Post Job Free

Resume

Sign in

Project Manager/Construction Manager - Civil

Location:
UP, 226010, India
Salary:
SR 20000
Posted:
March 04, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

Vijay Kumar Singh

Civil Engineer 26 years’ Experience

VIJAY KUMAR SINGH, B.E (CIVIL)

*/***, ***** *****

Gomti Nagar Email ID: acy4e7@r.postjobfree.com

Lucknow – 226010

Mobile No: +91-895*******/919-***-****

Carrier Objectives:

Keeping my association with Construction of hotels, Residential Multistoried Apartments, hydropower project, Oil & Petrochemical Industries, infrastructure Works, measurement and estimation. Keenly interested in assignments of challenging works of Hotel, Hydropower Projects, Oil & Petrochemical Industries, Roads and Bridges, Multistory Building and Infrastructures Works Academics :

Intermediate with Math’s, Physics, Chemistry, Hindi and English from U.P. Board in 1983 from JNIC, Lucknow, U.P., India.

High School with Math’s, Science, Hindi, English and Tech. Art from U.P. Board in 1981 from LMIC, Lucknow, U.P. India.

Technical Qualification

B.E. In Civil Engineering from Mysore University, Mysore, India in March 1990 with First Class.

Other Qualification

COMPUTER Knowledge of MS BASIC

CARRIER GRAPH

a)

Since 11th April 2016 to 25th Feb 2017 worked with Sayed Kadhem Al Durazi & Sons B.S.C. (c), Bahrain as a Project manager and deputed at “Infrastructure Works at Diyar Homes Phase2” of 20 million US$. The project consisting the laying of underground utilities of Storm water network, Foul sewer network, Potable water line, Irrigation, Telecom, Electrical substation (05nos), Street lighting and construction of Road work. The contract start date 1st Dec 2015 and contract completion date is 31st Jan. 2017.

b)

Since 27th June 2015 to 10th april 2016 I worked with Conpeed Industrial Consultant as a Project manager for the construction of “SULB WHARF PROJECT”( phase-1) of 120mx95m size and 25million US$ project at Hidd Industrial Area, Kindom of Bahrain. We are the main contractor and project having construction of a new Wharf in Sea, ship loader, conveyor belt erection, different pipe lines (Potable water, Nitrogen pipe, Fire fighting pipeline& Hydrant) also construction of 33KV substation, Guard House & Truck Scale. The project has to be completed in Dec- 2016.

c)

Since 22nd March 2014 to 26th June 2015 I worked in SPML Infra Ltd. as Sr. Manager- Projects,For the Narmada based ER Water Supply Project – Jalore – Rajasthan, India Project cost – Rs 372 Cr.Project Brief: WTP-100 Mld, RWR- 2130 ML, RWPS, CWPS, CWR, Head works-4 Nos etc with Transmission Pipeline of dia ranging from 300mm to 1200 mm with M.S, D.I & BWSC pipes along the length of 144 KM.I completed 80KM of pipeline,02CWR,RWR and 02 Booster Pumping stations.

d)

10th March 2013 to 22 Nov. 2013 worked with Jalal Al A’Ali & Sons Co. B.s.c(c) Bahrain, as a Project Manager of 4- Lane asphalted highway named “Sheikh Jayid highway” for a length of 25Kms RPPD(Roads planning and projects directorate) Ministry of Works, Bahrain as a client. The project cost having BD 45 million including median, Laying of drainage lines, Electrical utilities etc. There is 200 mts of NDRC (Non disruptive road crossing) U/G micro tunneling at the end connection to existing sewer main line.

e)

From 24th July 2012 to 09th march 2013 worked with ABDUL REHMAN MOH’D AL – BANNA & Co. W.L.L Bahrain, as a Project Manager, For the WTD Project 4604 Al Areen DS to Hamad Town DS. I have Completed 20 Km 800mm dia DI potable transmission Waterline, 12 Chambers (AV, IVA, WO, IOW) and 8 Thrust Blocks (22- 1/2, 11 -1/4, 45 & 90 degree).

f)

Worked with Down Town Group of Companies Bahrain,

From Jan2007 to 16April 2012 worked as a Project Manager in its Sister Concern ‘Bahrain Pipeline Construction Co. WLL’

From 10th Jan 2003 to Jan 2007 worked a Project Engineer in its Sister Concern ‘Bahrain Pipeline Construction Co. WLL’

From 17th September 2001 to 9th Jan 2003 worked as a Site Engineer

Projects: Various Infrastructures, Sewerage &Roads Projects with Ministry of Works and housing.

