WORKING EXPERIENCE & DESIGNATION:

WITH 10+ YEARS (FROM 2005 TO TILL DATE OF GULF EXPERIENCE IN ELECTRICAL SUBSTATION, OHL, POWER PLANT, EPC OIL & GAS, HIGH RAISED BUILDINGS & OTHER INFRASTRUCTUERS MEP PROJECTS.,

SENIOR ELECTRICAL PROJECT LEAD EXECUTION ENGINEER.

ELECTRICAL PROJECT DESIGN & COMMISSIONING ENGINEER.

ELECTRICAL ESTIMATION & QUANTITY SURVEYOR ENGINEER (COST & SUB-CONTRACTOR’S ANALYSIS).

LIST OF PROJECTS HANDLED IN EXECUTIONS:

11KV / 33KV / 132KV & 220KV PRIMARY & SECONDARY ELECTRICAL SUB STATION PROJECTS.

EPCC OIL & GAS PROJECTS (ONSHORE / OFFSHORE).

THERMAL POWER PLANT/ STP & RO DESALINATION PLANT.

COMMERCIAL & REDISENTIAL HIGH RISE BUILDING PROJECTS.

TELE COMMUNICATION / SCADA BUILDING PROJECTS.

OHL TRANSMISSION LINE PROJECTS.

SPECIALIZED IN THE PRE COMMISSION/COMMISSIONING, HOOKUP, SHUTDOWN, TIE-IN ETC.,

NAME OF THE ORGANISATIONS:

1.NAME OF COMPANY: AL MANARAH ENGINEERING CONSULTANCY

NAME OF POST: SENIOR DESIGN ENGINEER MEP PROJECTS/PROJECT MANAGEMENT.

MINISTRY OF TRANSPORTATION/MINISTRY OF HOUSING/DIWAN ROYAL COURT/ROP MEDICAL HOSPITAL/MINISTRY OF DEFENCE: JUNE 2015 TO TILL’’

ADMINISTRATION BUILDING (CONTRACT NO. J0711) - MOH

300 VILLAS (CONTRACT NO. J0713) - MOT

ROYAL OMAN POLICE MEDICAL HOSPITAL (CONTRACT NO. J0714) – ROP

MILLION DATES PALM PLANTATION(PUMPING STATION, RESERVOIR & COMMERCIAL BUILDINGS) – DIWAN

AYDEM NEW MILITARY CAMP BUILDINGS - MOD

HEADQUATERS BUILDING OF CIVIL SERVICES EMPLOYEES PENSION FUND-CIVIL SERVICE EMPLOYEES PENSION FUND

2.NAME OF COMPANY: ALISCO TRADING & CONTRACTING LLC IN OMAN

NAME OF POST: SENIOR ELECTRICAL PROJECT LEADS ENGINEERING.

ROYAL OMAN POLICE/PDO & OTHER GOVERNMENT PROJECTS: OCT‘2013 TO MAY‘2015’’

ALKHOUD POLICE STATION BUILDING PROJECT (CONTRACT NO J0338/J0355) – ROP OMAN.

AMIRAT VEHICLE INSPECTION COMPLEX PROJECT (CONTRACT NO J0324) - ROP OMAN.

CONSTRUCTION OF NEW 33 KV/11 KV SUBSTATION - DIWAN

JALAAN POLICE STATION BUILDING PROJECT(CONTRACT NO J0412/J0413) – ROP OMAN

QURIYAT 40 KM ROAD LIGHT INSTALLATION PROJECT(DIWAN ROYAL COURT) – DIWAN

FAHOOD POLICE VILLA AND SOCCER PITCH PROJECT (CONTRACT NO J406) – ROP OMAN

REGIONAL DETENTION CENTRE PROJECT (CONTRACT NO J502) – ROP OMAN

MUSANNA POLICE STATION BUILDING PROJECT (CONTRACT NO J613) – ROP OMAN

EXTENSION OF SULTAN QABOSS BARKA PALACE BUILDING PROJECT- MINISTRY OF EXTERNAL AFFAIRS.

AL GHUBRAH POWER & DESALINATION PLANT UNIT 4 – GPDCO OMAN.

