CURRICULUM-VITAE
BHAGWAN SINGH
H.No.-*, Santosh Nagar
Housing Board colony
Sehore (M.P.)
Phone:-099******** acxtto@r.postjobfree.com
OBJECTIVE:
Intend to build a career with leading corporate of Hi-Tech environment with
committed and dedicated people, which will help me to explore myself fully and release
my potential. Willing to work as a key player in challenging and creative environment.
EDUCATION:
1. Certificate in PLC, SCADA &Autocad Training from Beyond industrial &
Project Ltd.
2. Master of Business Administration in Project management from Sikkim Manipal
University (DE)
3. B.E. in Electrical Engineering from College Of Technology & Engineering
Udaipur, Maharana Pratap University Agriculture & Technology, Udaipur.
4. Higher Secondary passed from Board of Secondary Education
Ajmer (Raj.)
5. Secondary passed from Board of Secondary Education,
Ajmer (Raj.).
PRACTICAL TRAINING & SEMINAR:
30 days training taken at Kota Thermal Power Station, Kota (Raj.)
45 days training taken at Birla Manglam Cement Factory, Morak, Kota (Raj.)
Presented Seminar on“Temperature Sensing Voltage Fan Regulator “
MINOR PROJECT: DC Motor Control Using Single Switch.
MAJOR PROJECT: Moving Message Display Using Microcontroller.
Project:-1.
Presently working in Feedback infra Private Ltd in as a Resident Engineer
This is Project Management Consultancy in Feeder Separation Programme in Madhya
Pradesh Madhya Kshetiya Vidhyut Vitran Company Ltd., Bhopal (M.P.)
The project, costing about INR 74 cores, includes 47 Nos. 11KV Feeders of line length
550 KM, Re-conductoring of Existing 11KV line, 23 new 11 KV Bay,
11kV/440V New Distribution Transformer (25KVA), Shifting of Distribution
Transformers (25, 63 & 100KVA), AB Cabling work up to 800KM & Meterisation
works under Feeder Separation Project.
Project:-2.
I had worked in Feedback infra Private Ltd in as a Resident Engineer
This is Project Management Consultancy in Feeder Separation Programme in Madhya
Pradesh Purva KshetiyaVidhyut Vitran Company Ltd., Jabalpur (M.P.)
The project, costing about INR 50 cores, includes 62 Nos. 11KV Feeders of line length
700KM, Re-conductoring of Existing 11KV line up to 100KM, 15 new 11 KV Bay,
11kV/440V New Distribution Transformer (25KVA), Shifting of Distribution
Transformers (25, 63 & 100KVA), AB Cabling work up to 600KM & Meterisation
works under Feeder Separation Project.
Project:-3.
I had worked in A2Z Maintenance & Engineering Services.Ltd, in as a Project
Manager, work related to EPC, High Voltage Distribution System(HVDS)
Project in Indore (M.P.)
Sope of work:- The project includes New 11KV Line of line, 11kV/440V New
Distribution Transformer (25KVA), different size of AB Cabling work & Meterisation
Works under HVDS Project.
Responsibilities: Manage overall project including erection, Commissioning &
commercial activity related to invoice, Billing end to end responsibility, routine meting
with S.E./R.A.O./Joint Director/Director Finance, Attending meeting at
circle/Region/CMD level. Liaisoning all level in M.P.K.V.V.C.L, Indore. Take Charging
Permission from Electrical Inspector, Indore
Project:-4
Augmentation of Existing 11 kV Line Conductor with additional
support/D.P. and shifting of Transformers to load center Under ST(N) Works in Indore
Region.
Scope of work:- Preparations of project status report/project completion report.
Erection Testing and Commissioning of Transformers of 10KVA, 16KVA & 25KVA.
Construction of new LT Lines on AB cable, 11 KV Lines.
Testing & Commissioning of Electrical Protection System & Equipment.
Project Management: Knowledge of all project phases: documentation, materials and
equipment procurement, installation and commissioning at site, management of staff for
timely implementation of ST(N) project.
Various reporting like Manpower report etc.
Check Survey Drawing and Prepare Bill of Material Village wise.
Project:-5.
HVDS Project In Jhalawar Circle Rajasthan which Villages population more than
5000.
Scope of work:- Preparations of project status report/project completion report.
Erection Testing and Commissioning of Transformers of 10KVA, 16KVA & 25KVA.
Construction of new LT Lines on AB cable, 11 KV Lines.
Testing & Commissioning of Electrical Protection System & Equipment.
Project Management: Knowledge of all project phases: documentation, materials and
equipment procurement, installation and commissioning at site, management of staff for
timely implementation of HVDS project.
Various reporting like Manpower report etc.
Check Survey Drawing and Prepare Bill of Material Village wise.
Project:-6
Supply of material, Installation, erection, commissioning of 33kv/11 KV Sub-Station 2 Nos.(2X 3.15MVA T/F,33 KV line-20 kms)
Activities Performed-:
Follow up with client and consultant for receiving the construction drawings and prepare BOQ according to same and discuss with my senior to arrange resources (Manpower, tools, team requirement etc.) Customer handling, settlement of grievances at local level/ feedbacks to H.O resource status, keeping team.
Monitoring & Supervising day to day progress of the sites by inspection & take out the punch point for rectification, commissioning, testing of lines(33KV ).
Responsible for timely completion of project rollout.
Follow up of deliveries and customer acceptance of deliveries of equipment materials and implementation of services.
Planning of target sites for next month, movement of subcontractor teams accordingly.
Reconciliation of invoices, payments etc. with vendors/subcontractors.
PERSONAL PROFILE:
Name: - Bhagwan Singh
Date of Birth: - 03-July-1974
Father’s Name: - Mr. Kanh Singh Chauhan
Sex: - Male
Material Status:- Married
Hobby: - MakingFriend,Playing
Languages: - Known English, Hindi
Nationality: - Indian
Permanent Address:- H.No.174,M.G. Colony, Jhalrapatan -326023 (Raj.)
Phone No. 099********, 089********
Declaration:
I consider myself familiar with Electrical Engineering aspects. I am also confident of my
ability to work in a team.
Date:
Place:
Signature
Bhagwan Singh