Eleven (11) years of experience in the field of piping design, engineering, construction and interface management . Work includes piping engineering layouts using PDS Piping and PDS Equipment Modeling and SP3D software. Prepares and completes isometric drawing production using Microstation and Smart Sketch. Develop equipment and piping models. Has construction experience such as the following: Coordination with the construction group for the engineering change notice (ECN) and request for information (RFI). Resolve engineering punch list items generated from the system joint walk down (Client and Fluor). Has experience with various process, flare, drain, utility, pipe rack, port storage and modular piping.
Specific Experience:
RAPID UIO
September 2014- Present
Piping Interface Coordinator
Implements and stewards the project interface management process between various contractors on the projects.
Ensure alignment with other EPCC contractors like (TOYO,ASU, CCSM,SEG, TRSA, Samsung and 20C1).
Conduct 3D model reviews with other EPCC.
Facilitate regular communication between contractors to ensure interface execution and close out.
Work with Project engineers to highlight and help resolve any associated contractual/potential change orders arising from interface issues.
Maintain the Interface management tool that outlines all the interface agreements.
Model equipment and pipes using optimeyes software for the estimates. Anadarko Mozambique
May 2014– July 2014
Area Lead/Designer
A workshare project with Houston Office (FEED)
Model the preliminary routing of pipes and equipment to be used in estimate using optimeyes BASF TDI Project (FLUOR Haarlem)
October 2013- April 2014
Checker/Backup Area Lead
A workshare project with Poland and New Delhi Office.
Assigned in Haarlem, The Netherlands Fluor Office.
Functioned as back up area lead for the TDA process unit.
Checked the model and provide guidance to the New Delhi and Poland designers doing piping and equipment modeling.
Checked the pipe supports details, location control plan and steam tracing details.
Monitor the status of the isometrics that are on hold in order to know the status of the project. SADARA Ras Tanura Integrated Project
December 2011– October 2013
Area Lead
A work share project with Houston office
Functioned as Area Lead for the Chemicals II Area.
Handled five (5) designers and provided them the piping activities for a particular unit.
Provided progress reports with respect to the assigned area.
Layout the pieces of equipment and pipes using SP3D software and generate 2D drawings using Smart Sketch.
Communicates and interfaces with other project design and engineering disciplines for clash checks and updates.
Monitor the status of the isometrics that are on hold in order to know the status of the project.
Attends the Client model reviews.
Provide the guidance to the six (6) piping designers doing the piping modeling in
SP3D.
Develop the isometric hold lists for monitoring.
Spot check isometrics before submitting for formal checking. Shell Hijau Project
September - November 2011
Area Lead/Piping Designer
A Manila full execution project.
Handled six (6) piping partition models for completion of the lines, extraction and issuance of Issued for Construction (IFC) isometrics.
Review and check the master P&ID’s for changes that was done on the area of under my responsibility.
Coordinated with the other engineering disciplines for the interface activities.
Squad checked vendor drawings (pumps, vessels, column etc) to make sure that the equipment models are updated and aligned with the latest vendor information. Quellaveco Project
July 2011 - August 2011
Area Lead
A workshare project with Santiago office
Functioned as Area Lead for the Flotation Area.
Review scope of work, project specifications, and technical practices.
Layout the pipe and model the equipment as per P&ID and client comment.
Attend the weekly task force meeting for project updates reporting
Communicates and interfaces with other project design and engineering disciplines for clash checks and updates.
IPSII Project (FLUOR (China) BASF-YPC
November 2008 - June 2011
Area Lead / Field Engineer
Involved in FEED (Front End Engineering and Design) to Mechanical Completion.
Participate in the model review and technical coordination meetings with the Chinese design Institutes (CDI).
Develop control level schedule for the piping activities.
Generate the piping isometric issue schedule and update or reforecast as necessary.
Provide field engineering support to construction.
Inspect constructed piping lines and generate punch list items for construction to follow.
Review hydro test packages and did the pre hydro and engineering walk downs, engineering walk downs with the maintenance and plant operations prior to mechanical completion
Involved in TAR (Turnaround) planning which includes all the activities to be done during the shutdown.Prepare tie-in packages and necessary documents to support the TAR. Saudi Kayan Petrochemical Project
Al Jubail, Kingdom of Saudi Arabia
Area Lead
May 2007 – November 2008
A workshare project with the Fluor’s Camberley and Houston office.
Functioned as an Area Lead for the Port Storage Facility. Handled six (6) designers, making sure that each has enough work to do and make sure that the isometric issue schedule are met.
Review scope of work, project specifications, and technical practices.
Develop and check system design drawings in conformance with Project Specifications, Design Parameters, Codes and Industry Practices using PDS (Plant Design System), Equipment Modeling, Auto Pipe, Microstation, PD Draw and AutoCAD programs.
Communicates and interfaces with other project design and engineering disciplines for clash checks and updates.
Review pipe routing in the piping model, check and back check isometric drawings against P&ID, Specifications, Standards and Equipment vendor information for final issuance to fabrication contractor.
Attend the weekly task force meeting for project updates reporting
Participate in the model review and technical coordination with the home office counterparts and with the clients (formal model reviews).
Inform on a regular basis the designers on information needed (P&ID changes, new vendor drawings, squad checks, etc.) for their daily piping activities.
Coordinate and provide the stress isometrics to the stress group for their analysis.
Acted as a backup Design Applications Specialist (DAS) for the area of responsibility. Responsible for the piping utilities, like the (PLSR) pipeline status record, (IDP) Interference Detection Process and the resolution of the daily concerns of the piping designers.
Golden Eagle Coker Modification Project Tesoro
Golden Eagle Refinery
Martinez, California
Piping Designer
August 2006 – April 2007
A workshare project with the Fluor’s, Long Beach California, USA Office.
Updated the master P&ID file for all the changes initiated by the Long Beach and Manila office especially on the area under my responsibility.
Handled six (6) piping partition models for completion of the lines, extraction and issuance of Issued for Construction (IFC) isometrics.
Review and check the master P&ID’s for changes that was done on the area of under my responsibility.
Coordinated with the other engineering disciplines for the interface activities.
Squad checked vendor drawings (pumps, vessels, strainers etc) to make sure that the equipment models are updated and aligned with the latest vendor information.
Provide on a regular basis the Lead Engineer\Design Supervisor reports on the completed piping activities
Coordinate and provide the stress isometrics to the stress group for their analysis. Bohai Bay Area Development Project
ConocoPhillips China
Spool Coordinator/Designer
August 2005 – July 2006
A workshare project with the Fluor’s, Houston - USA Office.
Updated the master P&ID file for all the changes initiated by the Houston and Manila office. Makes sure that all the designers were using the updated P&ID file.
Mastered the use of the isometric control record for the tracking off all isometrics generated by the designers.
Transmits AFC isometrics to the Houston office for issue to fabrication.
Generated Location Control Plans (LCP) for AFD and update for AFC issue
Generated isometrics for checking
Updated isometrics using microstation per the comments of the checkers. Trainings Successfully Completed:
Piping Design (Phase 1)
Piping Design (Phase 11)
Piping Design (Phase III)
Microstation
Plant Design System (PDS)
Equipment Modeling
Smart Plant Review (SPR)
Basic Stress
Advance Stress (Auto Pipe)
Advance PDS Course (DAS)
SP3D
Optimeys
Internal Quality Auditors Training
Supervisor’s Training
Lead Engineer’s Training
Writing Scope of Work
Cost Competitive Execution
Client Service Excellence
PMP Prep Program (Ikompass)
New Leaders Program (Harvard Manage Mentor)