Post Job Free

Resume

Sign in

Maintenance Technician

Location:
Ras Al-Khaimah, RK, United Arab Emirates
Salary:
80000 v inr
Posted:
December 04, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

C. MURALI

Age & Date of Birth : years, 15.06.1972

Nationality : Indian

Sex : Male

Passport No. : M 4865195

Date of Issue : 25-02-2005

Date of Expiry : 07.01.2025

Place of Issue : Dubai

E-mail : acxra3@r.postjobfree.com

Educational Qualification

Qualification

University / Institution

Year of Passing

% of Marks

SSLC

HSC

ITI – Fitter (Passed)

B>M>M

K.A.M.P. Meeraniya High School, Kalakad.

Government Higher Secondary School, Kalakad.

A.G. Industrial School Sengottai.

Annamalai University

1987

1989 – 90

Aug. 1990 to July 1992

2003 Not Complete

62.5 %

50 %

75 %

Experience;

Company

Place

Duration

Designation

Employer - I

Ballar Pure Industries (Bilt)

Employer – II

Owens Bilt

Employer – III

Owens Bilt Ltd.,

(Unit Pondicherry)

Employer – IV

Owens Brockway India Ltd., (Unit Pondicherry)

Employer – V

A.C.E. Glass Containers Ltd.,

(Unit Pondicherry

Employer – VI

A.C.E. Glass Containers Ltd.,

Employer –VII

ARC International Middle East LLC, RAK, UAE

India

India

India

India

India

India

UAE

1 year

1 Year

3 years

4 years

2 Years

1 year

11 Years 4Months

Technician Trainee Level – I

Technician Trainee Level – II

Technician (skilled)

Technician

(High Skilled I)

Technician

(High Skilled II)

Supervisor

Team Leader

Known fields

Project planning

Project co-ordination

Computer proficiencies

D.C.A – (Diploma in computer appliance) Certificate course completed in six month

Experience details : 23 years 4 Months

From May 1993 to March 1994 : Ballar Pure Industries (Bilt)

May 1993 to July 1993

Total cost of structures : 250 crores

Details of structures : Manufacture of Glass plant

Work site : Production area

Job Responsibilities : Studying in work, watch the

machine area.

Grade : Technician Trainee - I

August 1993 to December 1993

Structure : I.S. Machine Individual

section machine (Owens Illinoise Technology)

Job Responsibilities : New machine spares collected

in the Stores to Department, Machine to removal spares diesel & Air cleaning spares, Job cord arranged, New spares located on the spare rack.

January 1994 to March 1994

Job Responsibilities : General welding works (Arch)

General gas cutting work, spare self rack welder, fabricate work, Broken machines spares welded & grinded, Broken machine spares brazing & grinding.

From April 1994 to November 1995 : Owens <Bilt>

Total cost of structures : 250 crores

Details of structures : Glass manufactures

Work site : Production Area

Structure : I.S. Machine Individual

section machine Owens illinoise – Technology.

Job Responsibilities : General welding (Arch) & Gas

(cutting) pipe line modifying, Oil line fixed in mechanism, Oil line leakages arrested, Air line leakages arrested, Machine oil level maintained, Machine lubricant oil tank oil filled, Traffs & Traflacters cleaning and cotted (clean mold base), Shear water level maintains and oil mixed (Bio-sial blue), oil & diesel Barrels arranged, Tools “T” handle box spanners Allen keys arranged on job change, Job change equipments arranged on Trallyes (Mold, Bottom, Neckring, Plunger, Thimble, Baffel, Funnel, Blank), Gauges arranged (Neckring gauge, Buffel gauge, Blow head gauge, Tong head gauge).

From Dec. 1995 to Feb. 1998 : Owens Bilt Ltd

Unit Pondicherry.

Total cost of structures : 250 crores

Work site : Production Department

Structure : Machine maintenance

Grade : Technician Trainee – II

December 1995 to March 1995

Job Responsibilities : Services of valve, Air regulator

shock absorber, Filters Bandiwide pipe line fitted.

Valves : Ball valve, Check Valve, Needle

valve, Numatic valve model No 3.JDR 400.KC, Mac valve, roos valve, non return valve (NRV), Pressure reducing valve (PRV), Tapped valve, Ege valve, Vaccum valve.

Air regulators

Low pressure : Model No. R 18 COO RNXD

Max in pressure 3.1 kg/sq. cm

High Pressure : Inlet pressure : 450 PSI–31 bar

Outlet pressure:250 PSI–17.2 bar

Shock Absorber : Model No. SP5695

April 1997 to February 1998 : Conveyer maintenance

Production area conveyer : Link type– 7” width, 8 foot length

Packet conveyer : 5 layers, 90º Angle transferred

Material.

Belt conveyer : 3 layers – 17º Angle transferred

material

Take up conveyer

Lather conveyers : 8 feet width laher conveyer

10 feet width laher conveyer.

