Post Job Free

Resume

Sign in

Material and Production Planner

Location:
Los Alamitos, CA
Posted:
December 08, 2016

Contact this candidate

Resume:

Scott A. Conley

***** ********* **. *** ********, CA 90720

Contact Number: 818-***-****

E-mail: acxtf6@r.postjobfree.com

Objective: Obtaining a career position where my leadership, team building, analytical mindset, experience, education, loyalty, and accomplishments will contribute to the success the organization and my personal enrichment.

Professional Experience

Production Support Manager

EnvisionTec

November 2015 – Current

Focused on accuracy of inventory

Responsible for the warehouse, shipping and receiving

Release and status of production orders

Establish and maintain the master schedule for level loading of the production floor

Drive continuous improvement within the stockroom, shipping and receiving through Lean principals

Lead daily MRP review meetings with purchasing

Lead weekly sales and forecast meeting with Internal and Outside sales departments

Training of direct reports on multi skill positions

Developed relationships with outside vendors for improved supplier quality

Material and Production Planner

Teledyne Controls

November 2013 – November 2015

Material and Production planner for 5 product lines of electronic assemblies

Reviewed BOM’s for accuracy against released engineering drawings

Engineering Control Board member for Planning and Purchasing department

Responsible for the work order documentation release and tracking

Maintained status for all shortages and working with purchasing to minimize them

Set minimum buys, safety stock levels, min/max level, and usage frequency for integral stock items

Gave input for cost estimation on new projects and programs

Manufacturing Planner/Buyer

Zodiac Aerospace

July 2011 – November 2013

Production planner for 6 different product lines of aircraft galleys and the inflight coffee maker

Reviewed BOM’s for accuracy against released engineering drawings

Change Control Board member for Planning and Purchasing department

Responsible for the work order documentation release and tracking

Maintained status for all shortages and working with purchasing to minimize them

Set minimum buys, safety stock levels, min/max level, and usage frequency for integral stock items

Ensured monthly on time delivery and sales goals were met

Provided key leadership role for the planning and purchasing team

Supplied support for annual inventory audits and weekly cycle counts

Authored work instructions and procedures for the department

Set minimum buys, safety stock levels, min/max level, and usage frequency for integral stock items

Production Scheduler

JM Eagle, Los Angeles, CA

August 2008 – June 2011

Production Scheduler for ten different facilities of PVC pipe production in North America

Worked closely with the sales department to schedule products based on sales forecast and sales history

Creates weekly schedule with emphasis on reducing scrap and maximizing available labor

Conducted quarterly plant inventory audits and overall plant performance

Monitors scrap rate and conversions cost of PVC pipe manufacturing

Initiated continual process improvement to lower scrap rates and conversion costing

Worked with transportation department to ensure shipments met strict cost effective guidelines

Scheduled finished product for just in time shipping to maintain a lower overall inventory

Production Control Scheduler

Tri-Star Electronics, El Segundo, CA

December 2006 – March 2008

Supervised 2 assistants that were responsible for work order creation, second operation scheduling and daily status reporting for each division

Planner/ Scheduler for cables and connector division of in-flight entertainment product lines

Used Oracle 14i MRP modules on a daily basis for order entry and verification

Ensured monthly on time delivery and sales goals were met

Provided input on quarterly sales goals based on forecasted orders and level of quotations from customers

Set inventory levels and developed safety stock to reduce on hand inventory

Met with purchasing supervisor on a weekly basis on vendor issues, and identified items that required expediting

Coordinate work efforts on first article items with marketing, engineering, manufacturing and quality departments

Manufacturing Support Team Member II/ Electro-Mechanical Assembler

ATK Missile Systems Company/ Science & Applied Technology, Woodland Hills, CA

December 2001 – December 2006

Writes planning and technical instructions for the assembly process based on engineering drawings

Coordinate work efforts on custom test stations, PCB assemblies and electro-mechanical assemblies with engineering and quality departments

Ensures seamless transition from manufacturing assembly department to test engineering department and on to final product

Sat on the design review board as the manufacturing repetitive

Supervised 2 mechanical and 3 electrical assemblers

Prescreened resumes, and provided recommendation on future team members

Assembled complex mechanical and electrical assemblies for the AARGM program

Assembled wiring harnesses and PCB assembles in accordance with J- STD-001

Networking Technician

Pinnacle Networking Technology Group, Glendale, CA

January 2001 – December 2001

Responsible for customer hardware and software needs

Installed and maintained various networking hardware

Installed cabling for local area networks

EA-6B Electronics Countermeasures Technician

United States Marine Corps, MCAS Cherry Point, NC

December 1991 to October 2000

Managed and supervised 10 to 12 Marines

Evaluated personnel performance

Counseled personnel on maintaining a high level of performance.

Organized demanding and conflicting schedules.

Inspected other people’s work for safety and mission readiness.

Inspected components of avionics systems for defects and accuracy of assembly.

Tested equipment under simulated and actual operating conditions.

Identified problems through fault isolation.

Applied theory of impedance, resistance, inductance, and AC/DC circuitry

Followed schematics and technical manuals with detailed accuracy.

Maintained over $10 million worth of avionics assets for six months with 100% accuracy

Repaired wiring and connectors by soldering electrical contacts.

Education

Lean/ Six Sigma Green Belt Certification

IPC J-STD-001 Solder Certified

Practical Fiber Handling, Elements of Light Wave Basics

Fundamentals of Total Quality Leadership, Non-Commissioned Officers Course

Fundamentals of Marine Corps Leadership

General Corrosion Control

EA-6B Integrated Electronic Countermeasures System, Avionics Technician

Skills

Excellent communication skills, both verbal and written

Proficient in SAP Business One, Visio, Mac, and PC, AS-400 system, Oracle 14i

Superior skills in organization, multi-tasking with several projects at one time

Creation of engineering drawings into finished products through meticulous planning

Coordinated efforts with inter-departments

Comfortable working with various levels of management

Strong belief in team building and the success of the team.



Contact this candidate