CURRICULUM VITAE
C. MURALI
Age & Date of Birth : years, 15.06.1972
Nationality : Indian
Sex : Male
Passport No. : M 4865195
Date of Issue : 25-02-2005
Date of Expiry : 07.01.2025
Place of Issue : Dubai
E-mail : *****************@*****.***
Educational Qualification
Qualification
University / Institution
Year of Passing
% of Marks
SSLC
HSC
ITI – Fitter (Passed)
B>M>M
K.A.M.P. Meeraniya High School, Kalakad.
Government Higher Secondary School, Kalakad.
A.G. Industrial School Sengottai.
Annamalai University
1987
1989 – 90
Aug. 1990 to July 1992
2003 Not Complete
62.5 %
50 %
75 %
Experience;
Company
Place
Duration
Designation
Employer - I
Ballar Pure Industries (Bilt)
Employer – II
Owens Bilt
Employer – III
Owens Bilt Ltd.,
(Unit Pondicherry)
Employer – IV
Owens Brockway India Ltd., (Unit Pondicherry)
Employer – V
A.C.E. Glass Containers Ltd.,
(Unit Pondicherry
Employer – VI
A.C.E. Glass Containers Ltd.,
Employer –VII
ARC International Middle East LLC, RAK, UAE
India
India
India
India
India
India
UAE
1 year
1 Year
3 years
4 years
2 Years
1 year
11 Years 4Months
Technician Trainee Level – I
Technician Trainee Level – II
Technician (skilled)
Technician
(High Skilled I)
Technician
(High Skilled II)
Supervisor
Team Leader
Known fields
Project planning
Project co-ordination
Computer proficiencies
D.C.A – (Diploma in computer appliance) Certificate course completed in six month
Experience details : 23 years 4 Months
From May 1993 to March 1994 : Ballar Pure Industries (Bilt)
May 1993 to July 1993
Total cost of structures : 250 crores
Details of structures : Manufacture of Glass plant
Work site : Production area
Job Responsibilities : Studying in work, watch the
machine area.
Grade : Technician Trainee - I
August 1993 to December 1993
Structure : I.S. Machine Individual
section machine (Owens Illinoise Technology)
Job Responsibilities : New machine spares collected
in the Stores to Department, Machine to removal spares diesel & Air cleaning spares, Job cord arranged, New spares located on the spare rack.
January 1994 to March 1994
Job Responsibilities : General welding works (Arch)
General gas cutting work, spare self rack welder, fabricate work, Broken machines spares welded & grinded, Broken machine spares brazing & grinding.
From April 1994 to November 1995 : Owens <Bilt>
Total cost of structures : 250 crores
Details of structures : Glass manufactures
Work site : Production Area
Structure : I.S. Machine Individual
section machine Owens illinoise – Technology.
Job Responsibilities : General welding (Arch) & Gas
(cutting) pipe line modifying, Oil line fixed in mechanism, Oil line leakages arrested, Air line leakages arrested, Machine oil level maintained, Machine lubricant oil tank oil filled, Traffs & Traflacters cleaning and cotted (clean mold base), Shear water level maintains and oil mixed (Bio-sial blue), oil & diesel Barrels arranged, Tools “T” handle box spanners Allen keys arranged on job change, Job change equipments arranged on Trallyes (Mold, Bottom, Neckring, Plunger, Thimble, Baffel, Funnel, Blank), Gauges arranged (Neckring gauge, Buffel gauge, Blow head gauge, Tong head gauge).
From Dec. 1995 to Feb. 1998 : Owens Bilt Ltd
Unit Pondicherry.
Total cost of structures : 250 crores
Work site : Production Department
Structure : Machine maintenance
Grade : Technician Trainee – II
December 1995 to March 1995
Job Responsibilities : Services of valve, Air regulator
shock absorber, Filters Bandiwide pipe line fitted.
Valves : Ball valve, Check Valve, Needle
valve, Numatic valve model No 3.JDR 400.KC, Mac valve, roos valve, non return valve (NRV), Pressure reducing valve (PRV), Tapped valve, Ege valve, Vaccum valve.
Air regulators
Low pressure : Model No. R 18 COO RNXD
Max in pressure 3.1 kg/sq. cm
High Pressure : Inlet pressure : 450 PSI–31 bar
Outlet pressure:250 PSI–17.2 bar
Shock Absorber : Model No. SP5695
April 1997 to February 1998 : Conveyer maintenance
Production area conveyer : Link type– 7” width, 8 foot length
Packet conveyer : 5 layers, 90º Angle transferred
Material.
Belt conveyer : 3 layers – 17º Angle transferred
material
Take up conveyer
Lather conveyers : 8 feet width laher conveyer
10 feet width laher conveyer.
Mechanisms serviced ; Takeout mechanism, Blowhead mechanism, Baffel mechanism, invert mechanism, neckring mechanism, MOC linkage over oiling plunger mechanism, Funnel mechanism, Shear mechanism, Laher loader setting & repairing, Gob Distributor alignment, Sweep Out cylinder serviced, Aculeater changes, Timer Belt changes.