The company undertake Sewerage & Drainage Directorate, Roads Directorate, Water Transmission works, Batelco(Bahrain telecom co),laying of electric cables(H.V/L.V and transmission lines) and SEOMD(sanitary engineering operation and maintenance) Projects and responsible for setting site office and site yards, day to day works at the site up to final account level, liaison with client and various utilities departments. Labour and Plant Control/ Management, Execution of the job as per Construction Drawings, Agreeing variation items and Measurement with Clients/Consultants etc.

I have successfully completed MAQABAH SEWEREGE SCHEME from 2001- 2003, NORTH SEHLA SEWEREGE SCHEME PROJECT from 2003-2004, From 2005 – 2007 EWA (electricity and water authority) CONSTRUCTION PROJECT FROM AL-DUR FORWARDING STATION TO WEST RIFFA BLENDING STATION DN1400, DN1200&DN800MM DIAMETER POTABLE WATER TRANSMISSION PIPELINE (34KM), From 2007-2012 I finished “Sheikh Khalifa Bin Salman express Highway” 3-lane asphalted road of BD 20 million from sub grade preparation to sub base, base coarse and wearing coarse. Also finished “Estiqlal highway” 20 KM 3-Lane asphalted road of BD 15 million from subgrade to finishing stage.

g)

From 04thOct 1999 to 31st August 2001 Worked with Jai Prakash industries Ltd as a Senior Field Engineer (Civil) at TALA Hydropower Project in Bhutan. The work consisting of construction 4.2 KM & 7 Mts dia of Tunnel Adits, Powerhouse Construction inside the hill, Twin pressure shafts (3mts dia) executed by undersigned.

h)

From 09th Feb. 1999 to 30th August 1999 Worked with VIKAS & AssociatesAs Project Engineer, Delhi base Construction Company dealing with Cooperative group housing societies building in Delhi and Gurgaon. I executed the multistory building (RCC framed structure) projects of dwelling units of 75 flats.

i)

From 11th Oct. 1996 to 8th Feb ‘99 Worked with APCO Construction Pvt. Ltd. As Project Engineer Lucknow based ‘A’ Class Govt. Contractor. Basically the company is dealing with projects of Indian Oil Corporation, CPWD and Indian Telephone Industries engaged in the Construction of18M DIA HORTON SPHERE of liquid petroleum gas plant at Varanasi in U.P, a multi dimensional project including residential house building, internal roads and area development of the plant, Completed number of projects of commercial and Residential multistory (R.C.C. Framed structure) building with different type of foundations.

j) From 1st September 1993 to 31st August 1996, Worked with ARIF Industries Ltd, (Lucknow’s Leading Construction Company) as a Project In-charge. In this duration I had completed many projects including a 3 star hotel ARIF CASTLE, Lucknow, One of the most beautiful centrally air condition hotel in Lucknow consisting Raft foundations, R.C.C. work, sanitary work, electrical work, fire fighting, fabrication work etc. I also supervised all items of finishing like P.O.P. work, marble/granite flooring, painting and wood work. I executed all the work from foundation to finishing level of multistoried residential apartments (B+Stilt+8) with basement ARIF KINGS APPARTMENT also GUL MOHAR ENCLAVE residential society of 12 Super deluxe flats.

k)

From 2nd March 1990 to 31st August 1993, Worked as Site Engineer in civil consultant, one of the leading Architects in Lucknow. Supervised the entire work foundation to finish level of 32 residential Flats in Lucknow.

Language Proficiency

Spoken : Hindi & English

Read : Hindi & English

Written : Hindi & English

Personal Details

Experience : 22 Years

Father’s Name : Sri Charan Singh

Date of Birth : 12-02-1967

Marital Status : Married

Nationality : Indian

Passport No : L 1188379 Valid Up to 09/11/2023

Permanent Address : 2/312, Vikas Khand

Gomti Nagar, Lucknow – 226010

Tel. +915***-******/+91-919*******

Bahrain COEPP Card No. : EPP / C 3242/ CE /03 –A

Bahrain CPR No. : 570224845

Bahrain Driving license No : 570224845 (valid up to 04/07/2020)

Skype Id : vijay2081

Place: Lucknow

Date: 28/02/2017

(VIJAY KUMAR SINGH)



Contact this candidate