CHRISTOPHER L. VATTER
***** ***** *** **** ***** Lane, Mount Vernon, IL 62864 618-***-****
*******@***.***
Page 1
PROFESSIONAL SUMMARY
Proven leader with twenty-nine years of Operations Management experience in dynamic, fast paced, lean manufacturing environments. Effectively directs multi-million dollar budgets, multi-facility manufacturing and inventories and interdisciplinary management teams that increase efficiency and reduce costs via implementation of lean manufacturing practices with specific experience with the Toyota Production System, the Nissan Way and the DuPont Production System. Pursues aggressive productivity improvement targets and promotes the development of the necessary mind-sets and behaviors in the management cross functional teams and workforce.
SKILL SETS
Strategic Planning Operations Management Lean Manufacturing ERP/MRP II System Implementation ISO 9001 & ISO 14001 Policy & Procedure Development Production & Inventory Control Gemba Kanri Shop Floor Control Kanban Regulatory Compliance Quality Control Personnel Development
CAREER EXPERIENCE
Production Planning Manager / Contract Administrator – DuPont Pioneer May 2015 – July 2016
Led the Planning Team consisting of seven direct reports responsible for the Quality, Scheduling, Warehouse Inventory Control, Logistics and Training departments.
Implemented and maintained SAP based training records for sixty-two full time and twenty-four contract employees in the Quality Management System covering 105 corporate level work instructions, 193 site specific Standard Operating Procedures and 57 site specific Job Safety Analysis sheets.
Chaired the Process Safety Management team of six shop floor personnel covering twelve processes.
Updated and maintained contracts for twenty seed transport providers and twenty-eight local service providers.
Chaired the Implementation Task Force responsible for Best Practices and the implementation of the DuPont Production System.
Conducted twice annual physical inventories.
Plant Operations Manager – DuPont Pioneer August 2012 – April 2015
Led the Production Team consisting of eleven direct reports responsible for the Planning, Productivity Improvement, Scheduling, Receiving, Conditioning, Treating, Packaging, Warehouse and Logistics departments.
Met corporate annual production targets of 2.5MM units of soybeans and 300,000 units of wheat by driving the Production Team to achieve short and long term performance metrics.
Trained entire workforce on Standard Operations Procedure methodologies which led to the Production Team authoring 193 Standard Operating Procedures and 57 Job Safety Analysis sheets.
Directed the development of shift reports to facilitate communication departments, shifts and management and to track progress toward Safety, Quality and Productivity goals.
Facilitated the training of the entire workforce in DuPont’s Respect for People initiative.
Supervisor, Material Control – Nissan Forklift Corporation April 2005 – March 2012
Directed ten - person distribution center team conducting receiving, packaging, picking, packing and shipping
functions in support of aftermarket sales in excess of $41M annually.
Improved quality 69% from 437 ppm down to 135 ppm by conducting root cause analysis of every return material receipt and tightening picking and packing procedures.
Raised productivity 32%, from an average 35.7 lines per hour, to an average 52.6 lines per hour through head count reduction, process improvements and cross training of the workforce, saving $400,000 annually.
Reduced over-time hours 93% from 208 hours per month to 13 hours per month by stabilizing the workforce and improving schedule of daily operations saving approximately $6,000.00 per month.
Assumed responsibility of packaging and return material operations without increase in department headcount.
CHRISTOPHER L. VATTER
14105 North Two Mile Creek Lane, Mount Vernon, IL 62864 618-***-****
*******@***.***
Page 2
CAREER EXPERIENCE (continued)
Supervisor, Material Control – Nissan Forklift Corporation April 2005 – March 2012
Supervised forty material control and three cycle count personnel in support of three assembly lines, three weld lines, one fabrication and one paint department in lean manufacturing environment supporting production of up to fifty-two finished vehicles per day.
Implemented new forty-three-unit RF barcode scanning system ahead of schedule and under budget that increased picking accuracy rate to 99.98% while on assignment out of the country.
Achieved a 30% improvement in quality defects per unit measurement by re-layout of existing warehouses supporting Nissan, Mast and Barrett Assembly Lines.
Consolidated the Weld Warehouse material handling functions eliminating redundant operations and improving productivity 14%.
Authored 80 Standard Operation Sheets for the Material Control Department as part of the Nissan Way production system implementation.
Reduced on hand line inventory from one hour to thirty minutes while maintaining delivery to TAKT Time.
