Post Job Free

Resume

Sign in

Automation Technician

Location:
Leganés, Community of Madrid, 28917, Spain
Salary:
40000
Posted:
November 25, 2016

Contact this candidate

Resume:

*

CURRICULUM VITAE

PERSONAL DATA

Name: David Alonso Casares

SECTION AND FUNCTION

Section: Automation

Funtion: Technician

EDUCATION AND LANGUAGES

Education:

o High School specialized in Science.

o Higher Technical Certificate in Regulation Systems and Automatic Controls. o Advanced English course in Liverpool and residence in the same city for 5 months.

Additional Courses:

o PLC programming course, platform Schneider-Electric. o SCADA programming course, platform Schneider-Electric.

Languages:

o LILA English School Courses, in Liverpool.

Software PLC Experience:

Schneider Electric-> PL7, TwidoSuite, Concept y Unity Pro Siemens-> Step 7

ABB-> Advabuild

Sofware SCADA Experience:

Schneider Electric-> Vijedo Designer, Monitor Pro y Vijeo Citect ARC-> PCVue

GE Intelligent Platforms-> Ifix y Fix

2

WORK EXPERIENCE

.

2005-2008. Chemtrol División Teatro. Company works in scenic equipment (theaters, academy of music, etc Installing and commissioning control of engines, hydraulic platforms and any automatic equipment on stage.

2008-2012. Adicora Servicios de Ingeniería (Iberdrola Group). Company engaged in engineering work, supervision and electrical control of buildings and automated plant. PROJECTS:

Museo del Prado-> Control and supervision of illumination of Museo del Prado’s galleries including programmable timetables.

PLCs-> TSX Micro, programmed PL7

SCADA-> Monitor Pro

Ayuntamiento Rivas Vaciamadrid-> Supervision more than 30 buildings belong Rivas VaciaMadrid’s City Hall as police station, schools, sport centers, etc... These buildings are supervised by City Hall’s technicians managing the illumination and climate with programmable timetables. Beside SCADA installed in City Hall calculate the electrical power spent through power meters, the water and gas spent through counter, to calculate the average spending or to find out any leak in the plant.

PLCs-> Al ser una instalación tan grande cuenta con 4 tipos de PLC. o TSX Micro-> programmed with PL7

o Twido-> programmed with TwidoSuite

o M-340-> programmed with Unity Pro

o Premiun-> programmed with Unity Pro

SCADA-> There are 2 kind of SCADA, one of them is in the City Hall where it is possible to manage any of the buildings, using PCVue software and second way is through an operator panel installed in each building using Vijeo Designer Software

Supervision Solar Power Stations -> Supervision of generated power and PR calculation in solar station powers of Villamañan (León), Puertollano (Ciudad Real) and Fuenmayor

(Logroño).

PLCs-> M-340, programmed with Unity Pro

SCADA-> Vijeo Citect.

Electrical Control in TV Channel -> Supervision of the electrical control of breakers and reading of electrical measures from power meter through MODBUS.

.

3

PLCs-> M-340, programmed with Unity Pro

SCADA-> Vijeo Citect.

2012-Present -> Iberdrola Ingeniería, Company working in power station engineering. PROJECTS:

Dam’s Emergency’s Plans-> System for warning population of a possible breaking of the dam. The Dam’s Emergency’s Plan can be activated from COC (Watershed Operation Center) through communication equipment installed or from a emergency stop installed in a emergency hall on the dam.

PLCs-> M-340, programmed with Unity Pro.

SCADA-> Oasys. Installed in Watershed programmed with Operation Center.

La Muela II Hydro Power Station Commissioning -> Commissioning of La Muela II enlargement that has 4 new generators of 280MW each one and a new equipment of common systems (dam, drainage, dewatering, etc

PLCs-> Quantum, programmed with Unity Pro.

SCADA-> Ifix y Fix.

San Esteban II Hydro Power Station Commissioning -> Commissioning of La Muela II enlargement that has a new generator of 170MW and a equipment of common systems (dam, drainage, dewatering, etc

PLCs-> Quantum, programmed with Unity Pro.

SCADA-> Ifix y Fix.

Automaton S5 Substitution of Almendra’s Dam -> Replacing of S5 Automaton of Siemens on Almendra’s Dam of Villarino Hydro Power Station for a M-340 PLC Schneider-Electric, adding a new tags to monitor from control hall and from Watershed Operation Center.

PLCs-> There are 2 kinds of PLC:

o M-340-> Automaton of dam programmed with Unity Pro. o ABB PM640-> Common System Automaton that receive the tags from dam by MODBUS radio programmed with Advabuild.

SCADA-> Ifix y Fix.

Substitution of SCL (Local Control System) Cabinet on the Azutan and Cedillo Hydro Power Stations-> Are updated the control equipment, Server and UCC because they get obsolete. Server get the tags from de ABB Bus through OPC and monitor the tags with IFIX in the 4

control hall. While UCC (Control Unit Station) works like gateway getting the tags from OPC of ABB and send them to Watershed Operation Center programmed with Operation Center by IEC Protocol.

PLCs-> ABB PM640, programmed with Advabuild.

SCADA-> Ifix y Fix.

Redundant UCC (Control Unit Station) Installation on Villarino, Aldeadávila and Saucelle Hydro Stations -> Is installed a new redundant UCC for, in case of a fail of existing UCC the Watershed Operation Center can keep the management of the installation.

PLCs-> ABB PM640, programmed with Advabuild.

SCADA-> Ifix y Fix.

Hidraulic Station Project-> Are installed equipment along the river to know the level, volume and rainfall. These measures are send to Watershed Operation Center.

PLCs-> M-340, programmed with Unity Pro.

Tana Power Station Project-> Project developed in Kenya. A plant with 20 Megawatts with 4 machines.

PLCs-> Siemens S7-400 y S7-300

SCADA-> PCVue



Contact this candidate