Post Job Free

Resume

Sign in

Lead Piping Engineer

Location:
Ho Chi Minh City, Ho Chi Minh, Vietnam
Posted:
November 27, 2016

Contact this candidate

Resume:

Date of Birth: **th November, ****.

Cell phone: +84-091*******

Email: acxnv3@r.postjobfree.com

Webpage: http://pipingnotes.wordpress.com

SUMMARY

Piping Engineer / Designer with more than 17-year experience in Piping Design, Engineering, and Construction of Chemical Plants, Petroleum Refineries, Wellhead Platforms, CPP and FPSO; have been worked in Vietnam, Singapore, the Philippines, Japan and the United States.

Range of piping engineering / designing experience includes:

Co-ordinate and control all piping activities.

Conceptual and piping detail design.

Responsible for all piping deliverables such as piping layout, piping general arrangement drawings, isometric drawings.

Interface with all disciplines to ensure clash free model with particular emphasis on operability, accessibility and maintainability.

Generation of pipe specifications.

Stress and flexibility calculation

Able to lead a team to complete all piping deliverables in alignment with project specifications and schedule. Comfortable in managing the design office, handling Multi Nationality Task forces and Work share Procedures.

EXPERIENCE

Oct.2012-Present

Lead Piping Engineer, Technip Vietnam Co. Ltd., Ho Chi Minh City, Vietnam

Project: NSRP-Complex Project Nghi Son Vietnam (Jun.2014- present)

Job scheduling and Piping team supervising.

Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.

Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.

Perform client 3D model design reviews.

Liaise with client and contractor to the end of the project to resolve all technical issues.

Project: Rang Dong Field Enhanced Oil Recovery Project - Detail Design (Jun.2013-Jun. 2014)

Prepare MDR (Master Deliverable Register)

Job scheduling and Piping team supervising.

Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.

Control updating material specifications, valves specification.

Piping site survey

Update piping layout, study and detailed design drawings. Relating to develop isometric drawings, support drawings, support location drawings

Control stress analysis group with critical line list and stress analysis reports and calculation notes

Perform client 3D model design reviews.

Liaise with client and contractor to the end of the project to resolve all technical issues.

Project: Rang Dong Field Enhanced Oil Recovery Project - FEED (Jan.2013-Jun. 2013)

Job scheduling and Piping team supervising.

Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.

Site survey

Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.

Perform client 3D model design reviews.

Liaise with client and contractor to the end of the project to resolve all technical issues.

Project: Gas Processing Plant – Nam Con Son Gas Pipeline -FEED (Oct. 2012-Jan. 2013)

Job scheduling and Piping team supervising.

Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.

Study the options for equipment layouts.

Perform client 3D model design reviews.

Aug.2008-Oct.2012

Lead / Senior Piping Designer, WorleyParsons Petrovietnam Engineering JSC, Ho Chi Minh City, Vietnam

Project: Bien Dong Hai Thach 1 Detail design (Jun.2011- Jul.2012)

HCMC focal point: Job scheduling and Piping team supervising.

Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.

Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.

Perform client 3D model design reviews.

Liaise with client and contractor to the end of the project to resolve all technical issues.

Project: B-193 Process platform Detail Design (Jan.2011- May. 2011)

HCMC focal point: Co-ordinate with Kurla Lumpur office for general information flow.

Prepare Cost Time & Resource estimates.

Supervise and provide technical knowledge to checkers, designers, drafters.

Review and check Piping General Arrangement drawings, Pipe Support Location plans, Pipe Support Details drawings.

Responsible for the timely and quality production of all piping design deliverables.

Project: Bien Dong Moc Tinh 1 Detail design (Aug.2009- Dec.2010)

Senior piping design for Process, Utility, Nitrogen, Water, Fuel Gas and Drain system using PDMS and MDS.

Preparation of equipment layout drawings, piping layout, study and detailed design drawings.

Responsible for developing isometric drawings.

Project: LPG Refrigerated Storage Tanks Project (Aug. 2009-Oct.2009)

Plot Plan arrangement, Conceptual Equipment arrangement.

Piping design around LPG tank and Pipe rack.

Checker, reponsible for quality of all piping deliverables.

Project: Bien Dong 1 FEED Study (Mar.2009- Aug.2009)

Prepare Equipment Layout drawings.

Project: HST Full Field Development and HSD Early Production System Field, Thang Long, Vietnam (Aug. 2008– Mar. 2009)

Prepare Plot Plan drawings

Project: Dung Quat LPG Storage and Truck Loading, Vietnam

Detail piping arrangement around LPG tanks and pipeline from DQ Refinery to LPG storage area.

Prepare Plot plan and Key plan drawings.

Preparation for Standard/Special supports.

Project: Talisman FEED / Design Definition for Block 15-2/01, Vietnam

Prepare Equipment Layout drawings.

Taking care of cost estimation.

Dec. 2007 - Jun. 2008

Technical Coordinator, Kevcomp VN., Ho Chi Minh City, Vietnam

Coordinating between US HQ and Vietnam Branch, scheduling and controlling the job assigned to Vietnam office.

Interview and crecruit suitable candidates for Vietnam office.

Aug. 2007 - Nov. 2007

Technical Coordinator, Kevcomp Inc., Ca, USA

BP Carson, California, US

Job Scheduling

Preparation of Drawings for Inspection and Maintenance.

Coordinator of Vietnam CAD Group and Design and Documentation department in USA.

Jan. 2006 -Feb. 2007

Staff Leader, Kyowa co., Yokohama, Japan

Project: Ripe (X), Japan local Project

Senior Piping designer and Staff Leader,

Job Scheduling. Supporting Scope group and Planning group regarding scope and man-hour.

Preparation of Piping Layout, Piping Information (to Civil, Equipment),

Preparation of Data Sheets (Piping Material and Requisitions).

Piping Design using MDS, checking with SPR.

Isometric drawings and Material Take-Off.

Nov. 2003- Feb. 2005

PDS designer, JGC Phil., Manila, Philippines

Project: Sohar (Sohar Refinary Co.), Nov. 2003 – Feb. 2005

Project: Dolphin (Dolphin Co.), Feb. 2005 – Jan. 2006

PDS designer, Performing 3D modelling, Checking the clashes.

Extracting Plan and Isometric Drawings for Construction and Information Drawings for other Departments.

Checking of Piping Drawings and Isometrics (as per Design Requirements and P&ID), MTO preparation.

Calculation Sheets (for stress analysis).

Jan. 1999 - Nov. 2003

Piping engineer, JGC Singapore, Singapore

Project: PB1 Lamivudine Expansion (GSK-GlaxoSmithKline)

Stress and Flexibility Calculation, using CAESAR II.

Critical line list control/Stress ISO control.

Generation of Pipe Specifications, preparation of requisitions for piping materials.

Apr. 1998 - Jan. 1999

Piping engineer, JGC Vietnam., Hochiminh City, Vietnam

Project: Caltex Pipeline and Storage Tanks Project (Caltex Lubricans Vietnam Ltd.)

Piping Engineer.

Modify arrangement and ISO drawing by CAD.

Material taking off according to the ISO drawings.

EDUCATION

BSc, Automatic System Engineering, HCMC University of Technology, 1993-1998

BA, Industrial Management, HCMC University of Technology, 1999-2002

SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES

Pipe Stress Analysis (CAE, Manila, 2004)

Project Management (AOTS & TOYO, HCM, 2006)

DECLARATION

I hereby guarantee and bear responsibilities for all information mentioned in this resume.



Contact this candidate