Post Job Free

Resume

Sign in

Manager Operator

Location:
Bowling Green, KY
Salary:
Negotiable
Posted:
November 25, 2016

Contact this candidate

Resume:

Timothy Ellis Edge

***** *** *********** ****

Whitesville, KY 42378

Cell: 270-***-****

E-mail: acxnae@r.postjobfree.com

Objectives

To obtain a steady full time position in a safe, team oriented atmosphere, where I will be able to seek a secure future with the opportunity for advancement.

Education

Trinity High School graduate 1985

Owensboro Technical College - Electronics and Electricity 1985 (1 semester 4.0 GPA)

Owensboro Community and Technical College 1995 (21credits 4.0 GPA)

Work History

February 17 2014 – October 10, 20016 Century Aluminum Hawesville, KY

Electrode Manager

Manager for the Green Mill, Carbon Bake, and Rodding departments for the Carbon Area. Primary responsibilities: Achieve KPI goals, Safety Concerns for all Employees, Environmental Compliance, Quality Metrics, Budget Goals, Continuous Productivity Improvement, Scrap Reduction, Settling Grievances, On Time Delivery (JIT), and Monitoring Operation Supplies/Materials Inventory.

June 2013 – February 2014 Alcoa Warrick Operations (Casting) Newburgh, IN

Casting Superintendent

Responsible for 2 EMC Casting Pits, Skim Room, 3 Melting Furnaces and 2 Holders.

Primary responsibilities: Safely produce the highest quality product in the industry, environmental compliance, customer incidents, and inventory supplies for JIT, throughput and recovery targets for Casting Pits, TPM and Daily Management goals, settling grievances. Achieved zero customer incidents and zero OSHA Recordables.

January 2013 – May - 2013 Alcoa Warrick Operations (Cold Mill) Newburgh, IN

Cold Mill Superintendent

Responsible for 2 Cold Mills (4 stands and 5 stands), Check Coil Line and Annealing Furnaces

Primary responsibilities: Safely produce the highest quality product in the industry; meet FDA requirements, safety, environmental compliance, customer incidents, inventory supplies for JIT, throughput and recovery targets for both Cold Mills, TPM and Daily Management targets, settling grievances. Achieved zero customer incidents and zero OSHA Recordables.

April 2011 – December 2012 Alcoa Warrick Operations (Litho/E-Coat/Prep) Newburgh, IN

Litho/Prep/E-Coat Superintendent

Responsible for Lithographic Sheet Line, Electrostatic Coating Line, Prep Line

Primary responsibilities: Safely produce the highest quality product in the industry; meet FDA requirements, safety, environmental compliance throughput and recovery, TPM and Daily Management targets for all 3 lines settling grievances. Achieved zero OSHA Recordable. I received Process Manager Sponsor of the year and received the Alcoa Blue Chip Award for outstanding performance 2012.

December 2009 –March 2011 Alcoa Warrick Operations (Litho Line) Newburgh, IN

Litho Line Area Coordinator

Responsible for Lithographic Sheet Line

Primary Responsibilities: Safely produce the highest quality product in the industry; safety, environmental compliance, throughput and recovery, TPM and Daily Management goals. Achieved zero OSHA Recordable, less than 0.5% rejection rate (world class), obtained Level 4 Daily Management and the entire line at level 3 TPM, settling grievances. I received the Alcoa Blue Chip Award for outstanding performance 2010.

March 2007 – November 2009 Alcoa Warrick Operations (Litho Line) Newburgh, IN

Litho Line Technical Assistant and Line start-up Coordinator

Responsible for Lithographic Sheet Lines startup, improvements and outage coordination.

Primary Responsibilities: safety, environmental compliance, throughput and recovery, TPM and Daily Management goals cleaning process for the A685 wash solution, trimming process and scrap conveyance, stretch leveling process, roll changes and roll hardness for each position and rewind tension monitoring. Continuous line speed improvements for the Clean Line and Trim Line. Achieved zero OSHA Recordable, obtained Level 2 Daily Management on the entire line at level 1 TPM.

May 2005 – February 2007 Alcoa Warrick Operations (Litho/E-Coat/Prep) Newburgh, IN

E-Coat/Prep Lines Technical Assistant

Responsible for project improvements and outage coordination, troubleshoot issues with engineering support.

Primary Responsibilities: safety, environmental compliance, throughput and recovery goals, coordinate outages and oversee functions, troubleshoot defects and roll changes each outage.

October 2003 – April 2005 Alcoa Warrick Operations (Prep/E-Coat Lines) Newburgh, IN

Prep Lines/E-Coat Coating Line Supervisor

Responsible for safety of hourly employees, day to day production and recovery goals, LTV, confined space entry, track overtime and absences, environmental checks, trimming audits, coating thickness audits, wax thickness audits, troubleshoot real time defects.

July 2001 – September 2003 Alcoa Warrick Operations (Coating Lines) Newburgh IN

Coil Coating Line Supervisor

Responsible for safety of hourly employees, day to day production and recovery goals, LTV, confined space entry, track overtime and absences, environmental checks, coating change on the fly team, outage coordinator, trimming process, leveling process, A685 wash solution and temperature specs, acid treatment process and temperature controls, coating room safety compliance, oven temps for drying coating, troubleshoot real time defects and coating thickness audits, wax msi audits, wax temperature controls.

April 1997 – June 2001 Alcoa Warrick Operations (Shipping) Newburgh IN

Pack/Ship

Inspector: weigh coils and check for upper/lower control limits, tail direction, OD sizes, coating wrap the correct side, correct pallet and deck pad, ensure correct lot numbers matched pallet.

Loader Checker: pull correct coil for customer loads, load trucks with correct weights.

November 1996 - March 1997 Alcoa Warrick Operations (Ingot Plant) Newburgh IN

RSI operator (operated pay loader used for skimming furnaces and operated furnace, take samples for lab, )

HDC Casting Operator (casting operator on HDC complex, mold changes and setup, operated overhead crane, operate pay loader, operate forklift, monitor casting and furnace temps, make transfers from melters to holders)

August 1991 – October 1996 Alcoa Warrick Operations (Potlines) Newburgh IN

Plotlines Tapping Equipment operator, head tapper, P&H crane operator, pot operator, equipment operator (crust breaker, payloader, waldon, forklift, mule, bobcat, backhoe, auger)

November 1985 – August 1991 Field Packing Company Owensboro, KY

Research & Development Lab (Experiment with shelf life, packaging and recipe’s)

Signode Package Line (package material per customer specification)

Cut Room

Kill Floor

Smoked Meat Department



Contact this candidate