CURRICULAM VITAE
SUBHANKAR DATTA
PRESENT ADDRESS
: West Bengal, India
Contact No : 083********
Skype ID : subhankar.datta2
E-Mail Address : acxsf0@r.postjobfree.com, acxsf0@r.postjobfree.com,
acxsf0@r.postjobfree.com
OBJECTIVE
To utilize my knowledge and skill to the best of my capability in order to benefit for my organization as well as myself.
PROFESSIONAL QUALIFICATION
(10) Secondary pass from West Bengal board of secondary education, India.
(10+2)Higher secondary pass from Delhi board of secondary and higher secondary education, India.
3 years Diploma in Instrumentation Technology form Karnataka board of technical education, India.
3 years Diploma in Electronics & Telecommunication form Karnataka State Open University, India.
PERSONAL
Nationality : Indian
Date of Birth : 27/10/1981
Marital Status : Married
Language Known : English, Hindi.
WORK EXPERINCE
Total Experience: 12 Years
JOB RESPONSIBILITY
Calibration, Erection and Commissioning of all the measuring and indicating instruments.
Calibration of all type of transmitters like Pressure, Differential pressure, Flow (D/P), Temperature, Level (D/P and Displacer), Ultrasonic (Level and Flow), Radar (Level) and GWR Level transmitters. Make- ROSEMOUNT, YOKOGAWA, TAYLOR, ABB, FOXBORO, FISHER, FUJI, MASONEILAN, MAGNETROL.
Calibration of all type of Pressure Gauges, Temperature Gauges, I/P Converter, Pressure Switches, Vibration Switches, Temperature Switches, Level- Switches, Mass Flow Meter etc.
Calibration of Honeywell Enraf 854 ATG Servo Advanced Tank Level Gauge.
Troubleshooting, calibration and functional checking on different control loops for the attend preventive and creative maintenance and new modification jobs.
Involved in the installation of Honeywell Programmable Logic Control system in CDR unit and Loop checking, Logic simulations and Commissioning.
Safety Valve calibration pope test& leak test (pressure up to 250bar), Make- TYCO.
Testing of ON/OFF Valves & Limit switch adjust.
Calibration & stock checking of Control Valves and Smart & electronic Positioner calibration, Make- smart- FISHER DVC-6000/6010/6020/6030/6200, SIEMENS- PS2, DRESSER SVI-I/II, SAMSON, METSO NELES, electronic- MOTOYAMA, MTL, FOXBORO EACKARDT, pneumatic- NUOVO PIGNONE, FISHER-3582, EACKARDT, VALTEK BETA, NELES.
Calibration and functional checking of Motor operated valve. Make- ROTORK, BIFFI.
Installation and Setting the Gap Voltage of Vibration, Axial Displacement & Speed probes and Installation of Bearing Embedded T/Cs, RTDs.
Installation, operation, and maintenance of the Bently Nevada 3500 Series Machinery Monitoring System.
During the Shutdown executed Control Valve Overhaul, Servicing, Erection, Positioner re-calibration & stock checking in Work Shop and fixing back to plant.
Maintenance & Troubleshooting of the production loading arms, loading device, hydraulic system for loading arms movement.
Maintenance & Troubleshooting of the Boiler Flame Scanner (Fireye- UV-45UV5, HONEYWELL C7076, DURAG).
Calibration of Sox-Nox Analyzer IR (ABB), TOC Analyzer (GE), H2 Analyzer TCD (GE), Silica Analyzer(SiO2) BGL, O2 Analyzer – Zirconium base,electrochemical (ppm) ABB, YOKOGAWA, ROSEMOUNT.
Calibration of ph and conductivity meter (YOKOGAWA, POLYMETRON, ENDRESS+HOUSER).
Installation and calibration of the DRAGER gas detection system for H2S, CO, H2, NH3, CH4, LEL (Polytron 7000).
Involved and give complete support for the Gas Turbine full overhaul, repair and Commissioning.
Commissioning and trouble shouting of all instrumentation activities. Like Flow, Pressure, Differential presser, DP type Level transmitters commissioning, Stock checking of Control Valves, etc.
JOBS UNDERTAKEN
Supervision of instrumentation job at site for the new project or modification jobs
Conducting safety tool box meeting before job starting, safe working plan with specific permits for specific activity.
Fabrication & Installation of Cable duct, Instrument stainchion, J.B frame, Instrument canopy of different size as per standard drawing & field situation.
Erection of branch cable tray of different sizes as per field requirement.
Meggering of cables before & after laying as per cable schedule.
Laying of branch cables & multi-core cables according to cable schedule.
Fabrication & Installation of impulse piping (UOP stander & Remote stander).
Installation of Air lines for control valves as calculated branch header air consumption as well as Air supply distribution drawing according to the air supply drawing & hookup.
Installation of different type of Process control Instruments & Erection of control panels.
Glanding, Ferruling & termination of cable with proper dressing.
Hydro-Pneumatic testing, Non Destructive testing (DP) etc.
Installation of SS & CU tubing for Control Valve & Impulse tubing with marinating the required slope.
Preparation of different type of Project Documents.
Preparation of Sequence of activities with respect to man power and equipment.
Preparation of format for each activity as per TEIL & EIL standard.
Job execution with CONTROLING & ASSURING the quality to the client and Consultant as per standard.
Skills:
good knowledge of plant safety rules & regulations.
Good knowledge about Permit to work systems (PWS) and several kinds of permits like Cold work permit, Instrument work permit, hot work permit, Confined Space Entry permits.
Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work.
Capacity to do job independently by following Safety rules & regulations.
Good Experience in the Plant Maintenance and Commissioning.
Sound knowledge and good experienced in the management Plant Instrument Maintenance.
Well-known with the Plant Running, Predictive, Preventive, Breakdown & Corrective Maintenance.
Specialist in Installation & Calibration of different types of the Modern Smart Electronics & Pneumatic instrument.
Skilled in PLC, DCS, ESD Plant Automation Control System.
Effective knowledge of the Lock Out, Tag out process.
Operational knowledge in a Fire and Gas Systems like HC Detectors & UV, H2S Detectors, Smoke Detectors.
Sound skills of all kind of Rotating Equipment’s Maintenance, Gas Turbines, Compressors etc.
Sound knowledge of the Bentley Nevada Vibration Monitor system.
Good Experience in the Control valves, Regulators, MOV & On/Off valves overhauling and calibration.
Good Experience in the Smart Positioner, Ultrasonic & Radar Transmitters, And Different type of Flow, Pressure, Temperature, & Level Transmitters Installation, Calibration, Maintenance & Trouble Shooting.
Specialist in Installation and Setting the Gap Voltage of Vibration, Axial Displacement & Speed probes and Installation of Bearing Embedded T/Cs, RTDs.
Skilled to read Engineering Drawings, Loop Diagrams, P&ID Drawings, Logic Diagram & Hook up drawings also.
Calibrator & Testing Equipment use
HART 475, 375, 275
Beamex multifunction calibrator(MC5/6)
Pressure Calibrator (Druck, Hand Pump)
Loop Calibrator (Druck)
Deadweight tester.
IT’S Skills:
Worked extensively with Ms Office Applications
Worked under Windows Platform (Win 98, Win XP, Win Vista, Win 7,8,10)
Excellent PC skills including MS OFFICE & PHOTOSHOP.
Thorough knowledge of the internet
Employment History:
Name of Organization: Gulf Petrochemical Industrial Company.
On behalf of: Comsip, A Subsidiary of VINCI Energies
Nature of Job: Instrumentation Maintenance of Process Control.
Position: Sr. Instrument Technician
Location: Bahrain
Plant: (1) Methanol plant-ADIP unit (reduce H2S from 800ppm to 10ppm),
Final desulphurization unit, Reformer, MUG Compressor & cooling system, Methanol Synthesis & Distillation unit, PSA unit, Carbon Dioxide Recovery Unit, CO2 Gas compressor, Instrument Air Compressor, N2 Plant, Methanol Storage Tank.
(2) Ammonia plant-Final desulphurization unit, Primary Reformer, Secondary Reformer, Process Air Compressor, CO Conversion Unit, CO2 Removal Unit, Methanation Unit, Synthesis Gas Compressor, Synthesis Loop, Refrigeration Unit, Tail Gas Scrubbing, Ammonia Storage Tank.
(3) Urea plant- CO2 Gas Compressor, Urea Synthesis and High Pressure Recovery Unit, M.P. & L.P. Decomposition Section, Vacuum Concentration Section, Urea Granulation Unit, Bulk Storage Warehouse.
(4) Utilities Plant- Sea Water Intake Unit, Fresh Cooling & Service Water Unit,
Fire Fighting Water Unit, Desalination Unit, Demineralization Unit, Boilers, and Gas turbine.
Period: 02/11/2007 TO till now.
Name of Organization: Hindustan Petroleum Corporation Limited.
On behalf of: A.N. Instruments Private Limited.
Nature of Job: Field Instrumentation project and commissioning activities.
Position: Sr. Instrument Technician
Location: Visakha Refinery, Andhra Pradesh, India.
Plant: V.R.C.F.Project
Period: 06/08/2007 TO 26/10/2007
Name of Organization: Hindustan Petroleum Corporation Limited.
On behalf of: A.N. Instruments Private Limited.
Nature of Job: Field Instrumentation project and commissioning activities.
Position: Sr. Instrument Technician
Location: H.P.C.L Refinery, Mumbai, India.
Plant: G.F.E.C. Project
Period: 20/09/2006 TO 28/07/2007
Name of Organization: Indian Oil Corporation Limited.
On behalf of: A.N. Instruments Private Limited.
Nature of Job: Commissioning and trouble shouting of Instrumentation system.
Position: Sr. Instrument Technician.
Location: Panipat I.O.C.L Refinery, Panipat, Haryana, India.
Plant: D.C.U
Period: 01/08/2006 TO 15/09/2006
Name of Organization: Indian Oil Corporation Limited.
On behalf of: Engineers India Limited.
Nature of Job: Commissioning and trouble shouting of Instrumentation system.
Position: Sr. Instrument Technician.
Location: Panipat I.O.C.L Refinery, Panipat, Haryana, India.
Plant: PX1 & PX2
Period: 01/04/2006 TO 31/07/2006
Name of Organization: Indian Oil Corporation Limited.
On behalf of: A.N. Instruments Private Limited.
Nature of Job: Project, Commissioning and trouble shouting of Instrumentation system.
Position: Instrument Technician.
Location: Panipat I.O.C.L Refinery, Panipat, Haryana, India
Plant: H.C.U
Period: 01/05/2004 TO 31/03/2006
Availability: Earliest start date: Given 4weeks’ notice.
Declaration
I hereby declare that all the statements and the information is true to the best of my knowledge and in case of any information being found invalid my candidature will be cancelled.
PLACE: India Subhankar Datta
Date-20/11/2016