Member of design team that produced an automated chain cutter that served the Mast Assembly Line and allowed the elimination of over one hundred stocked finished mast chains.
Conducted annual physical inventories resulting in total variance of less than $14,000 on inventory of $14MM.
Account Executive - First Investors, Incorporated March 2003 – April 2005
Provided financial planning and wealth management services to existing clients and organizations.
Developed new clients and maintained the highest appointment rate in the Chicago office.
Materials Manager – Dur-O-Wal, Incorporated September 2001 – November 2002
Eliminated production disruptions by negotiating annual blanket purchases of key raw materials resulting in a $300,000 savings and a 45% inventory reduction over the period of three months.
Supported a $2.5M monthly revenue stream and corporate inventory levels at or below target of $5.7M across one production plant and four regional distribution centers nationwide.
Directed planning and scheduling functions for three manufacturing and five warehouse departments in a lean manufacturing environment generating an increase to 1.2 M linear feet from 500,000 linear feet/day.
Negotiated raw materials (steel rod, coil, bar, sheet and wire) and finished goods contracts, ensuring cost containment and compliance with corporate profitability and production capacity goals.
Production Manager – Pursuit Marketing, Incorporated June 1999 – August 2001
Led production expansion efforts, establishing and managing operations for sub assembly, finished goods assembly, packaging and aftermarket product lines during an explosive three- year growth period supporting $75M in sales with inventories of less than $2.24M in a cellular manufacturing environment.
Achieved savings over $321,000 annually by implementing critical component design modifications and securing a new source for the component.
Devised a new assembly method for a three-piece barrel after the original method’s failure, while under extreme pressure to meet the original product launch date and saving $30,000 of component inventory.
Led a large scale development initiative that included the expansion from 30,000 units, 8 models and 8 production personnel in 1999 to 230,000 units, 32 models and 23 production personnel in 2001.
Oversaw twenty-seven domestic suppliers and subcontractors to maintain the orderly flow of raw materials and components to support production and capacity plans during two production facility relocations.
Coordinated the move of all raw material and fabrication functions from twenty-seven domestic suppliers to China when production requirements far exceeded domestic supplier’s capacity.
Chief Production Planner – Henry Pratt Company July 1997 – March 1999
Improved scheduling accuracy 27% by identifying and correcting 44 rubber mold assembly routing errors.
Increased second shift shipments by 20% by reorganizing work content and material flow within the shipping department.
CHRISTOPHER L. VATTER
14105 North Two Mile Creek Lane, Mount Vernon, IL 62864 618-***-****
*******@***.***
Page 3
Production Control Manager – Lovejoy, Incorporated July 1995 – June 1997
Corrected over 1,600 bill of material and manufacturing routing errors by initiating and leading daily production meetings with production control, engineering and shop floor departments.
Corrected 5,400 MPS Bills of Material errors resulting in significantly increased MRP Scheduling performance.
Production Control Manager – Rixon Firemark, Incorporated April 1994 – June 1995
Led two production planners and two warehouse / receiving personnel in development and execution of daily
production schedule and receiving operations.
Inventory Control Supervisor – Miller Fluid Power, Incorporated July 1987 – April 1994
Directed two facility planners, two cycle counters and four parts warehouse personnel in daily inventory planning,
cycle count operations and parts distribution activities.
Trained entire three hundred and fifty-person workforce in the use of a Kanban production / inventory control system
authoring a one hundred and fifty question test in which employees achieved over a 90% pass rate.
Member on four separate MRP II system implementations over period of four and one half years.
EDUCATION & TRAINING
MS, Operations Management – Northern Illinois University January 2008 – May 2012
BS, Operations Management – Northern Illinois University August 1985 – May 1987
Industrial Engineering Courses – University of Wisconsin, Platteville August 1981 – May 1984
DuPont Production System Ongoing
OSHA 30 Construction January 2016
DuPont Respect for People Facilitator November 2012
The Nissan Way Production System April 2005 – March 2012
Genba Kanri – Shop Floor Management Sept 2009
8D Advanced Training Sept 2008
Advanced Statistics July 2008
Basic Statistics May 2008
Supervisory Training - Nissan North America / Smyrna, Tennessee Nov 2007
Nissan Production Way Nov 2006
Toyota Production System July 1992 – April 1994
APICS Coursework July 1987 – January 1990
INTERESTS
Woodworking, Guitars, Model Building, Martial Arts, Skiing, Camping, White Water Rafting
REFERENCES
Available on Request.