EPC FOR ABU TUBUL GAS PLANT DEVELOPMENT (ON & OFF PLOT) – STS-PDO.

EXTENTION OF SOHAR REFINERY BUILDING PROJECTS(SAAP) – SOHAR ALUMINIUM PLANT

INTERNAL UPGRADING PLANT ELECTRICAL LINES(ORPIC) – OMAN REFINERY & PETRO CHEMICAL INDUSTRIES COMPANY

EXTENTION OF CROWN PLAZA HOTEL PROJECT – MINISTRY OF TOURISM

3.NAME OF COMPANY: ILF BERATENDE INGENIEURE A.G IN SAUDI ARABIA

NAME OF POST: ELECTRICAL PROJECT & DESIGN ENGINEERING

SAUDI ARAMCO PROJECTS: AUG‘2010 TO OCT‘2013

SHUQAIQ PH2 POWER GENERATION & WATER DESALINATION PLANT (SQWTS-2) – ACWA/SWCC SAUDI GOVERNMENT PROJECT.

GIS SUBSTATION 8165- 132KV/13.8KV (SQWTS-2) – ACWA/SWCC SAUDI GOVERNMENT PROJECT.

SHOIBA TERMINAL PH3 EXTENTION PROJECT – SALINE WATER CONVERSION CORPORATION

UPGRADATION OF UPS SYSTEM IN WATER TREATMENT PLANT – RABIGH ARABIAN WATER ELECTRICITY COMPANY

132KV OVER HEAD TRANSMISSION LINE ERECTION IN NORTH OF JIZAN(140 KM)– SQWEC/SAUDI GOVERNMENT PROJECT

CONSTRUCTION OF NEW GRID STATION IN QASSIM – SAUDI ELECTRICITY COMPANY

SUBSTATION 33KV/11KV – ROYAL COMMISSION RESISDENT POWER SUPPLY PROJECT

UPGRADATION OF 350 KVA GENSET TO 630 KVA GENSET WITH ATS – YANBU CHEMICAL PLANT

5KVA AND 3 KVA UPS SYSTEM IN RESERVOIR STATIONS – SAUDI MUNICIPALITY PROJECT

NEW STAFF ACCOMMODATION HIGH RAISE RESIDENTIAL PROJECTS – SAUDI ARAMCO

INTERNAL HOSPITAL PROJECT – RIYADH - MINISTRY OF HEALTH

4.NAME OF COMPANY: GEDAC ELECTRIC COMPANY IN SAUDI ARABIA

NAME OF POST: ELECTRICAL PROJECT ENGINEERING

SAUDI ARAMCO PROJECTS: MAR‘2009 TO JULY‘2010

POWER PLANT (PP10) – SAUDI ELECTRICITY COMPANY.

QASSIM POWER PLANT (PP8) – SAUDI ELECTRICITY COMPANY.

HVAC PLANT EXTENTION PROJECT – SEC/BEMCO.

REFINARY UPGRADATION PROJECT – KBR GROUP/GES

35 RAISED STORY BUILDING PROJECT – AR-RABIA CONSTRUCTION COMPANY

BUILDING AUTOMATION SYSTEM PROJECT – KHATIB ALAMI

HYDRAULIC WORKSHOP INDUSTRIAL PROJECT – SABIC GROUP

EXTENTION OF JUBAIL REFINERY PROJECT – SAUDI ARAMCO MOBIL REFINERY COMPANY

5.NAME OF COMPANY: TRANSTEC PV LTD IN INDIA

NAME OF POST: ELECTRICAL SITE ENGINEERING

INDIA ELECTRICITY BOARD PROJECTS: NOV‘2005 TO FEB‘2009

ADANI (SPIE) – SPIE OIL & GAS DEVELOPMENT SERVICES.

INDUSTRIAL AUTOMATION BUILDING PROJECT (GODREJ) – GODREJ GROUPS.

25 VILLAS MEP PROJECT – HORIZON INFRA PROJECTS LTD

CONSTRUCTION OF NEW 4 NO. SUBSTATION 33KV/11KV – ETI ASCON.

