Covering letter
From
TDK Yokesh,
**A/*** Khanapalayam 2nd Street,
Madurai - 625009,
Tamil Nadu,
India.
acxtqp@r.postjobfree.com
Mobile : +917*********
Dear sir/ madam.
I am confident that my combination of practical experience and educational qualification has enabled me for making a contribution in the specified field. I understand the level of professionalism and communication skills required for a long term success in field. My background & professional approach to work will provide your firm a highly productive support. I declare that all the mentioned details are best to my knowledge and belief. So kindly go through the copy of resume attached & give favorable feedback.
Thanking you.
TDK YOKESH
Mob: +91-709******* (India),
+601********* (Malaysia),
acxtqp@r.postjobfree.com
My objective is to express my willingness to learn, steadfastness, reliability, credibility and that my efforts will result in win-win situations, by having a deep belief that ongoing personnel development. Seeking a welding engineer / QA/QC Engineer position with an oil and Gas fabrication yard / plant /construction ( offshore and onshore) company where I can develop and enhance the mechanical systems of the production plant with my welding skills.
Experience
5+ years of professional experience in the field of Inspection in welding / Piping /structure / Fabrication & Erection / Equipment Industrial Petrochemical plant, Refineries, Aluminum Smelter Projects & LNG ISBL Module Fabrication as a Mechanical QA/QC Engineer / Mechanical QA/QC Inspector . And Presently as International Welding Engineer .
KEY RESULT AREAS
Approved Welding and Piping Inspector by Bechtel Corporation, Worley parsons and Fluor, Samsung, Five Solios and Chevron International .
Welding Engineer.
NDE Co-ordination
Piping, Structural and Equipment ( Static and Rotary )inspection
Testing and assisting Pre commissioning.
Construction off shore and LNG modules .
EDUCATIONAL QUALIFICATION
1 .B.Tech Mechanical Engineer -(2005-2010)
2. Diploma in International Welding Engineer ( IIW/IWE)-2016
3. CSWIP 3.1 ( Cert No. 80000 )
4. ASNT LEVEL II ( RT, UT, PT, UT )
5. ISO 9001:2015 QMS Lead Auditor ( on going )
6. Familiar with ASME and ISO Standards
PROFESSIONAL EXPERIENCE:
SAPURAKENCANA PETROLEUM,MALAYSIA
FEB 2014 – APRIL 2016
QC ( Piping and Welding )
Project : Wheatstone ISBL LNG Module, Onslow.
Client: Bechtel International INC. & Bechtel OG&C/Chevron
NASSER-AL-HAJRI CORP, SAUDI ARABIA JULY 2011 - JULY 2013
MECHANICAL QA/QC ENGINEER
Project : MAADEN Aluminium smelter
Client : ALCOA and Bechtel International
Project : Liquid Pitch Storage Tanks and Gas Treatment Centre
Client : Five Solios (PSA 2000 ) and Bechtel International
Project : SAMSUNG Coke Silo.
Client : ALCOA, Bechtel International and Samsung Engineering
QA/QC INSPECTOR ( PIPING AND WELDING )
Project : Calcination Plant
Client : Worley Parsons and Fluor joint Venture
KOCHI REFINERY LIMITED, INDIA AUGUST 2010 - JUNE 2011
QA/QC TRAINEE
Project : BPCL Fabrication Shop
Client : BPCL
DUTIES & RESPONSIBILITIES
Co-ordinating with customer and clients.
QA/QC plan and ITP preparation as per required codes and clients requirement.
Involved in welding inspection and coordinated in Non-Destructive Examinations and Radiographic Film interpretation.
Welding assessments as per client procedure
Verification of isometric drawing with respect to P&ID.
Raw material inspection
Visual inspection of fabrication and site welds.
Stage-wise inspections and fabrication of piping, structures and installation of equipment.
Reviewing the applicable instruments for inspection with valid calibration certificates.
Quality check on the piping material/ accessories and installation as per the Quality Specifications/ Manual
Preparation of inspection reports for different stages and keeping records.
Equipment installation and inspection and maintain the necessary documents /
VERIFICATION OF WELDING & NDT DOCUMENTS:
Ensure Welders are qualified as per the applicable code, a register is maintained to monitor .
Ensure NDE procedures/WPS/ PQR are prepared/ established and approved as per the applicable code.
Renewal/re- test process.
Ensure that the welding consumables are handled as per approved procedures.
Ensure the AFC piping isometrics are in place with current revision.
Ensure the piping & pipe fitting materials are handled / stored and preserved as per approved procedures. Ensure the issue/receive the materials and traceability are maintained
Welders and welding operators are trained/qualified as per applicable code and are currently valid. ( ASME IX, API 1104, AWS D1.1 )
MANAGING PIPING QUALITY CONTROL AND STRUCTURAL
Piping Quality control plans prepared/reviewed and approved.
