIFICATION
BSc. Industrial Engineering. Santiago Mariño University Polytechnic Institute. Barcelona, Venezuela (2012)
B.Tech/B.Eng. Instrumentation and control. Alonso Gamero University Institute of Technology. Coro, Venezuela (1999)
High School Diploma. Institute Ezaquiel Zamora, Coro Venezuela (1992)
EMPLOYMENT
PDVSA PETROPIAR, Venezuela Operations Shift Supervisor Aug 2005 – Present
PDVSA PETROPIAR, Venezuela Process Technician / Operations Coordinator Apr 2002 - Aug 2005
PDVSA - SINCOR, Venezuela Instruments Technician Jan 2000 - Dec 2001
WORK INFORMATION
1.PDVSA PETROPIAR (Joint Venture PDVSA - CHEVRON) Designed to process 247,575 BPSD of 8.6 API Hamaca crude.
Industry Type: Oil and Gas (Downstream)
Aug 2005 to Present Operations Shift Supervisor
Apr 2002 to Aug 2005 Process Technician / Operations Coordinator
Location: Jose A. Anzoategui Complex, Barcelona. Venezuela (Onshore)
Unit/Plant/Area: Crude Unit (Desalters, VDU/CDU), Naphtha splitter Tank Farm Unit, Slop handling Unit, Flares System.
Lead the operational activities in the field, ensure that operation of the units that may be performed in a safe and stable manner. Performance as plant operator and Special monitoring, control, review and adjustment of field variables, stops and commissioning and startup of the equipments in plant and management personal.
2.PDVSA SINCOR (Joint Venture PDVSA - TOTAL) Designed to process 280,500 BPSD of 8.6 API Zuata crude
Industry Type: Oil and Gas (Downstream)
Jan 2000 to Dec 2001 Instruments Technician
Location: Jose A. Anzoategui Complex, Barcelona. Venezuela (Onshore)
Unit/Plant/Area: General Maintenance
General tasks and responsibilities which include, but are not limited to:
As Shift Supervisor:
• Coordinated planned and emergency plant shutdowns and start-up processes, maintaining minimal production losses and unexpected start-up delays.
• Proposed and implemented process modifications to enhance production and troubleshoot process bottle-necks as they were identified.
• Ensure minimum disruption to stable operation by detecting plant and equipment problems and implementing counter measures after trouble shooting.
• Respond to emergency or plant upset situations by shutting down plant or taking necessary action to restore normal running.
• Supervises overall plant operations, giving directions to operators according with operation's requirements.
• Coordination and execution of commissioning and startup, normal operation, emergency shutdown, turnaround and other major operational changes.
• Compliance with HSA standards and procedures, and instill a culture of high HSA awareness to the team.
• Executed security measures in plant as: Work-Permits, LOTO, Plant walk-downs, HAZOP, PSSR, What if?, and good housekeeping, when they were required.
• Optimize the use of available resources in carrying out the assigned responsibilities and ensure timely completion according to set standards.
• Administration of different team shifts, including: training and generating development plans, evaluations, request for shift changes, overtime, vacation schedules, etc.
• Review and develop SOP’s (standard operating procedures)
• Trained as a control room operator.
As Console Operator:
• Perform the startup, shutdown, & troubleshooting of the assigned units according to the approved procedure.
• Monitor plant's operating conditions and applying necessary adjustments either through control system or via acquiring plant site information
• from field operators to ensure safe & efficient process operation, and report any abnormalities to the Shift Supervisor.
• Review & back-check the results of field operators' inspections & walk-through.
• Provide appropriate commands to field operators to liaise field work with the control room operation.
• Respond to logic trips & safety interlocks.
• Communication with other sections. Issuing work permits as per permission level approved by section head.
• Filling-in the log book data (pressures, temperatures, flow rates, levels, pHs, samples taken, etc) on a regular hourly basis.
• Writing down the unit shift-activity report.
• Sharing maintenance team's missions during periodic maintenance.
As Operations Coordinator:
• Usage of Maximo program to create Work Orders and control activities and resources.
• Coordinate, create and prioritize the work order flow, in order to develop a maintenance schedule as needed by the unit with the least disruption to production.
• Visualization of operational windows where the equipments will be maintained.
• Develop weekly and monthly operational strategies in order to meet the production target.
• Develop intermediate and short term plans to ensure safe and cost efficient production.
• Take the maintenance leadership during shutdown to meet the time frames and all the scheduled jobs in order to guarantee a successful start-up.
• Work with maintenance, production planning, procurement and other business units to meet productions targets.
As Process Technician:
• Operates, Monitor and control the operations of oil & gas processes as per operating manuals and control room instructions and accordance with standard procedures and supervisory instructions within safe operating ranges.
• Take routine readings of all process variables such as temperature, pressure, flow and level and keep the production up according the company production goals.
• Experience in tank certifications in order to facilitate loading shipments.
• Effective start-up and shut down of the plant equipment’s in accordance with the standard operating procedure/ work instruction.
• Participate in pre commissioning, commissioning, process start-ups, shut-downs and isolations of the unit.
