RESUME
HVAC PROJECT MANAGER / ENGINEER
GAYAKWAD KAMLESH CHIMANRAO.
Contect Address:
Local:
P.O. BOX 22240
SAFAT- 13083
KUWAIT.
Permanent Address:
•105 RAVI APPARTMENT
• NR. ST. JOSEPH SCHOOL
• DHARAMPUR ROAD
• VALSAD-396001
• GUJARAT STATE
• INDIA.
•
•Contact telephone no : 0091 997-***-**** / 263*-****** ( WHILE IN INDIA)
•
Contact telephone no : RECENTLY RESIDE IN KUWAIT
• e- mail address:
acxmdx@r.postjobfree.com
acxmdx@r.postjobfree.com
Driving Licence:
VALID KUWAIT DRIVING LICENCE
Membership:
MEMBER OF KUWAIT ENGINEERS SOCIETY
Passport Detail:
Passport No : Z 1923675
Date of issue : 25-10-2011
Place of issue : KUWAIT
Date of expiry: 24-10-2021
Educational Qualification:
BACHLOR OF ENGINEERING ( MECHANICAL) WITH FIRST CLASS DISTINCTION 1989-90
Exam passed :
INTERNAL QUALITY AUDIT EXAM CONDUCTED BY TQM INTERNATIONAL ABU DHABI
Experience : 23 1/2Years
Abroad : 13 1/2 Years
India : 10 Years
COUNTRY
NAME OF ORGANISATION
YEARS
DURATION
POSITION
KUWAIT
UES
5 Years & 1 month
1-1-2011 TILL DATE
PROJECT MANAGER-HVAC
For KOC HOUSING AND OFFICECOMPLEX PROJECT
KUWAIT
SAYED HAMID BEHBEHANI& SONS
6 Months
FROM JUNE 2010 TO TILL DATE
SNR.PROJECT ENGINEER
KUWAIT
AL AHLIA AIRCOND.TRD. AND CONT. CO.
6 Years & 10 months
FROM JULY 2003 TO MAY 2010
COMMISSIONING AND MAINT MANAGER
INDIA
OWN BUSINESS OF HVAC
4 Years and 10 Months
0CT 1998 TO JULY 2003
OWNERSHIP
ABU DHABI
EMCO .ETA-ASCON GROUP
3 Years and 2 Months
JULY 1994 TO SEPT 1997
SITE ENGINEER
INDIA
BATLIBOI LTD.
4 Years
AUG 1990 TO JULY 1994
DEPUTY SUPRITENDENT
KUWAIT:5 YEARS 1 month
JAN 2011 TO TILL DATE :
UNITED ENGINEERING SERVICES AS PROJECT MANAGER:KOC NEW OFFICE COMPLEX AND KOC HOUSING PROJECTS
EXECUTION OF HVAC WORKS TENDERING/ERRECTION/MAINTENANCE,BUDJECTIG,COST ALLOCATION,REVENUE GENERATION,BILLING,MANPOWER RECRUITING,DEVELOPING INFRASTRUCTURE.
KUWAIT : FROM JUNE 2010 TO DEC 2010
6 MONTHS
SAYED HAMID BEHBEHANI AND SONS:
PROJECT ENGINEER:
Execution of project:Preparing technical submittal,shop drawing,arranging inspection. EPA PROJECT
KUWAIT : FROM JULY 2003 TO 30-06-2010
5 YEARS 10 M0NTHS
AL AHLIA AIR CONDITIONING TRADING AND CONTRACTING CO. :
COMMISSIONING AND MAINT MANAGER ;
Handling contract execution on commissioning and TASTING AND BALANCING(TAB),gurentee and warranty, spare parts,submittal of commissioning manuals,o & m manuals and final handing over.
•Maintenance estimation
•Modification installation
•Shop drawing preparation
•Technical submittal preparation and preparing compliance statement.
•Supervision of installation of hvac system
•Handling inspection with consultant/client etc.
•Project close out document preparation
•Material take off.
•Floting inquiries
•Comperative statement.
•Ordering material.
•Follow up
PROJECTS DONE
•AZ ZOUR OPEN and combine CYCLE GAS TURBINE power plant( ECGV 800 CENTRIFUGAL CHILLER 800TR* 4 NOS, RTAB 214 * 4NOS SCREW AIR COOLED CHILLER)
•MISHREF PUMPING STATION( PACKAGE/SPLIT A/C AND VENTILATION FANS)
•KUWAIT PETROULIM COMPANY OIL SECTOR COMPLEX. SHOUKH( PERTRA RECIPROCATING CHILLER 160 TR* 2 NOS)
•CARE CENTER FOR MENTALLY HANDICAPPED-SOUTH SABAHIYA( ECGV 500 CENTRIFUGAL CHILLERS 500TR* 4 NOS)
•KOC TELECOMMUNICATION FACILITY CENTER ( PETRA PACKAGE A/C )
•HEALTH SCIENCE CENTER KUWAIT UNIVERSITY-JABARIYA ( YORK CENTRIFUGAL CHILLER 1500TR*4 NOS )
•MOH FARVANIA AND JAHARA( PETRA RECIPROCATING CHILLERS INCLUDING BOILERS)
•MOH AMIRI HOSPITAL( CARRIER CENTRAFUGAL CHILLERS 300TR*2 NOS REPLACEMENT JOB)
•SHEIKH BADAR PALACE- MESSILA ( CARRIER PACKAGE A/C)
•PUBLIC AUTHORITY FOR YOUTH AND SPORTS( 3 YEARS MAINTENANCE CONTRACT)
•SUBIA WATER DISTRIBUTION.
