Post Job Free

Resume

Sign in

Well interventions, completion, reservoir stimulation, HSE, workover

Location:
Houston, TX
Posted:
November 28, 2016

Contact this candidate

Resume:

Sameh Haboubi EP Kolakovic

**** ********** **** *** ****, Houston, TX 77084 713-***-**** acxoeh@r.postjobfree.com Authorized to work in the US for any employer

With 7 years of experience in the upstream oil and gas industry, I have extensive knowledge in production enhancement interventions includes well completion, well integrity, work-over, hydraulic fracturing, slickline, wireline, coiled tubing and well testing. A highly effective Well Engineer, who meets challenges head-on and creates positive change. A proven team-builder, able to develop and lead diverse teams to achieve outstanding results in high-risk, mission- critical environments

Area of expertise:

HSSE Well Integrity Management Well Data Acquisition

Work-over Production Enhancement Database Management

Acid / Proppant Fracturing Contract Management Unmanned platform

Well Completion Rigless Well Interventions Project coordination

AFE & cost estimation Logistics Planning and execution

Well site supervision

HT (up to 195 degC)

Program development

QA/QC

Vertical/deviated/S shape wells

Highly Skilled in Contingency plans

High H2S (up to 40%)

HAZOP, HAZID, SIMPOS

Problem solving and trouble shooting

Employment Experience

WELL ENGINEER ISARENE GROUPEMENT FROM 2014 – TO 2015 Worked with Isarene Groupement (Petroceltic, Sonatrach and ENL) in Algeria as a Well Engineer. Where I gained experience working in onshore wells:

Contributed to the planning of Development Project which consists of Drilling and fracturing 24 new wells (multi stage Frac in vertical and horizontal wells) and re-completing (Work-Over) 6 existing wells.

Established well integrity database for existing wells.

Developed a Well Integrity Management System (WIMS).

Contributed to the completion design selection

Responsible for pre-contract phase of the Slickline, Coiled Tubing, completion equipment, Xmas Tree, well Testing

(requisition, contract strategy, Instruction To Tender, evaluation matrix WELL ENGINEER BRITISH GAS FROM 2009 - TO 2014

Worked as a Well Engineer in British Gas Tunisia. Where I provided technical and operational support to the Well Engineering Team. Highly skilled in planning, execution and final reporting of wells operations in a challenging environment (Development, carbonates, Vertical, Deviated, Offshore, HT up to 195 C, high level of H2S (40%), CO2, unmanned platform).

Well Completion:

Prepared and facilitated CWOP (Complete the well on paper) Page 2

Responsible for issuing completion Program, End of job report

Contributed to the completion design:

- Modelling completion using WellCat software

- Evaluating and selecting appropriate equipment to achieve completion objectives.

- Assessing risk in terms of probability and potential remedies.

Participated in well reviews to assist with diagnosis of well performance problem and recommend programs for improvement or remediation of specific wells.

Responsible for cost tracking and equipment tracking Work-Over:

Extensive work-over experience for production enhancement:

- Tubing change out

- Dual reservoir completion

- Velocity string installation.

Acted as a well Engineering Superintendent for onshore work-over QA/QC

Experienced with 4 1 2” permanent Hydraulic Packer milling

Familiar with work-over on Live Well.

Offshore supervision during Work-over intervention: tubing change out from 4 1 2” to 5 1 2” Hydraulic Fracturing;

Contributed to the tender preparation

Responsible for issuing the operational sequences for the Frac campaign: Acid / Proppant (RCP Resin coated Proppant and LWP Light Weight Proppant)

Developed cost estimation for AFE approval

Participated as a team member on the Frac wells candidate selection: Proppant / Acid Frac

Prepared the Frac, post frac program and the end of job report

Contributed to the Frac treatment design

Responsible for studying potential proppant Flow back

Familiar with EIR, SRO, HAZOP and HAZID studies.

Completed Frac Well on paper

Familiar with Reservoir isolation; sand plug

Familiar with the tree saver

Company representative during Frac operation onboard Frac Boat.

Designed the post Frac proppant clean out using Coiled Tubing and well testing surface package.

Experienced with proppant clean out in s shaped wells.

Ensured lesson learned are captured, recorded and taken into account during future operations.

