William L. Martin
Aransas Pass, TX 78336
Email: acxtfp@r.postjobfree.com
QUALIFICATIONS:
Over 15 years experience in heavy construction management. Job titles held: I&E Superintendent, Assistant Project Engineer, General Foreman,Subcontract Administrator, Coordinate electrical construction. worked with PG&E,LADWP,SCE&G,AEP in Power plants & Sub.
EMPLOYMENT HISTORY:
WLM- LLC, Aransas Pass,TX. Electrical Consultant, Electrical Q. A. 1/2013
Commissioning and start-up, Coordinate electrical construction worked,
Responsible for scheduling and directing the sequence of work
Alston, Gregory, TX 7/2012 – 11/2012 – TPCO America – Project Manager
•Coordinated all contractors building substation which included concrete ground up foundations and all equipment
Century West Projects, Inc., Cranfills Gap, TX 1/2012 – 4/2012 - Electrical Consultant contracted to Jubail Water & Power for 3 mounth
•Inspected construction on water and power project in Saudi Arabia
Bay Electric, Corpus Christi, TX 11/2010-12/2011 – Electrical work.
Trident Environmental, Colusa, CA. 5/2010 –8/2010 - I & E Superintendent
contracted to PG & E for 4 mounth Power Plant in Colusa, CA.
•QA & QC overseeing electrical installation.
Bechtel Corporation, Bedford KY, 1/2009-1/2010 - Electrical Superintendent for Trimble County Unit 2
• Responsible for scheduling and directing the sequence of work for five crews of electrical workers.
Think Energy, Houston TX, 3/2008-12/2008 - I & E Superintendent
* Coordinated all contractors responsible for all aspects of the MSA project
JM Davidson, Ingleside TX, 1/2007-1/2008 I&E Superintendent
•Coordinated all aspects of the electrical and instrumentation construction of a bio-diesel plant Commissioning and start-up.
•While working for JM Davidson, coordinated retro work in 4 separate AEP substations.
MMR Group, Ingleside, TX 6/2006-1/2007 - Electrical work
Bechtel Construction, Pass Christian, MS 9/2005-1/2006 - Coordinated work of all subcontracters
CALPINE Construction Management, Inc., Columbia, SC and Long Beach,Ca. 8/2001-11/2004 – Assistant Project Engineer - Coordinating with Contracters
•Responsible for electrical installation 2x1 7FA 600mw combined cycle plant
•One combined cycle plant for Capline and one for LADWP.
•Coordinated contracters in conjunction with SCE & G to build two power lines including 230KV and 115 KV to substation, and switchyard
•Worked with SCE&G on acquiring the right-of-way, clearing right-of-way, and installing power line
•Worked with contractor and engineering to redesign cable tray for HRSG saving about one million dollars
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS:
B. S. Evangel U. Springfield, MO
Management Training for Frontline Supervisors,
OSHA 30 HourTraining
Electric Hazard Analysis class covering OSHA standards
NCCR