HV AND EHV TRANSMISSION LINES SINGLE AND DOUBLE CIRCUIT UPTO 400 KV AC ON TOTAL TURNKEY BASIS – ANGELIQUE INTERNATIONAL LTD

11KV TRANSMISSION LINE FROM S/S TO 11KV - 415V/380V TRANSFORMER –BHARAT HEAVY ELECTRICAL

WARE HOUSE PROJECT – TECHNIP

HVAC RETROFITTING PROJECT - ELECON ENGINEERING COMPANY

RESPONSIBILITIES & DUTIES:

ELECTRICAL PROJECT LEAD ENGINEER:

PRELIMINARY STUDY OF THE ENQUIRY AND THE BASIC SCOPE OF SUPPLY & CONCEPT OF SYSTEM.

SITE INSPECTION OF ALL ELECTRICAL SERVICES AND MATERIAL FROM INSTALLATIONS.

STANDARDIZE THE LAYOUTS, TESTING, COMMISSIONING AND FINALLY HAND OVER TO CLIENT.

EQUIPMENT SELECTION FOR ALL ELECTRICAL SYSTEM INSTALLATION.

REVIEWING ALL ELECTRICAL DRAWINGS.

REVIEWING ALL MATERIAL SUBMITTAL FOR ELECTRICAL SYSTEM.

FAMILIAR WITH ALL MS-OFFICE 2010 PACKAGES UNDER WINDOWS ENVIRONMENT.

KNOWLEDGE IN AUTO CAD 2009.

INSPECTION OF ALL ELECTRICAL (HIGH VOLTAGE LINES, BREAKERS, PANELS, FIRE PROTECTION) SYSTEMS.

TESTING & COMMISSIONING OF ALL ELECTRICAL SYSTEMS AND EQUIPMENTS.

DEVELOP ELECTRICAL DISTRIBUTION SYSTEMS FOR INDUSTRIAL APPLICATIONS USING RECOGNIZED INDUSTRY STANDARDS AND SPECIFICATIONS.

OVERSEE THE ENGINEERING, DESIGN AND INSTALLATION OF ELECTRICAL POWER SUBSTATIONS, TRANSMISSION AND DISTRIBUTION LINES UP TO 230KV.

PERFORM SYSTEM CALCULATIONS AND STUDIES FOR ELECTRICAL POWER SYSTEMS –SHORT CIRCUIT ANALYSIS, PROTECTIVE DEVICE COORDINATION, LOAD FLOW, VOLTAGE DROP, MOTOR STARTING AND ARC FLASH EVALUATION UTILIZING ETAP ELECTRICAL MODELING SOFTWARE.

INVOLVED IN PROJECTS FROM THE CONCEPT AND DETAIL OF THE DESIGN THROUGH TO IMPLEMENTATION, TESTING AND HANDOVER.

DEVELOP TECHNICAL BID TABULATION TO SUPPORT THE SELECTION OF MAJOR ELECTRICAL EQUIPMENT AND COORDINATE PROCUREMENT WITH CLIENT SUPPLY CHAIN TEAM.

RESPONSIBLE FOR REVIEWING THE TECHNICAL ACCURACY AND APPROVAL OF DRAWINGS, CALCULATIONS, STUDIES, SPECIFICATION, AND OTHER TECHNICAL DOCUMENTS.

OVERSEE ENGINEERING AND DESIGN EFFORTS IN OIL AND GAS FACILITIES TO ASSURE PROJECTS ARE COMPLETED SATISFACTORILY, ON TIME, SAFELY AND WITHIN BUDGET.

FAMILIAR WITH ELECTRICAL INSTALLATION METHODS IN HAZARDOUS LOCATIONS.

PROVIDE TECHNICAL EXPERTISE TO PLANT PERSONNEL ON OPTIONS, TROUBLESHOOTING, ROOT CAUSE FAILURE ANALYSIS, REPAIRS, AND EVALUATION OF EQUIPMENT.

SUPPORT DESIGN, SIZING AND SELECTION OF GENERATION SYSTEMS.