Completed over 5 wells fracturing operations without screen out and doubled up production rates. Well Interventions:

E-line: milling, perforation, logging

Braided Line: re-perforation, manipulating sleeves, fishing, setting/recovering plugs

Slickline: sampling, caliper, MPLT, camera, flow gradient survey, memory gauges, plugs

Coiled Tubing:

- Catenary scale clean out using 2’’ CT

- N2 lifting

- Pumping acid for scale removal

- Proppant clean out

Well testing: proppant clean out, nitrogen lifting ... Page 3

Fishing: for plugs, mill out extension, packer...

Cost estimation for AFE approval.

Responsible for issuing and tracking call offs

Issued the programs based on BOD from the subsurface team and production technologist.

Lead the pre-job, post-job meeting

Participated on the onshore preparation: QA/QC

Offshore Supervisor experience: night and dayshift.

Acted as Well Services Superintendent during velocity string installation, Frac campaign.

Familiar with the TQF (top quartile framework) and WDP (well delivery process)

Follow up on a daily basis: daily operation report, cost tracker, personnel tracker, equipment tracker

Revision and approval of invoices.

Well Integrity:

Acted as the primary Focal point for the BG Tunisia well integrity (platform and subsea wells, up to 20 years old wells)

Responsible for WIMS for British Gas Tunisia (platform/subsea wells)

Responsible for preparing and issuing the annulus management procedure for the asset

Issued programs for SCE: integrity testing, greasing, repair, change out, upgrade.

Highly competent with IWIT (Intertech well Integrity Toolkit)

Issued the quarterly and yearly integrity report

Deliver the KPI for the asset integrity process for wells.

Management of WI dispensation process

Xmas tree valves, TRSCSSV maximum allowable PBU calculation and revision

Tubing / liner integrity monitoring: caliper survey.

ROV Inspection for the subsea Wells and the conductors splash zone. HSSE:

HSSE focused, zero injuries in all operations is the first priority of project delivery. This is achievable through careful discussions of HSSE aspects with Contractors before, during and after all jobs.

Prepared & hold Toolbox talks, TOFS

Prepared, reviewed and supported the MOC (Management of Change) process

Participated and supported the Safety Observation process

Contributed to the ORA, SIMOPS, HAZID, HAZOP Process

Participated in Safety Tours, Hazard Hunt, Audits QA/QC

Familiar with the onshore QA/QC equipment preparation.

Contractor management: SQM

Prepared and assisted with Quality audits

Conducted inspections for compliance

Assisted with compliance and certification preparation and review. Others:

IAPS: contributed to the Integrated Activity Planning and Scheduling for the asset on behalf of the Well Engineering Team.

Familiar with the Production Process

Logistics: Vessels, Helicopter, Import/Export, Road transport

Attended the production and sub-surface daily platform call. Page 4

Comfortable in collaborating with Geoscience, reservoir, production technologist, C&P, production and services contractor and used to work in combined operational teams. GIS SPECIALIST BRITISH GAS FROM 2008 - TO 2009 Worked with the exploration team in British Gas Tunisia as a GIS specialist:

Modelling of the reservoir characteristics using ESRI set as a primer tool (Arc GIS, ArcMap and CAD, spatial analysis, 3D analyst, ArcInfo)

Generated high quality maps presenting the reservoir characteristics, wells locations...

Evaluation of the Shale Gas potential in Tunisia

Implementation of GIS application for the evaluation of the Shale Gas potential related to the sources rocks with geological ages respectively Eocene, Miocene and Jurassic. Education

Bachelor Degree in Geomatic, Earth and Environment

High school diploma in science

Training:

WellCat & Stress Check Primavera TBosiet

Hydraulic Fracturing course IWIT ISSOW: Permit to work

Annulus Pressure Management training C&P training Safety Leadership

Well Engineering Academy in British Gaz Functional planner training Risk Management system: H2S

Wellview

Additional skills:

COMPUTER SKILLS:

IWIT: intertech Well Integrity Toolkit PDMS

Wellview, Spotfire Geographical Information System (GIS): ArcGis, ArcView, ArcMap, Spatial Analyst.

Maximo Software of graphics: Photoshop, Illustrator, AutoCAD, Autodesk infrastructure.

Primavera Java, HTML, C++, Pascal.

PTW: ISSOW MS Office tools: Word, Excel, Visio, PowerPoint. LANGUAGES:

Arab: fluent, both Written and oral.

French: fluent, both Written and oral.

English: fluent, both written and oral.

Links

https://www.linkedin.com/in/sameh-haboubi-131b065a



Contact this candidate