Akelius Management Corporation Brooklyn, NY
Superintendent – 115 unit apartment building; oversaw a staff of 6 people; Worked with the Yardi System on iPhone.
Work Orders – Distributed work orders daily.
Preventative maintenance – Walk troughs; Inventory; Checking sprinkler system weekly; Check buildings for cleanliness; check elevators; oiled machinery in elevators once a week.
Boilers – Checked boilers and ordered oil when needed; checked for leaks.
Inventory – Order supplies, as needed.
Electrical Work – Basic wiring, lighting; installed light switches and sockets
Plumbing – Toilet repaired/replaced, pipes repaired, snaked drains, sinks and tubs, re-glazed bathtubs;
replaced drain pipes and water supplies
Tile Work – Removal/Installation of ceramic tiles, vinyl tile, re-grouting
Roof – repairs.
Windows – Repaired/replaced glass, springs and hardware
Carpentry –Renovated bathrooms; renovated kitchens; Renovated full apartments; installed and removed walls; taped and hung sheetrock; beam replacement; wood & metal stud replacement; repaired and replaced cabinets and countertops; installed new doors and tracking plus door jams; plastered; painted apartments; sanded and poly-urethaned parquet floors; wallpaper hanging and removal; repaired and replaced locks (all types)
7/2016-8/2016
Safety Facility Services New York, NY
Handyman – 136 unit building for a Residential/Hotel in Manhattan
Painting, Plastering, Lock Repair, Carpentry, Plumbing, Electrical Repairs, Prepare apartments for moving
2/2016-5/2016
Metropolitan Realty Group Brooklyn, NY
Superintendent – 200 unit apartment buildings; oversaw staff of 8 people;
Work Orders – Distributed work orders daily.
Preventative maintenance – Walk troughs; Inventory; Checking sprinkler system weekly; Check buildings for cleanliness; check elevators; oiled machinery in elevators once a week.
Boilers – Checked boilers and ordered oil when needed; checked for leaks.
Inventory – Order supplies, as needed.
Electrical Work – Basic wiring, lighting; installed light switches and sockets
Plumbing – Toilet repaired/replaced, pipes repaired, snaked drains, sinks and tubs, re-glazed bathtubs;
replaced drain pipes and water supplies
Tile Work – Removal/Installation of ceramic tiles, vinyl tile, re-grouting
Roof – repairs.
Windows – Repaired/replaced glass, springs and hardware
Carpentry –Renovated bathrooms; renovated kitchens; Renovated full apartments; installed and removed walls; taped and hung sheetrock; beam replacement; wood & metal stud replacement; repaired and replaced cabinets and countertops; installed new doors and tracking plus door jams; plastered; painted apartments;; wallpaper hanging and removal; repaired and replaced locks (all types)
2012-2015
M.C. O’Brien Management Bell Harbor, NY
Superintendent – 40 unit co-op building on Beach Channel Drive in Belle Harbor.
Landscaping – Cut grass with regular push mower. Excavating using Bobcat
Electrical Work – Basic wiring, lighting; installed light switches and sockets
Plumbing – Toilet repaired/replaced, pipes repaired, snaked drains, sinks and tubs, re-glazed bathtubs;
replaced drain pipes and water supplies
Tile Work – Removal/Installation of ceramic tiles, vinyl tile, re-grouting
Boilers – Maintain and repair steam heat, boiler #6, check oil levels, order oil, refill boiler, clean tubes,
oil filter and maintained all pumps
Roof Work – Installed and maintained rubber roof on top of building and top of garage area
Windows – Repaired/replaced glass, springs and hardware
Carpentry –Renovated bathrooms; renovated kitchens; Renovated full apartments; installed and removed walls; taped and hung sheetrock; beam replacement; wood & metal stud replacement; repaired and replaced cabinets and countertops; installed new doors and tracking plus door jams; plastered; painted apartments; sanded and poly-urethaned parquet floors; wallpaper hanging and removal; repaired and replaced locks (all types)
General Maintenance – Painted entire building, hallways, doors, and stairwell; garbage collecting, recycling
and removal; replaced and installed ovens; checked all emergency and non-emergency lighting; wax all
floors and lobby, maintained elevator; mopped and waxed floors and stairwell; met all building inspectors,
NYC, FDNY, and Fire Extinguisher inspectors; gave access to gas and electrical meter readers and
exterminators
Daily Maintenance – Sweeping front of building; cleaned laundry room; responded to all tenant complaints/problems and inquiries
2007-2012
Ari Management Rockaway, NY
Superintendent – 64 apartment building on Beach 117th Street in Rockaway Park. Renovated 35 out of 64 apartments.
Landscaping – Cut grass with regular push mower. Excavating using Bobcat
Cement Work – Removed crumbling cement ceiling in tunnel
Electrical Work – Basic wiring, lighting; installed light switches and sockets
Plumbing – Toilet repaired/replaced, pipes repaired, snaked drains, sinks and tubs, re-glazed bathtubs;
replaced drain pipes and water supplies
Tile Work – Removal/Installation of ceramic tiles, vinyl tile, re-grouting
Boilers – Maintain and repair steam heat, boiler #6, check oil levels, order oil, refill boiler, clean tubes, oil
filter and maintained all pumps
Roof Work – Installed and maintained rubber roof on top of building and top of garage area
Windows – Repaired/replaced glass, springs and hardware
Carpentry –Renovated bathrooms; renovated kitchens; installed and removed walls; taped and hung sheetrock; beam replacement; wood & metal stud replacement; repaired and replaced cabinets and countertops; installed new doors and tracking plus door jams; plastered; painted; sanded and wallpaper hanging and removal; repaired and replaced locks (all types)
General Maintenance – Painted entire building, hallways, doors, and stairwell; garbage collecting, recycling
and removal; replaced and installed ovens; checked all emergency and non-emergency lighting; wax all floors
and lobby, maintain elevator; mop and wax floors and stairwell; met all building inspectors, NYC, FDNY, and
Fire Extinguisher inspectors; gave access to gas and electrical meter readers and exterminators
Daily Maintenance – Sweeping front of building; cleaning all incinerator rooms and garbage chute; cleaned laundry room; respond to all tenant complaints/problems and inquiries
1993-2007
Marine Park Luxury Apartments Brooklyn, NY
Superintendent – 144 garden apartments over 4 blocks on Fillmore Avenue in Marine Park, Brooklyn
Landscaping – Cutting grass with drive mowers and mowers; tree and bush trimming, planting and removal
Cement Work – Brickwork, steps, sidewalks, replaced all walks and stairs for all 72 common doors.
Electrical Work – Basic wiring, lighting; installed light switches and sockets
Plumbing – Toilet repairs/replacements, pipe repairs, snaking drains, sinks and tubs
Boilers – Worked with hot water heat and boilers #2 oil, #6 oil and steam boilers. Have NYCFD P99 Certification for Fitness. Maintained 4 boilers over a 4 block area
Roof Work – Installed and maintained rubber and grafite roofs
Windows – Repaired/replaced glass, spring and hardware
Carpentry - Renovated bathrooms; renovated kitchens; installed and removed walls; taped and hung sheetrock; beam replacement; wood & metal stud replacement; repaired cabinets and countertops; installed doors and tracking; plastered; painted; sanded and poly-urethaned wood floors; repaired and replaced cabinets and countertops; repaired and replaced locks (all types),
General Maintenance –garbage collecting, recycling and removal, snow removal using Bobcat