ASSIST IN THE DEVELOPMENT OF PROJECT SCHEDULES AND MANPOWER REQUIREMENTS.

INSPECT/REVIEW EXISTING PLANT ELECTRICAL SYSTEMS TO ENSURE THEY ARE SAFE.

REVIEW EXISTING PLANT OPERATIONS TO FIND OPPORTUNITIES TO CONSERVE ELECTRICAL ENERGY USAGE.

ELECTRICAL PROJECT DESIGN ENGINEER:

MASTER SCHEDULE PREPARATION & DAILY BASICS MONITORING THROUGH PROJECT SITE CONDITIONS.

SYSTEM DESIGN AND DRAWINGS REVIEW FOR ELECTRICAL SYSTEM.

REVIEWING OF WORK SCHEDULES, MATERIAL SUBMITTALS, AND QUALITY ASSURANCE PLAN.

RECHECK THE DESIGN AND CONTRACT DRAWINGS.

ASSIT WITH ENGINEERING CHANGE ON WORKS AND SUPPORTING QUALITY TERM SUSTAINABLE RESOLVES

ENSURE DESIGNS ARE COMPLIANT WITH RELEVANT TECHNICAL, SAFETY AND ENVIRONMENTAL STANDARDS

EQUIPMENT SELECTION FOR ELECTRICAL SYSTEM.

REVIEWING TESTING & COMMISSIONING OF COMPLETE ELECTRICAL SYSTEM METHOD STATEMENTS AND EXECUTION.

KNOWLEDGE OF ELECTRICAL ENGINEERING DESIGN FUNDAMENTALS, ALONG WITH EXPERIENCE IN ELECTRICAL DESIGN INCLUDING AC AND DC POWER SYSTEMS AND BUILDING AUTOMATION SYSTEMS AND EMERGENCY POWER GENERATION.

WORKING KNOWLEDGE OF AUTOMATION CONTROLS INCLUDING FUNDAMENTAL UNDERSTANDING OF MECHANICAL SYSTEMS INCLUDING ELECTRICAL COOLING REQUIREMENTS FOR HEAT LOADS WITH DATA CENTERS.

WORKING KNOWLEDGE OF NEC & ISA STANDARDS AND SYMBOLOGY, WITH KNOWLEDGE OF IEEE & CE STANDARDS;.

DEVELOPMENT AND IMPLEMENTATION OF PROJECT QUALITY PLAN

INVESTIGATES STATEMENTS OR SITE DATAIN DISTRICT REPORTS WHICH APPEAR UNECONOMICAL OR INCONSISTENT WITH POLICES

IMPROVED THE SAFTY ENVIRONMENT IN THE ENTIRE PROJECT

EFFECTIVE COMMUNICATOR & NEGOTIATOR WITH STRING ANALYTICAL, PROBLEM SOLVING AND ORGANIZATIONAL ABILITIES

ANALYZE PRODUCT OR EQUIPMENT SPECIFICATIONS AND PERFORMANCE REQUIREMENTS TO DEVELOP COST EFFECTIVE, EFFICIENT DESIGNS PRODUCIBLE BY EXISTING MANUFACTURING AND PROCESSING FACILITIES AND METHODS.

PREPARE OR MANAGE PREPARATION OF DOCUMENTS, INCLUDING ONE-LINE DIAGRAMS, COMMUNICATION DIAGRAMS, ELECTRICAL SCHEMATICS, PANEL LAYOUTS, AND INSTALLATION DRAWINGS AND WHEN APPLICABLE PROVIDE PLC SOFTWARE/SCADA/HMI SOFTWARE PER THE FUNCTIONAL DESCRIPTION.

SUBMIT, MONITOR AND REVIEW STATUS OF DESIGN SUBMITTAL PACKAGES TO CUSTOMERS.

PROJECT INSTALLATION AND COMMISSIONING ACTIVITIES:

PREPARE INFORMATION PACKAGE FOR FIELD PERSONNEL PER PROJECT SCHEDULE

CREATE ELECTRICAL INSTALLATION PACKAGES AND START UP INSTRUCTIONS.

