Profile Statement
Certified project management professional with 17+ years experience in project planning, implementation, and execution. Proven ability to support multiple projects and a consistent track record of on-time and in-budget completion.
Work History
Non-profit 501c3 corporation Director 5/2010-5/2015
Evaluated and recommend annual expenditures for the operations of the group in order to forecast upcoming budgets.
Created guidelines, user manuals, and training materials
Trained and Mentored future Directors.
Updated and filed corporation and tax paperwork as required.
Managed all spreadsheets and interfaced with each director and coordinator regarding distribution of their funds.
Responsible for developing schedules and setting milestone events.
Manage and led teams of stakeholders.
Evaluated and re-established all book keeping methods and procedures.
Royal Ridge HOA Patio Homes I Vice President 1/2010-Present
Project manager: Four-year phased project for the stucco painting of 103 housing units.
Responsible for communications and interactions with all stakeholders. Scheduled all work for the individual home’s work and contractors.
Tracked maintenance work and turned repairs over to the Maintenance Director.
Performed each home’s final walk-through and payment distributions at pre-determined points in the contract. Came in one time and in budget, $146,000.
Fit for a King Assistant: Special Events (Conventions & Weddings) 7/2009- 7/2015
Trained, evaluated, and monitored new staff.
Performed Set-up & Close-down for conventions.
Developed risk assessment and mitigated risk for corporate customers.
Developed sale of business contract.
L H Academy Project Manager & Teacher 8/1998-5/2015
Evaluated progress and compiled necessary documentation annually as required by state and for the college application processes.
Selected, created, and taught curriculum for individual students.
Oversaw and scheduled tutoring for learning challenges.
RGIS (part time) Inventory Auditor 6/1991-4/1993
Assisted Team Lead with set-up & close-out process inventory, which in mall stores included on-site satellite up-link.
Participated with store inventories; Received Top Gun Award for speed and accuracy.
RMF Consulting Engineers Design Engineer for HAVC& Plumbing Systems 3/1988-9/1990
Designed and modified HVAC systems, plumbing systems, fire suppression, underground storage tanks, chemical laboratories, etc. for clients including: Johns Hopkins Hospital, Johns Hopkins University, Baltimore University, Quantico Marine Corps Base, Belt’s Wharf Condominium Renovation, and other private businesses, schools and health spas.
Worked with clients, specifications, and purchase order quantities for selected projects.
Performed site surveys and interfaced with local and governmental agencies to verify city utilities and permitting requirements.
Cabinet Manufacturing Designer/Operations Manager 5/1983- 2/1988
Prepared and reviewed shop production schedules, warranty department and shipping itineraries.
Trained and evaluated new employees in diverse areas of business.
Worked with builders/homeowners to design, estimate, and field measure cabinetry.
Processed invoices, worked with accounts payable/receivable.
Purchased lumber and hardware.
Drafted cabinet details and figured components for assembly. Worked with installation of micro-computer for design work.
Eastman Chemical Co. Electrical & Instrumentation Drafter 9/1980-1/1983
Computed job material requirements and filled out purchase requisitions.
Completed electrical and instrumentation drafting assignments for in-plant processing and products.
Worked with three phase and single phase to provide power to motors, motor control centers, building lighting, and outdoor lighting.
Routed overhead and underground conduit runs, coordinating with civil engineering department, and monitored/inspected job installations.
Ran calculations for lighting and power panel requirements, worked with circuit design, elementary diagrams, and expansion of control panel layouts.
JI Case Drafter for the Special Features Design Group 5/1978-5/1980
Drafted parts, sub-assemblies, and assemblies for front-end loaders, backhoes, and forklifts.
Selected to draw full scale templates for the laser cutting machine for prototype parts.
Certifications/Training
Project Management Professional - PMP
Cisco Certified Network Associate - CCNA
Education
Open Cloud Academy 2016
Rackspace - San Antonio, TX
Associates Degree in Architectural Design 1978
IVY Tech – Terre Haute, IN
Technical Skills
MS Office applications
Intuit QuickBooks accounting software
Knowledge of SDLC