Mechanisms serviced ; Takeout mechanism, Blowhead mechanism, Baffel mechanism, invert mechanism, neckring mechanism, MOC linkage over oiling plunger mechanism, Funnel mechanism, Shear mechanism, Laher loader setting & repairing, Gob Distributor alignment, Sweep Out cylinder serviced, Aculeater changes, Timer Belt changes.

From 1.3.1998 to 20.4.2002 : Owens Brock way India Ltd.,

Unit – Pondicherry.

Total cost of structures : 250 crores

Work site : Production Department

Structure : Machine Maintenance

Grade : Skilled – I fitter

March 1998 to March 1999 : Job changes & job settings

Job changes : Spout change, Tub Race & Tub, Plunge (Needle – Ball point needle), Oriface ring changes, Gob tub, Scoop, Troff, Traflacters changes.

Job Settings : Blowhead, Baffel, Take out, Neckring (Invert, Revert), Funnel settings, Laher loaded setting.

April 1999 to April 2002

Job Responsibilities : Shift maintenance fitter

Individual shift handling

From may 2002 to June2004 : ACE Glass Containers Ltd.,

Unit – Pondicherry.

Total Cost of Structures : 450 Crores

Details of Structures : Production Department

Work site : Machine Maintenance

Grade : Skilled – II Fitter.

May 2002 to September 2003

Job Responsibilities : Individual shift handling,

Shift senior skilled fitter.

October 2003 to March 2004 : Project work

All machine repairing and over

oiling, all air pipe lines, oil lines fixed furnace rebuilt up, All mechanism servicing, All conveyer servicing, All laher loader services, All machine feeder works, All section box woks.

April 2004 to June 2004

Job Responsibilities : Individual shift Handling

Shift senior skilled fitter.

11th June2004 to 12th June 2005 : Company promoted to Supervisor

– level –O- Junior Officer – As a member of the Management Staff in the Cold End Department.

From 15.6.2005 to 17.11.2016

Organization : ARC International Middle East LLC, RAK, UAE.

Position : Team Leader

Department : Maintenance and forming

Section : Machine Maintenance and forming

Period : June 2005 to Present

DUTIES AND RESPONSIBILITIES:

Determine schedules, sequences, and assignments for work activities, based on work priority, quantity of equipment and skill of personnel.

Monitor employees' work levels and review work performance.

Monitor tool and part inventories and the condition and maintenance of shops to ensure adequate working conditions.

Compile operational and personnel records, such as time and production records, inventory data, repair and maintenance statistics, and test results.

Examine objects, systems, or facilities, and analyze information to determine needed installations, services, or repairs.

Conduct or arrange for worker training in safety, repair, and maintenance techniques, operational procedures, or equipment use.

Inspect and monitor work areas, examine tools and equipment, and provide employee safety training to prevent, detect, and correct unsafe conditions or violations of procedures and safety rules.

Perform skilled repair and maintenance operations, using equipment such as hand and power tools, hydraulic presses and shears, and welding equipment.

Oversee preparation of work instructions that provide direction to the Maintenance Department for corrective maintenance repairs, performance of preventive maintenance and the implementation of modifications.

Conduct field walk-downs to identify and analyze corrective and preventive maintenance, modification.

Assume and/or perform Maintenance Team Lead duties as required; including vacation/outage coverage.

Machinery Lubricant systems install and serviced

Wear staking Lehar loader unite servicing knowledge.

Spout change Tub Race & Tube

Plunger (Needle – Ball point needle) Orifice ring changes.

Feeder mechanism repairing and installation work. (144 & 81)

Gob distributer repairing work.

Knowledge in reading hydraulic & pneumatics circuits, drawings. And also trouble shootings.

Knowledge in hydraulic and related/ supported applications via Denison, parkers, Rexroth, huge glands products.

0 to 350 bar nitrogen cylinder gas charging works. For hydraulic cylinder pressing presser bust-up purpose.

We are using max purser 140bars.

We are using pressing cylinders size 40,69,80,100,(parker)

Hydraulic pumps parker brands using 0 to 350 bar.

Erection, commissioning, operation cum maintenance of Pumps, gear boxes, compressors, blowers, valves.

Ball valve, Check Valve, Needle valve, pneumatic valve model No 3.JDR 400.KC, Mac valve, roost valve, non return valve (NRV), Pressure reducing valve (PRV), Tapped valve, Ege valve, Vacuum valves.

Monitor employees' work levels and review work performance.

Compile operational and personnel records, such as time and production records, inventory data, repair and maintenance statistics, and test results.

Examine objects, systems, or facilities, and analyze information to determine needed installations, services, or repairs.

Conduct or arrange for worker training in safety, repair, and maintenance techniques, operational procedures, or equipment use.

Inspect and monitor work areas, examine tools and equipment, and provide employee safety training to prevent, detect, and correct unsafe conditions or violations of procedures and safety rules.

Maximizing operating profit through using planned maintenance where it is more effective than alternatives.

Maximizing equipment reliability through using planned maintenance most effectively.

Address for Communication : C. MURALI

Plot No. 26,

Kalimahal Nagar,

IIIrd Cross,

Dharmapuri. 605 009.

Phone : 009*********** (ind)

009*********** (UAE)



Contact this candidate