• Inform immediate supervisor about the abnormalities/malfunctions of the plant equipment found during the operations and ensure all the safety standards are followed.
• Identifying and reporting the potential hazards by strictly following the safety guidelines.
• Participate in safety audits and safety programs and maintain a safe work environment and follow up on assigned items.
• Perform routine housekeeping activities and maintain the plant tidiness.
• Responsible to train the junior operators.
• Review and develop SOP’s (standard operating procedures)
• Preparing process units and equipment for routine maintenance.
• Collect, process and analyse samples and record data.
• Promptly respond to process alarms / constraints.
• Troubleshooting and problem solving in a fully operational environment.
• Assist in the maintenance and repair of process equipment
• Sign Work Permits authorization and ensure and establish all secure conditions before begin.
As Instruments Technician:
• Fitting instruments, wiring and loop checks.
• Worked during the complete overhauling of all instrumentation and meters assigned.
• Participate day-to-day maintenance of all instrumentation and meters both in the field and in the shop
• Ensure to interpret and suitably use ISA and CSA codes along with API installation practices and standards.
Pre-Commissioning & Commissioning Activities:
• Checking of lines & erected equipment with the help of P&ID & datasheets along with Construction group.
• Involved in Loop clearance, Loop flushing, chemical Cleaning and Boxup, Hydro testing & Pneumatic testing.
• Test-run of field Equipments
• Involved in Cardboard blasting, Air blowing, Nitrogen purging and drying, unloading.
• Tanks and vessel cleaning & Test-run of field Equipment’s.
• Unloading of product to commissioning the respective equipment.
• Commissioning of the Centrifugal, Gantry commissioning with respective product and etc.
• Tank inspection at commissioning time and coordinating with contractors.
• Flushing of pipe lines.
• Steam Blowing.
• Water run of the whole plant.
• Checking of cause & Effect of all system.
• Vacuum test.
• Prilling test.
• Complete Startup / Shutdown of all the sections of new plant by DCS.
• Test run of High-speed centrifugal pump.
• Test run of High-pressure positive displacement pump with variable speed.
• 105 % Load Guarantee Test of Crude Plant.
• Checking of lines & erected equipment with the help of P&ID & datasheets along with Construction group.
• Commissioning of Flare system
AREA OF EXPERIENCE
CRUDE UNIT (Capacity 245000 B/day)
Atmosferic & Vacuum Column
Naphtha splitter
Desalters (Two Stages Electrical).
Strippers.
Fired Heaters (Natural Draft).
Ejectors.
Condenser and Flash drum (K.O).
Heat exchangers and Fan Coolers.
Coalescers.
Centrifugal and positive displacement pump.
Flushing Oil system (FLO).
Chemical injection system
(filmic amine, Corrosion inhibitor, Demulsifier and H2S Scavenger)
Cooling water system.
LP, MP & HP steam Handle.
Centrifugal pumps & Steam Turbines
DCS Control panel Operations (Honeywell) TANK FARM - SLOP UNIT - FLARES SYSTEM
18 Conic and floating roof Tanks
Handling Large volume tank (550.000 Bbls).
Handling of petroleum products such as DCO, CCO, Naphtha, VGO’s, Distillates, CGO’s & SLOPS.
Internal and 3rd party audit preparations and handling.
Cathodic protection system operation.
Maximize water and sludge removal.
Ship loading and unloading terminal operation.
Tank stripping, gauging and sampling.
Pipeline transfer to other Terminal.
Oil movement and Inter Tank Transfer.
Low/ High Pressure Flare
Acid flare.
Flare Ignition systems.
Multi-product pipe line operation
Crude metering
K.O Drums.
CERTIFICATIONS AND TRAINIGS
Job Safety Analysis (JSA)
Permit to Work System & Authorization (PTW)
Hydrogen sulfide (H2S) Training
Behavior safety & Plant safety
Advanced Fire Fighting training
Confined Space Entry Training and certification
SCABA
H2S detectors and Authorized for Multi Gas test.
Personal Protective Equipment And Process Safety
Emergency Response Team member (ERT)
Incident Report
Behavior safety & Plant safety Scaffolding awareness
Spillage control & waste management
First Aid Training Program..
Lock out tag out procedure (LOTO)
Power Failure.
N2 Failure at Tank.
Instrument air Failure.
Control valves malfunctioning.
Steam failure.
Safety procedure of Fire Equipment’s.
Defensive Driving
Radiation emergencies and basic safety
SKILL AND COMPETENCIES
Programs: MS Office, MAXIMO, Aspen Process Explorer, Honeywell TDC 3000, Lotus Notes, Zimbra & SAP.
Operating Systems: Microsoft Windows and Linux.
Languages: Spanish: Native speaker / English: intermediate (oral & written)
Member: Association of Professional Venezuelan Engineers CIV-256.105
PERSONAL DETAILS
Address :
Date of Birth :
Passport No :
Notice period:
Driving license: Av. Centurión, La Estancia I, Edif 3, Nro. 3. Barcelona 6001, Anzoátegui. Venezuela.
18th March 1975
085865477 (Expire: 10-Mar-2019)
2 Week
Yes. INTT VEN - 2015