From 1.3.1998 to 20.4.2002 : Owens Brock way India Ltd.,
Unit – Pondicherry.
Total cost of structures : 250 crores
Work site : Production Department
Structure : Machine Maintenance
Grade : Skilled – I fitter
March 1998 to March 1999 : Job changes & job settings
Job changes : Spout change, Tub Race & Tub, Plunge (Needle – Ball point needle), Oriface ring changes, Gob tub, Scoop, Troff, Traflacters changes.
Job Settings : Blowhead, Baffel, Take out, Neckring (Invert, Revert), Funnel settings, Laher loaded setting.
April 1999 to April 2002
Job Responsibilities : Shift maintenance fitter
Individual shift handling
From may 2002 to June2004 : ACE Glass Containers Ltd.,
Unit – Pondicherry.
Total Cost of Structures : 450 Crores
Details of Structures : Production Department
Work site : Machine Maintenance
Grade : Skilled – II Fitter.
May 2002 to September 2003
Job Responsibilities : Individual shift handling,
Shift senior skilled fitter.
October 2003 to March 2004 : Project work
All machine repairing and over
oiling, all air pipe lines, oil lines fixed furnace rebuilt up, All mechanism servicing, All conveyer servicing, All laher loader services, All machine feeder works, All section box woks.
April 2004 to June 2004
Job Responsibilities : Individual shift Handling
Shift senior skilled fitter.
11th June2004 to 12th June 2005 : Company promoted to Supervisor
– level –O- Junior Officer – As a member of the Management Staff in the Cold End Department.
From 15.6.2005 to 17.11.2016
Organization : ARC International Middle East LLC, RAK, UAE.
Position : Team Leader
Department : Maintenance and forming
Section : Machine Maintenance and forming
Period : June 2005 to Present
DUTIES AND RESPONSIBILITIES:
Determine schedules, sequences, and assignments for work activities, based on work priority, quantity of equipment and skill of personnel.
Monitor employees' work levels and review work performance.
Monitor tool and part inventories and the condition and maintenance of shops to ensure adequate working conditions.
Compile operational and personnel records, such as time and production records, inventory data, repair and maintenance statistics, and test results.
Examine objects, systems, or facilities, and analyze information to determine needed installations, services, or repairs.
Conduct or arrange for worker training in safety, repair, and maintenance techniques, operational procedures, or equipment use.
Inspect and monitor work areas, examine tools and equipment, and provide employee safety training to prevent, detect, and correct unsafe conditions or violations of procedures and safety rules.
Perform skilled repair and maintenance operations, using equipment such as hand and power tools, hydraulic presses and shears, and welding equipment.
Oversee preparation of work instructions that provide direction to the Maintenance Department for corrective maintenance repairs, performance of preventive maintenance and the implementation of modifications.
Conduct field walk-downs to identify and analyze corrective and preventive maintenance, modification.
Assume and/or perform Maintenance Team Lead duties as required; including vacation/outage coverage.
Machinery Lubricant systems install and serviced
Wear staking Lehar loader unite servicing knowledge.
Spout change Tub Race & Tube
Plunger (Needle – Ball point needle) Orifice ring changes.
Feeder mechanism repairing and installation work. (144 & 81)
Gob distributer repairing work.
Knowledge in reading hydraulic & pneumatics circuits, drawings. And also trouble shootings.
Knowledge in hydraulic and related/ supported applications via Denison, parkers, Rexroth, huge glands products.
0 to 350 bar nitrogen cylinder gas charging works. For hydraulic cylinder pressing presser bust-up purpose.
We are using max purser 140bars.
We are using pressing cylinders size 40,69,80,100,(parker)
Hydraulic pumps parker brands using 0 to 350 bar.
Erection, commissioning, operation cum maintenance of Pumps, gear boxes, compressors, blowers, valves.
Ball valve, Check Valve, Needle valve, pneumatic valve model No 3.JDR 400.KC, Mac valve, roost valve, non return valve (NRV), Pressure reducing valve (PRV), Tapped valve, Ege valve, Vacuum valves.
Monitor employees' work levels and review work performance.
Compile operational and personnel records, such as time and production records, inventory data, repair and maintenance statistics, and test results.
Examine objects, systems, or facilities, and analyze information to determine needed installations, services, or repairs.
Conduct or arrange for worker training in safety, repair, and maintenance techniques, operational procedures, or equipment use.
Inspect and monitor work areas, examine tools and equipment, and provide employee safety training to prevent, detect, and correct unsafe conditions or violations of procedures and safety rules.
Maximizing operating profit through using planned maintenance where it is more effective than alternatives.
Maximizing equipment reliability through using planned maintenance most effectively.
Address for Communication : C. MURALI
Plot No. 26,
Kalimahal Nagar,
IIIrd Cross,
Dharmapuri. 605 009.
Phone : 009*********** (ind)
009*********** (UAE)