Date of Birth: **th November, ****.
Cell phone: +84-091*******
Email: acxnv3@r.postjobfree.com
Webpage: http://pipingnotes.wordpress.com
SUMMARY
Piping Engineer / Designer with more than 17-year experience in Piping Design, Engineering, and Construction of Chemical Plants, Petroleum Refineries, Wellhead Platforms, CPP and FPSO; have been worked in Vietnam, Singapore, the Philippines, Japan and the United States.
Range of piping engineering / designing experience includes:
Co-ordinate and control all piping activities.
Conceptual and piping detail design.
Responsible for all piping deliverables such as piping layout, piping general arrangement drawings, isometric drawings.
Interface with all disciplines to ensure clash free model with particular emphasis on operability, accessibility and maintainability.
Generation of pipe specifications.
Stress and flexibility calculation
Able to lead a team to complete all piping deliverables in alignment with project specifications and schedule. Comfortable in managing the design office, handling Multi Nationality Task forces and Work share Procedures.
EXPERIENCE
Oct.2012-Present
Lead Piping Engineer, Technip Vietnam Co. Ltd., Ho Chi Minh City, Vietnam
Project: NSRP-Complex Project Nghi Son Vietnam (Jun.2014- present)
Job scheduling and Piping team supervising.
Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.
Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.
Perform client 3D model design reviews.
Liaise with client and contractor to the end of the project to resolve all technical issues.
Project: Rang Dong Field Enhanced Oil Recovery Project - Detail Design (Jun.2013-Jun. 2014)
Prepare MDR (Master Deliverable Register)
Job scheduling and Piping team supervising.
Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.
Control updating material specifications, valves specification.
Piping site survey
Update piping layout, study and detailed design drawings. Relating to develop isometric drawings, support drawings, support location drawings
Control stress analysis group with critical line list and stress analysis reports and calculation notes
Perform client 3D model design reviews.
Liaise with client and contractor to the end of the project to resolve all technical issues.
Project: Rang Dong Field Enhanced Oil Recovery Project - FEED (Jan.2013-Jun. 2013)
Job scheduling and Piping team supervising.
Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.
Site survey
Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.
Perform client 3D model design reviews.
Liaise with client and contractor to the end of the project to resolve all technical issues.
Project: Gas Processing Plant – Nam Con Son Gas Pipeline -FEED (Oct. 2012-Jan. 2013)
Job scheduling and Piping team supervising.
Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.
Study the options for equipment layouts.
Perform client 3D model design reviews.
Aug.2008-Oct.2012
Lead / Senior Piping Designer, WorleyParsons Petrovietnam Engineering JSC, Ho Chi Minh City, Vietnam
Project: Bien Dong Hai Thach 1 Detail design (Jun.2011- Jul.2012)
HCMC focal point: Job scheduling and Piping team supervising.
Organize all aspects of the workload of a team of piping discipline designers, draftsmans and checker, within the parameters of a project schedule.
Preparation of piping layout, study and detailed design drawings. Relating to develop isometric drawings.
Perform client 3D model design reviews.
Liaise with client and contractor to the end of the project to resolve all technical issues.
Project: B-193 Process platform Detail Design (Jan.2011- May. 2011)
HCMC focal point: Co-ordinate with Kurla Lumpur office for general information flow.
Prepare Cost Time & Resource estimates.
Supervise and provide technical knowledge to checkers, designers, drafters.
Review and check Piping General Arrangement drawings, Pipe Support Location plans, Pipe Support Details drawings.
Responsible for the timely and quality production of all piping design deliverables.
Project: Bien Dong Moc Tinh 1 Detail design (Aug.2009- Dec.2010)
Senior piping design for Process, Utility, Nitrogen, Water, Fuel Gas and Drain system using PDMS and MDS.
Preparation of equipment layout drawings, piping layout, study and detailed design drawings.
Responsible for developing isometric drawings.
Project: LPG Refrigerated Storage Tanks Project (Aug. 2009-Oct.2009)
Plot Plan arrangement, Conceptual Equipment arrangement.
Piping design around LPG tank and Pipe rack.
Checker, reponsible for quality of all piping deliverables.
Project: Bien Dong 1 FEED Study (Mar.2009- Aug.2009)
Prepare Equipment Layout drawings.
Project: HST Full Field Development and HSD Early Production System Field, Thang Long, Vietnam (Aug. 2008– Mar. 2009)
Prepare Plot Plan drawings
Project: Dung Quat LPG Storage and Truck Loading, Vietnam
Detail piping arrangement around LPG tanks and pipeline from DQ Refinery to LPG storage area.
Prepare Plot plan and Key plan drawings.
Preparation for Standard/Special supports.
Project: Talisman FEED / Design Definition for Block 15-2/01, Vietnam
Prepare Equipment Layout drawings.
Taking care of cost estimation.
Dec. 2007 - Jun. 2008
Technical Coordinator, Kevcomp VN., Ho Chi Minh City, Vietnam
Coordinating between US HQ and Vietnam Branch, scheduling and controlling the job assigned to Vietnam office.
Interview and crecruit suitable candidates for Vietnam office.
Aug. 2007 - Nov. 2007
Technical Coordinator, Kevcomp Inc., Ca, USA
BP Carson, California, US
Job Scheduling
Preparation of Drawings for Inspection and Maintenance.
Coordinator of Vietnam CAD Group and Design and Documentation department in USA.
Jan. 2006 -Feb. 2007
Staff Leader, Kyowa co., Yokohama, Japan
Project: Ripe (X), Japan local Project
Senior Piping designer and Staff Leader,
Job Scheduling. Supporting Scope group and Planning group regarding scope and man-hour.
Preparation of Piping Layout, Piping Information (to Civil, Equipment),
Preparation of Data Sheets (Piping Material and Requisitions).
Piping Design using MDS, checking with SPR.
Isometric drawings and Material Take-Off.
Nov. 2003- Feb. 2005
PDS designer, JGC Phil., Manila, Philippines
Project: Sohar (Sohar Refinary Co.), Nov. 2003 – Feb. 2005
Project: Dolphin (Dolphin Co.), Feb. 2005 – Jan. 2006
PDS designer, Performing 3D modelling, Checking the clashes.
Extracting Plan and Isometric Drawings for Construction and Information Drawings for other Departments.
Checking of Piping Drawings and Isometrics (as per Design Requirements and P&ID), MTO preparation.
Calculation Sheets (for stress analysis).
Jan. 1999 - Nov. 2003
Piping engineer, JGC Singapore, Singapore
Project: PB1 Lamivudine Expansion (GSK-GlaxoSmithKline)
Stress and Flexibility Calculation, using CAESAR II.
Critical line list control/Stress ISO control.
Generation of Pipe Specifications, preparation of requisitions for piping materials.
Apr. 1998 - Jan. 1999
Piping engineer, JGC Vietnam., Hochiminh City, Vietnam
Project: Caltex Pipeline and Storage Tanks Project (Caltex Lubricans Vietnam Ltd.)
Piping Engineer.
Modify arrangement and ISO drawing by CAD.
Material taking off according to the ISO drawings.
EDUCATION
BSc, Automatic System Engineering, HCMC University of Technology, 1993-1998
BA, Industrial Management, HCMC University of Technology, 1999-2002
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Pipe Stress Analysis (CAE, Manila, 2004)
Project Management (AOTS & TOYO, HCM, 2006)
DECLARATION
I hereby guarantee and bear responsibilities for all information mentioned in this resume.