•SARA AL SABAH FINTAS RESORT-SAFIR HOTEL.( TRANE SCREW CHILLERS 165 TR* 5 NOS, CARRIER SPLIT A/C)
•EMERGENCY POWER PLANT SHOUKH / SUBIYA / AL ZOUR ( CARRIER PACKAGE A/C )
ABU DHABI(UAE): 3 YEAR and 2 Months
JULY 1994 TO OCT 1997:
EMCO-ETA ASCON GROUP:
SITE ENGINEER:
PASSED INTERNAL QUALIT AUDIT EXAM CONDUCTED BY TQM INTERNATIONAL-DUBAI.
ACTIVITY:
Planning of maintenance activity,Yearly and monthly planning preparing monthly reports,spares planning and procurement,administrating maintenance work order,coordinating with clients.Inspection of site,assisting in fault finding and trouble shooting.Maintenance tendering,installation.
Organisating quality circle meeting,safety tool box talk.
Involved in writing quality procedure for ISO 9000 qualiyy system,installation of procedures,internal quality audit.
PROJECTS DONE :
•AMIRI FLIGHT- INTERNATIONAL AIR PORT FOR ROYAL FAMILY AND DIGNITORIES.
24 HOURS FULL ELECTRICAL AND MECHANICAL OPERATION AND MAINTENANCE OF
•HVAC and BMS( YORK RECIPROCATING CHILLERS 3500 TR TOTAL CAPACITY)
•Fire fighting and fire alarm
•Plumbing
•Sewage pumping
•Generators
f Elevators and ascalators
g Air bridge
•ABU DHABI DEFENCE - 4500 TR TOTAL CAPACITY
Maintenance and operation and up gradation of HVAC system( YORK RECIPROCATING CHILLERS / TRANE RECIPROCATING CHILLERS)
•Manhal palace
•Intelangence
•Infentary
•Khawala bint al azwar school
•Tank regiment
•Special force
•SOHYAN DEFENCE CITY ( HITACHI /CARRIER / YORK AIR COOLED CHILLER TOTAL 217 NOS / PACKAGE A/C 1700 NOS)
Mobilisation of UAE`S SINGLE LARGEST HVAC MAINTENANCE CONTRACT WORTH AED 32 MILLION.
WORKSHOP AND SEMINAR ATTENDED ON:
1 Awareness ISO9000
2 Internal quality audit
3 Goal setting
4 Stores management
5 Just in time inventory management
6 Health and safety
7 Permit to work procedure for oil and power projects
INDIA: 4 YEARS
AUG.1990 TO JULY 1994
BATLIBOI LTD.
DEPUTY SUPRITENDENT
Batliboi is one of the renowned airconditioning equipments manufacturing and marketing company in India.
ACTIVITY:
Head of production planning and control(compressor,chiller,package air conditioner).Development of compressor,testing and commissioning and trouble shooting and attending service call.
In house installation of HVAC.
Iniciated and Implimented quality system procedure ISO 9000.,Internal quality audit.
Formation of quality circle,value analysis and value engineering.
PROJECTS DONE: ( BATLIBOI-DAIKING RECIPROCATING CHILLERS)
•CENTURY ENKA-BOMBAY
•RUBY MILLS-BOMBAY
•DINESH MILLS- BARODA
•DOT GAULIGUDA-SECUNDRABAD
•BHALAI STEEL PLANT- BHILAI
•IN HOUSE INSTALLATION-SURAT
INDIA: 5 YEARS ( Note: Experience certificate not available)
OCT 1998 TO JULY 2003
OWN BUSINESS OF HVAC DEALERSHIP OF BLUE STAR PACKAGE AIR CONDTIONER
PROJECTS DONE:
•Installation of 15TR*6 nos. water cooled package air conditioner at RELIANCE INDUSTRIES HAJIRA – SURAT.
•Installation of 15TR*3nos air cooled package air conditioner at POLYTHINE BAF MFG. CO. DAMMAN.
•ASSEMBLE 12TR*2 nos chillers for PRINCE SWR PIPES FOR PROCESS COOLING.
•Assemble and installed 5TR*2 nos conveyor DX unit for inhaler cooling for ANCHOR HEALTH CARE.
•Installed 6000cfm*2 nos AHU for BIOCHEM PHARMA FOR anti cancer injection and tablets.
•Maintenance and repairing CONTRACT of DEPARTMENT OF TELECOM package airconditioners.
•Ducting works of taxtile and pharma industries.
•Installation of booster water pump for VALSAD MUNICIPALITY for city water.
•Kamlesh Gayakwad.
Kuwait.