Post Job Free

Resume

Sign in

Telecommunications Project Manager (FTTH, OSP, GSM)

Location:
Riyadh, Riyadh Province, Saudi Arabia
Posted:
August 02, 2017

Contact this candidate

Resume:

Taj E. Abuksawi

Nationality: SUDANESE

Mobile: +966-*********

Email: acxt9u@r.postjobfree.com

Responsibilities

Oct 2011 – Jan 2017 PPC Telecom Co. Riyadh KSA

Project Manager

Establish and manage processes governing the approval, implementation, completion and closes-out of construction activities.

Closely manage contractor's overall performance, provide regular reports on contractors performance.

Perform construction activities utilizing the most cost reducing mechanism.

Ensure compliance with all construction standards and make all the necessary updates to ensure that projects are completed in the most cost effective manner.

Assure that construction codes and safety regulation are being implemented.

Maintain a high level of productivity assuring time frames are met.

Establish and maintain strong relationship with all concerned authorities.

Maintain good invoicing system for all project cost.

Ensure fiber records are accurately updated in a timely manner upon completion of project.

Think strategically to support the growth of wok in the most cost effective manner.

Responsibilities

Responsibilities

Responsibilities

Qualification

Skills

Dec 2010–Jul 2011 Al mozoon Telecom. Co. Riyadh KSA

Site Engineer

Manage and supervise all site construction activities as per construction drawings.

Follow up all outages/incidents that may happen in the area on daily basis; this includes telecom outages; FOC cut incidents; electrical cables cut, water pipes breaking, etc.

Ensure safety standards and quality of workmanship.

Manage the delivery of all materials to the sites in coordination with company's store and / or contracted vendors.

Manage the logistical operations of equipments and machineries to and from the work site.

Maintain and update project management files and documents register.

Checking site consumption according to drawings and specification

Prepare daily/weekly reports for progress and quality of work and forward to Head Office periodically and as required.

Prepare site diary as per project implementation plan.

Attend meetings with subcontractors and expedite progress of work

Monitor the activities of contractor staff to ensure that work schedule is being implemented properly and evaluate the result to meet the acceptable standards.

April 2008 – May 2010 Link Technology Co. Riyadh KSA

Site Engineer

Maintain effective lines of communications between implementation and execution functions.

Develop and Maintain and enforce a safe working environment.

Produce project's periodical Progress Reports as required.

Assist in the development of Project Management Proposals.

Review & Assist in the Development of Contracts.

Attend Progress Meetings with, Contractors & Clients.

Supervise and manage proactively the total development efforts to ensure that the project is designed and constructed in accordance with client brief, design, budget and schedule.

Ensuring that quality standards are adhered to.

Plan & schedule labors, materials and equipments efficiently and within set time frames.

Jun 2004 – Jan 2008 Shanon Cont. Co. Doha – Qatar

Site Engineer

Supervise all construction works from site layout, excavation, concrete pouring, Site development, Tower erection, Site Acceptance Test (PAT/FAT) for Roof top and all Green field sites.

Prepare OILS (Outstanding Items List) for immediate rectification.

Supervision of partners and site workers to speed up the works for RFI date (Ready for Installation) and helping them out on how the project must be undertaken during construction period with respect to safety awareness, quality of works, progress of works, and completion to scope with the set time table.

Pre-Acceptance Test procedures (PAT) and punch listing of pending items to be rectified by subcontractors prior notifying the client for FAT.

Ensure that site development and tower are complete and followed the standard drawings and specifications during Final Acceptance Test (FAT).

Manage subcontractors for speed implementation on RFI (Ready for Inspection) and liaise with client representative for site inspection.

Estimate and review pre-construction drawings and materials to be used in the project.

Plan and coordinate manpower resources, materials, tools and equipments required for the project.

BSc Degree.

Accuracy – Attention to minute details.

Ability to work and relocate anywhere in KSA.

Full Knowledge of MS Office.



Contact this candidate