MONITOR INSTALLATION SCHEDULE VIA FIELD SUPERVISOR. MAINTAIN PROJECT SCHEDULE AND MANAGE PROJECT DELIVERABLES TO MEET OR EXCEED CUSTOMER EXPECTATIONS. ASSIST WITH FIELD INSTALLATION.

MANAGE AND PARTICIPATE IN COMMISSIONING ACTIVITIES AS REQUIRED.

COMMISSION PLC/SCADA/HMI SOFTWARE TO MEET OR EXCEED CUSTOMER EXPECTATIONS.

ELECTRICAL ESTIMATION & QUANTITY SURVEYOR:

TIMELY PREPARATION AND SUBMISSION OF MONTHLY RUNNING BILL. PRICE ADJUSTMENT BILL AS PER GCC, ITS CERTIFICATE WITH CLIENT.

CHECKING AND VERIFYING MEASUREMENT BOOK (BILL FOR WORK DONE).

CERTIFICATION OF SUB CONTRACTOR INVOICES AND ERP-SOFTWARE FOR RECONCILIATION PURPOSE.

RATE ANALYSIS OF EXTRA ITEM/DEVIATED ITEM, ITS FINALIZATION WITH CLIENT. CLIENT BILLING, SUBCONTRACTORS BILLING.

PREPARATION OF WORK IN PROGRESS (WIP) & SEND REPORT TO THE H.O.EVERY MONTH.

RUNNING BILLS PREPARATION & CERTIFICATION TO CLIENT.

REVIEWING OF RECONCILIATION STATEMENTS OF CLIENT SUPPLIED MATERIALS.

EMPHASIZING CLIENT FOR PAYMENT FOLLOW UPS.

UPCOMING OF FORECASTING PROJECTION ON RUNNING BILL.

REVIEWING CASH FLOW TO OUR PROJECT MANAGEMENT & FINANCIALLY MONITORING.

REVIEWING PROJECT PLANNING REPORTS:

REPORTED TO PROJECT OPERATIONAL HEAD (HEAD OFFICES):

PREPARATION OF PROJECT PLANNING & PROJECT BUDGET IN CONSULTATION WITH HO TEAM.

IMPLEMENTATION OF PROJECT PLAN & ENSURING LOGICAL SEQUENCING OF PLAN BASED ON RESOURCES.

PLAN RESOURCES, ARRANGEMENT & ALLOCATION OF RESOURCES AS PER THE PROJECT PLAN.

MONITOR CONSTRUCTION SCHEDULES & HIGHLIGHT ANTICIPATED DELAYS/DEVIANCIES IN ADVANCE.

PREPARE METHOD STATEMENT & SUBMIT TO CLIENTS/CONSULTANTS FOR APPROVAL.

CONDUCT PROGRESS REVIEW MEETINGS AT FIXED INTERVALS.

WORK OUT THE RESOURCE REQUIREMENT (MAN POWER, EQUIPMENT, MATERIAL ETC. SO AS TO FULFIL THE CONSTRUCTION SCHEDULE PREPARED).

ANALYZE GAPS BETWEEN THE PLANNED V/S ACTUAL AND HIGHLIGHT THE AREAS NEEDING ATTENTION FOR ACTION OF THE PROJECT TEAM.

REVIEWING THE LOGICAL LINKS & WITH EPC CONCEPTS.

PROVIDING NEW IDEAS/ METHODOLOGY AND CREATIVITY.

REVIEWING BRINGING OUT THE RESOURCES REQUIREMENT / CRITICAL ACTIVITY / SPECIAL AGENCY REQUIREMENT WITH NECESSARY LEAD TIME.

REVIEWING THE PROGRESS & JOB FLASH REPORT.

PROGRAMMING & UPDATING OF CONSTRUCTION SCHEDULE.

EFFECTIVENESS IN WEEKLY REVIEW & DAILY PROGRAMME.

CRITICAL PATH & RESOURCE ANALYSIS.

DAILY REVIEWS & ACTIVITY FOR PROJECT PLANNING:

ENSURING THAT CONSTRUCTION PROJECTS ARE COMPLETED WITHIN SET DEADLINES, ON BUDGET, AND IN LINE WITH ALL THE RELEVANT SAFETY STANDARDS AND REGULATIONS.

THE PLANNING AND EXECUTION OF ONSHORE AND OFFSHORE WORK ACTIVITIES OR PROJECTS IS AN ESSENTIAL PART OF ENSURING THAT CONSTRUCTION AND PRODUCTION SCHEDULES ARE MET AND THAT WORK ACTIVITY ARE PLANNED IN A COST-EFFECTIVE AND EFFICIENT WAY.

COLLECTS DATA NECESSARY TO COMPILE LONG AND SHORT TERM ACTIVITY PLANS.

PRODUCES PLANS USING SPECIALIST PLANNING SOFTWARE/SYSTEMS.

IDENTIFIES/HIGHLIGHTS PLANNING CLASHES OR INTERFACES AND WORKS WITH THE TEAM TO RESOLVE ISSUES.

ENSURES PLANS ARE UPDATED/ ISSUED ON A REGULAR BASIS.

ANALYSES AND SUMMARISES ACTIVITIES AND PRODUCES REPORTS ON PROGRESS.

ATTENDS PLANNING, ENGINEERING AND OPERATIONS MEETINGS.

A REVIEW OUTSTANDING JOBS/WORK SCOPES.

LIAISES WITH ENGINEERING/OPERATIONS PERSONNEL TO ENSURE AVAILABILITY OF MATERIALS AND VENDORS TO MEET PLAN DATES.

PREPARING REPORTS AND ENSURING THE ACCURACY OF PLANNING INFORMATION, LEADING AND COORDINATING REGULAR MEETINGS AND ACHIEVING TARGETED OUTCOMES AS PER THE INDUSTRY BUSINESS PLAN.

EDUCATIONAL QUALIFICATIONS:

COURSES

INSTITUTIONAL

BOARD/

UNIVERSITY

YEAR OF PASSING

MARKS IN %

GRADE

DIPLOMA IN ELECTICAL ENGINEERING

DOTE POLYTECHNIC COLLEGE, TAMILNADU

TECHNICAL BOARD

2002

90%

A

BACHELOR OF ELECTRICAL C ENGINEERING

ANNA UNIVERSITY IN THIRUNELVELI.

ANNA UNIVERSITY

2005

85%

A

SOFTWARE PROFICIENCY:

OPERATING SYSTEM : MS WINDOWS 8, ANDROID JB 4.3

PROGRAMMING LANGUAGE : JAVA, J2EE, C

WEB TECHNOLOGY : SERVLET, JSP, JAVA SCRIPT, HTML

DATA BASE : MS ACCESS, SQL, ORACLE

TOOLS & UTILITIES : NET BEAN 5.0, TOAD 9.0, ECLIPSE

DESIGN SOFTWARE : CAD 2009 & 2014, PROCERA PLUS GE.

PERSONAL PROFILE:

NAME : SAHUL HAMEED. K

PASSPORT NO : K7418656

DATE OF BIRTH/AGE : 03/05/1981 & 33*

GENDER/NATIONALITY : MALE/ INDIAN.

MARITAL STATUS : MARRIED / 1KID.

PERMANENT

CONTACT/ ADDRESS : CHENNAI – TAMILNADU*

NOTICE PERIOD : WITHIN 1 WEEKS.

REASON FOR CHANGES : CARRIER STEPPING GROWTH.

DRIVING LICENSE : (SAUDI ARABIA & OMAN) AVAILABLE

REFERENCES : AS YOUR REQUESTS ***

LANGUAGES KNOWN:

TO SPEAK : ENGLISH / HINDI / MALAYALAM/TAMIL & ARABIC.

TO WRITE : ENGLISH.

TO READ : ENGLISH.

DECLARATION:

I HEREBY DECLARE THAT ALL THE ABOVE MENTIONED DETAILS ARE TRUE TO BEST OF MY KNOWLEDGE. IT’S A TIME TO STEPPING MY SPIRIT OF EFFICIENCY.

PLACE: OMAN. SAHUL HAMEED. K

DATE:



Contact this candidate