Ensure Line Pipes, Fittings and Valves, Gaskets, bolts & nuts materials are receive -inspected as per the Inspection and Test Plan.
Ensure Dimensional stability to AFC drawing, Materials spec, heat numbers, mechanical properties to drawing and material test certificate.
Ensure edge preparations are carried out and the bevel is clean and the bevel angle is checked prior to fit-up as per QCP/ITP.
Ensure ISO spool fit-up is carried out and the fit up is made by competent pipe fitters. Ensure the pipe fitter has the right tools. Ensure no excess mis-alignment is allowed and the root gap and the geometrical parameters are ensured as per AFC drawing, code and AFC WPS.
Sub-assembly and final dimensional inspection to the approved drawing
Ensure Electrodes/filler wires and other consumables are as per AFC WPS
Pre-heating if any
Root welding visual inspection, NDE if required
Checking of the inter pass temperature & recording the parameters as per WPS
Final welding visual inspection, NDE if required
Welding inspection.( surveillance checks before, during and after welding )
Ensure that all NDT specified are carried out and the reports are reviewed.
Interpretation of radiographic films and repair/NDT activities if needed.
Monitor PWHT operation, review charts and reports.
Ensure hardness after PWHT to confirm the adequacy of PWHT and do RT & MT if specified.
Ensure bolt torque is carried out at flanged joints as per procedure.
Ensure Pre- commissioning activities are met as air bubble leak test, pneumatic test, hydro test, thickness check etc.
Witness air bubble leak test, hydro test and review the charts and reports.
Non confirming products are identified/rectified and re-checked.
Ensure the pipe spools are handled as per procedure and without damage.
Ensure NDT is fully carried out/accepted as per code.
Ensure the punch list is done and punch listed is attended properly.
Ensure a final piping line checks are carried out and all the valves open/close positions are done in co-ordination with Commissioning Engineer. This shall be ensured that all piping lines with correct ratings are available – ready for commissioning.
Co-ordinate with commissioning activities.
Structure inspection in yard, installation as AFC drawing, alignment and bolt tightening, welding and NDT.
HYDROTEST OF PIPNG
Witnessing the Hydro testing of the pipelines.
Prepare hydro test packages, line checks and punch listing.
Control of Non conformities. Issuance of punch list.
Witnessing of pneumatic test hydro test, flushing & system lay up.
Both in shop and in erection field.
Preparing and maintaining various QA/QC documents and final test packages.
Making of Reinstatement Punch list and clearing the items.
Witnessing of flange Joint assembly.
Witnessing of Bolt Torquing
Clearing of MCC (Mechanical Completion certificate) items.
Reinstatement inspection of completed /erected pipelines.
Witness of alignment, orientation and dimensions of installed piping
Assure that all joints are exposed for examination during pressure test.
Ensuring vents are opened when filling and draining lines.
Confirm repairs, re-testing and re-inspection in accordance with specifications.
Ensure blinds are removed and correct gaskets are installed.
Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per latest drawings for construction, code and specification standards
Prepared documents, procedures for inspection methods, inspection and testing plan in computerized environment.
DOCUMENTATION
WITS ( Bechtel Welding Inspection Report ) register updating and monitoring on daily basis
Test package preparation and compilation .
ASBUILT preparation as per site condition .
All the results of the inspections and tests are reported on a daily basis and the reports are reviewed and approved to the applicable code and to the customer specifications. Any deviations shall be documented and resolved.
Quality records shall be compiled in a test pack or called Quality Control Test Pack and submitted for final approval along with as built-drawing.
Documents & Records Control shall be maintained as documented Quality System described in ISO 9001:2000
PERSONAL DATA:-
Name : TDK YOKESH.
Fathers Name : TD KANNAN
Marital Status : Single
Passport No : J2714415
Date of Issue : 26/09/2008
Date of Expiry : 25/09/2018
Nationality : Indian.
Address : 119/35-A, Khanpalayam 2nd Street,
Madurai – 625009,
Tamil Nadu,
India.
Mobile No : +917********* (India)
Reference
1. Raymond Gasper (acxtqp@r.postjobfree.com) – Lead Welding Engineer, Bechtel Corporation.
2. Sami Ahmed (acxtqp@r.postjobfree.com) – Mechanical Engineer, Bechtel Corporation.
3. Mark Chadderton (acxtqp@r.postjobfree.com) – Operation Advisor, Chevron.
4. Srinivasan Binish (acxtqp@r.postjobfree.com) – Area Field Engineer, Bechtel Corporation.
5. Kalimuthu Ponniah (acxtqp@r.postjobfree.com) – QA/QC Manager (Wheatstone LNG) Sapurakencana Petroleum.
Declaration :
I here by declare that the above information given is true and accurate to the best of my Knowledge.
Place: Madurai
Date: